Records from 2016 to 2023. Most recent: inspection, 20 January 2023.
Inspection history · 9
20 January 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7624557
10 September 2022
COC-TVE Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7555643
21 April 2022
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7435642
7 October 2021
COC-TVE Annual · PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7327966
9 September 2020
PSC B · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7054139
24 February 2019
ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6631242
23 December 2017
ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6328333
11 March 2017
ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6099588
21 January 2016
Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5801432
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 September 2022
Resolved
An efficient bilge pumping system shall be provided, capable of pumping from and draining any watertight compartment other than a space permanently appropriated for the carriage of fresh water, water ballast, oil fuel or liquid cargo and for which other effective means of pumping are provided, under all practical conditions. PSCO observed bilge/fire/GS pump #1 inoperable. 74SOLAS(20) II-1/35-1.2.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2022
Resolved 20 January 2023
Resolution: Vessel sent in class report attesting to properly functioning bilge/fire/GS pump #1.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 September 2022
Resolved
Doors required to be self-closing shall not be fitted with hold back hooks. PSCO observed doors on the A deck are identified in the fire control plan as self closing and fitted with hold back hooks. 74SOLAS (20) II-2/47
Action required: 10 - Deficiency Rectified
Resolved 10 September 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 September 2022
Resolved
After any survey on the ship under regulation 7,8,9 or 10 has been completed, no change shall be made in the structural arrangement, machinery, equipment and other items covered by the survey, without the satisfaction of the Administration. Flame screen on number 4 port and 6 stbd cargo tank P/V valves has larger holes than permitted under flame screen mesh size requirements. 74SOLAS(20) I/11(b)
Action required: 10 - Deficiency Rectified
Resolved 10 September 2022
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 24 February 2019
Resolved
Every ship 400 gross tonnage and above shall carry a garbage management plan that the crew shall follow. This plan shall provided written procedures for collecting, storing, processing and disposing of garbage including the use of equipment onboard. The garbage management plan is not being followed, the PSCO observed plastics in the incinerator. The garbage management plan onboard specifically states that incineration of all plastics is prohibited.
Action required: 10 - Deficiency Rectified
Resolved 24 February 2019
Resolution: PSCO examined the garbage record book and observed no other instances of incineration of plastics onboard, as well as reviewed garbage management plan to ensure that the burning of plastics is forbidden
Deck/Cargo › Inert Gas System › IGS Scrubber
Issued 11 March 2017
Resolved
CODE: 1840 CITE: 74 SOLAS(14 CONS.)II-2/4.5.5.3.2 ACTION: 40ac
The intert gas system referred to in paragraph 5.5.3.1 shall be designed, constructed and tested in accordance with the Fire Safety Systems Code. The vessel's installed IGS O2 analyzer is not working as required by FSS Code. Vessel is using portable O2 meter to monitor IGS operation.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 March 2017
Resolved 14 March 2017
Resolution: Received class report attesting that PCB Board was replaced on O2 analyzer and serviced by tech, after replacement normal operation was restored.