The 2 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Share this recordDownload vessel cardDownload QRMaury, US Coast Guard vessel record for ROSITA, retrieved 18 September 2026. mauryrecords.com/v/psix-1097506.html
Documentation record
Tonnage as PSIX records it30076 - Convention (Subpart B), Gross Ton 18207 - Convention (Subpart B), Net Ton 52338 - Dead Weight, Ton 60772 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 2
19 June 2016COE-Administrative
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5911798
27 April 2016PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5857660
1499 - Other (Prop & Aux Machinery) Every steam pipe and every fitting connected thereto which steam may pass shall be so designed, constructed and installed as to withstand maximum working stresses to which it may be subjected. PSCO observed steam leaking out of the isolation valve for the sight glass on the boiler. 74 SOLAS (09) II-1/33.1 16a
Action required: 705 - Other - as specified
Due 11 May 2016
Resolved 2 May 2016
Resolution: Received, reviewed and accepted class report from DNV-GL stating the deficiency was rectified. Sight glass on boiler was renewed and observed in operation with no signs of leakage.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 27 April 2016Resolved
0999 - Other (safety in general) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed a cracked hydraulic line for the cargo hatch covers which was found to be leaking. 74 SOLAS (09) I/11 16a
Action required: 705 - Other - as specified
Due 11 May 2016
Resolved 2 May 2016
Resolution: Received, reviewed and accepted class report from DNV-GL stating the deficiency was rectified. Hydrualic pipe was replaced flange to flange. The hatch cover was opened and closed several times and observed with no defects.
0945 - Emergency Lighting, etc. - Muster and embarkation stations shall be adequately illuminated by lighting. PSCO observed several emergency lights that were inoperable as well as emergency fixtures that were not marked as indicated on the fire control plan. Crew was not able to replace all non-working bulbs or paint fixtures while PSCO was on board. 74SOLAS (09) III/11.4 16a
Action required: 705 - Other - as specified
Due 11 May 2016
Resolved 2 May 2016
Resolution: Received, reviewed and accepted class report from DNV-GL stating the deficiency was rectified. All emergency lights replaced and ovbserved to be in order.
Engineering › Steam Boiler (propulsion) › Piping
Issued 27 April 2016Resolved
1499 - Other (prop & aux machinery) - Every steam generating system that provides services essential for the safety of the ship or which could be rendered dangerous by the failure of its feed-water supply.. PSCO observed fresh water line installed not as originally designed to feed the boiler fresh water tank. 74 SOLAS (09) II-1/32.4 50a
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 2 May 2016
Resolution: Received, reviewed and accepted class report from DNV-GL stating the deficiency was rectified. Unapproved boiler feed line plugged.
0699 - Other (life saving appliance) - Emergency escape breathing devices shall comply with the fire safety systems code. Spare EEBD's shall be kept on board. PSCO observed an EEBD in the engine room with an air gauge reading of zero. 74 SOLAS (09) II-2/13.3.4.1 10c
Action required: 705 - Other - as specified
Due 27 April 2016
Resolved 27 April 2016
Resolution: Ship's crew replaced EEBD with a spare.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.