Records from 2016 to 2024. Most recent: inspection, 7 August 2024.
Inspection history · 16
7 August 2024
PSC B · COC-TVE Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7976027
6 September 2022
Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7549665
26 August 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7543999
15 June 2022
PSC B · COC-TVE Annual · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7471848
7 April 2022
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7426679
17 May 2021
COC-TVE Renew · PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7191190
17 March 2020
COC-TVE Annual · PSC B
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6924655
6 January 2019
Ballast Water Examination · COC-TVE Renew · ISPS II Exam · COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6603506
1 October 2018
COE-Dockside · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6552190
6 September 2018
COE-Administrative
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6531402
22 March 2018
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6376655
26 January 2018
COC-TVE Annual · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6344062
25 September 2017
COE-Dockside · COE-Administrative
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6269598
1 March 2017
COE-Dockside · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6096882
14 January 2017
COE-Administrative
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6071094
15 November 2016
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6039708
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 6 September 2022
Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this
subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or ballast
with water from a U.S. public water system, according to the schedule in paragraph (b) of this section.
Subject vessel, of keel laid date 31DEC2009 and ballast water capacity of 41121 m3, is past its compliance date per the implementation schedule in 33 CFR
151.2035 (b). Currently, vessel’s installed BWTS is inoperative.
Vessel is not authorized to discharge untreated ballast into the waters of the U.S. without prior written authorization from the local Captain of the Port under the
provisions of 33 CFR 151.2040 (b).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 14 September 2022
Resolution: Vessel provided class documentation attesting to the rectification of the BWTS deficiency.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 June 2022
Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks. Observed 02 class A self closing doors fitted with hold back devices.
74 SOLAS(09)II-2/9.4.2.2
Action required: 10 - Deficiency Rectified
Resolved 22 June 2022
Resolution: Vessel removed hold backs from effected doors.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 June 2022
Resolved
In Tankers cargo pumps, ballast pumps, and stripping pumps, installed in pump rooms shall be fitted with temperature sensing devices for bulkhead shaft glands, bearings and pump casings. The bearing temperature sensor on the #2 COP was fully retracted from its housing.
74 SOLAS (09) II-2/4.5.10.1.1
Action required: 10 - Deficiency Rectified
Resolved 22 June 2022
Resolution: Vessel reinstalled the sensor.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 15 June 2022
Resolved
Each item of remote operating or indicating equipment, such as a remotely operated valve, tank level alarm, or emergency shutdown device, must perform its intended function. PSCO observed that the portside ESD did not actuate the closure of the portside #3 cargo line valve. Vessel can only close valve from CCR and STBD side ESD.
33CFR156.170(c)(5)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 June 2022
Resolution: RINA provided class report attesting to completed repairs and satisfactory test of the #3 COP ESD at the Port ESD
Engineering › Steam System (auxiliary) › Piping
Issued 26 January 2018
Resolved
Steam line passing through the purifier space was found to be leaking. The pipe in refernce is the steam pipe to the HFO settling tank.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 25 February 2018
Resolved 8 February 2018
Resolution: Received class report attesting to the corrective actions taken rectifying the deficiency.