Records from 2011 to 2026. Most recent: inspection, 29 April 2026.
Documentation record
Registered dimensions (L × B × D)50.0 ft × 15.5 ft × 8.5 ft
Registered tonnagegross 32 / net 29
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHAROLD A BURNHAM · ESSEX, MA, UNITED STATES · built 2011
Hull materialWood
PropulsionDiesel Direct
Hull shapeSail (Distinct Keel)
Hull configurationMonohull
Hailing portGLOUCESTER, MA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 12 August 2026 · expires 31 August 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it32 - Simplified, Gross Ton
29 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 29
29 April 2026
Internal Structural Exam · Drydock Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8357885
12 November 2025
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8259319
11 March 2025
Plan Review "T" Boat
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8110062
5 November 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8029017
26 April 2024
Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7832309
21 September 2023
Annual Inspection · Inclining Experiment
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7821804
9 May 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7686015
10 November 2022
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7590357
3 May 2022
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7444386
15 November 2021
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7351058
19 August 2021
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7288125
14 May 2021
Administrative Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7196830
13 November 2020
Drydock Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7089835
21 September 2020
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7059800
7 November 2019
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6850607
10 May 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6681230
15 November 2018
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6580709
7 November 2018
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6579757
20 April 2018
In-Service Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6397354
26 October 2017
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6294895
23 May 2017
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6188437
10 May 2017
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6143234
12 April 2017
Construction Oversight
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6122928
1 November 2016
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6033282
25 August 2016
COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5982967
29 July 2016
In-Service Inspection · DAPI Audit
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5915555
13 November 2015
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5764495
29 September 2015
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5731656
1 September 2011
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4132016
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 November 2024
Resolved
Each ring life buoy on a vessel must:(1) Be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. MI observed the ring life buoy on board was severely deteriorated and in need of replacement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2024
Resolved 2 December 2024
Resolution: Operator submitted photographic evidence that a new ring buoy had been installed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 November 2024
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. MI observed several electrical connections in the engine room that were not covered.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2024
Resolved 2 December 2024
Resolution: Operator provided photographic evidence that the wire connections had been covered.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 November 2024
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. MI observed that the waste recepticle on board was made of combustible material(wood).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2024
Resolved 2 December 2024
Resolution: Operator submitted photgraphic evidence that a metal waste recepticle had been installed on the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 9 May 2023
Resolved
A vessel on a limited coastwise route must be provided with inflatable buoyant apparatuses with an aggregate capacity that will accommodate at least 67% of the total number of persons onboard. All of the vessel's IBAs have been removed for annual servicing. The vessel is limited to a lakes, bays, and sounds route of not more than one nautical mile from shore.
Action required: 705 - Other - as specified
Resolved 21 September 2023
Resolution: Verified serviced IBA was onboard and installed correctly.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 14 May 2021
Resolved
A VESSEL ON A LIMITED COASTWISE ROUTE MUST BE PROVIDED WITH INFLATABLE BUOYANT APPARATUS OF AN AGGREGATE CAPACITY THAT WILL ACCOMODATE 67% OF THE TOTAL NUMBER OF PERSONS ON BOARD. THE VESSEL'S IBA HAS BEEN REMOVED FOR ANNUAL SERVICING; THE VESSEL IS LIMITED TO A LAKES, BAYS, AND SOUNDS ROUTE NOT MORE THAN ONE NAUTICAL MILE FROM SHORE UNTIL THE IBA HAS BEEN RE-INSTALLED TO THE SATISFACTION OF THE COAST GUARD.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 May 2021
Resolved 25 June 2021
Resolution: IBA has been properly reinstalled.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 7 November 2019
Resolved
The owner or operator must conduct all tests as required by the OCMI, and make the vessel available for all specific inspections and drills required by subpart H of this part.
During the annual inspection, no underway inspection or drills were conducted due to inclement weather conditions. Must conduct required drills and underway inspection under sail to satisfaction of attending Marine Inspector prior to carrying passengers, but no later than 31MAY2020.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 May 2020
Resolved 14 November 2019
Resolution: Vessel satisfactory performed underway inspection and man overboard drill.
Sail Rigging › Spars › Boom and Gooseneck Fitting
Issued 26 October 2017
Resolved
Make permanent repair to crack on foreboom
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 24 April 2018
Resolution: Saw photo of repair.
Sail Rigging › Running Rigging › Halyards
Issued 26 October 2017
Resolved
Replace block on throat halyard for main boom.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 24 April 2018
Resolution: Inspected refurbished blocks.
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 1 November 2016
Resolved
THE VESSEL'S 50-PERSON IBA IS DUE FOR ANNUAL SERVICING. THE VESSEL IS LIMITED TO A LAKES, BAYS, & SOUNDS ROUTE NOT MORE THAN ONE NAUTICAL MILE FROM SHORE UNTIL THE IBA HAS BEEN SERVICED AND RE-INSTALLED TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 23 May 2017
Resolution: Vessel rep installed life raft satisfactory.
Communications › Alarms/Indicators › Bilge Alarm
Issued 29 July 2016
Resolved
Provide bilge high water alarm for the forepeak compartment.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 25 August 2016
Resolution: Bilge alarm installed in forepeak compartment.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 29 July 2016
Resolved
Provide fire extinguisher for each accomodation space. The center accomodation space has no fire extinguisher installed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 25 August 2016
Resolution: Fire extinguisher has been installed in center accomodation space.
Lifesaving › Buoyant Apparatus › Quantity
Issued 29 September 2015
Resolved
Removed for servicing
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 October 2015
Resolved 6 October 2015
Resolution: Recieved photograph of proper installation.
Documentation › Certificates/Documents › FCC SSL
Issued 1 September 2011
Resolved
Vessel does not have a valid FCC Station License or FCC Operator's Permit. Vessel's operation is restricted to 1000' from shore.
Action required: 705 - Other - as specified
Due 1 September 2011
Resolved 9 September 2011
Resolution: Owner/operator provided FCC Station License and FCC Operator''s Permit.