Records from 2016 to 2017. Most recent: inspection, 25 September 2017.
Engineering › Fuel Oil Service System › Piping
Issued 3 September 2017
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed leak line and drain box on number 2 & 3 generators not operating properly with excess fuel oil leaking in area. 74SOLAS(04)II-2 Reg4.1.1 Action 40a/c
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 September 2017
Resolution: Both drain boxes on no.2 and no.3 generators were rapaired and found in working condition by attending DNV-GL surveyor.
Engineering › Fuel Oil Service System › Filter
Issued 3 September 2017
Resolved
Equipment shall be maintained to conform with the present regulations. PSCO observed fuel oil purifier No.2 not operable. 74 SOLAS(04)I Reg11 Action 40a/c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 September 2017
Resolution: Fuel oil purifier no.2 was overhauled and replaced with spare parts by ship crew and in working condition.
Engineering › Compressed Air System (start air) › Compressor
Issued 3 September 2017
Resolved
Equipment shall be maintained to conform with the present regulations. PSCO observed air compressor not operable. 74 SOLAS(04)I Reg11 Action 40a/c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 September 2017
Resolution: Both starting air compressors were operational tested by attending DNV-GL surveyor after rectification by ship crew.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 3 September 2017
Resolved
Equipment shall be maintained to conform with the present regulations. PSCO observed pump #2 on hydraulic power unit for ballast, bilge and fuel valves leaking hydraulic fluid. 74 SOLAS(04)I Reg11 Action 40a/c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 September 2017
Resolution: Seal rings for pump 1 and 2 on hydraulic power unit for ballast, bilge and fuel valves were replaced by ship crew and checked by surveyor, no leaking fluid found.
Engineering › Fuel Oil Service System › Valve
Issued 3 September 2017
Resolved
Service tank having a capacity of 500L and above shall be fitted with a valve capable of being closed from outside the space. PSCO observed valve on #2 tank in emergency generator room not operable. 74SOLAS(04)II-2 Reg4.2.2.3.4 Action 40a/c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 September 2017
Resolution: Quick closing valve on no.2 E/G DO tank was rectified by ship crew and functional tested by surveyor, found in working condition.