Records in 2011. Most recent: operational control imposed, 14 December 2011.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
14 December 2011
PII Safety Exam · ISPS II Exam · Deficiency Check · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4205485
26 February 2011
STCW 95 Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3953259
22 February 2011
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3949947
20 February 2011
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3948928
19 February 2011
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3945252
18 February 2011
COE-Offshore · ISPS I Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3947944
Electrical › Electric Generation Source (emergency) › Generator
Issued 14 December 2011
Resolved
0950-Electric Equipment in General-Where electrical power is necessary to restore propulsion, the capacity shall be sufficient to restore propulsion with other machinery as appropriate within 30 minutes. PSCO observed that the secondary means of start on the emergency diesel generator (hand crank) was not operational. SOLAS 74(am) II-43
Action required: 17 - Rectify deficiencies prior to departure
Due 14 December 2011
Resolved 15 December 2011
Resolution: Received, reviewed and accepted class report from [name withheld] attesting to the installation of a secondary battery bank
Documentation › Logs/Records › Oil Record Book
Issued 20 February 2011
Resolved
The oil record book shall be completed on each occasion, on a tank to tank basis. While conducting an exam of the oil record book several inconsistencies were noted in comparison to the daily sounding log. See Scanned in Form B for complete def. Not enough space to fully write out deficiency.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 20 February 2011
Resolved
The condition of the ship and its equipment shall be maintained in to conform with the provisions of the present regulations to ensure to conform with the provisions of the present regulations to ensure the ship is fit for sea. There are several buckets of paint and oil stored in a void space in the spare parts room in the engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Lifesaving › Lifeboat Equipment › Food Ration
Issued 20 February 2011
Resolved
Normal lifeboat equipment of every lifeboat shall consist of food rations for each person the lifeboat is to accomodate. The life boat only has food rations for 25 people and not the 27 required.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2011
Lifesaving › Lifeboat Equipment › Water/Water Receptacles
Issued 20 February 2011
Resolved
Lifeboat equipment shall consists of 3 liters of water per person. The lifeboat currently only has enough water for 25 people and not the 27 it can accomodate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2011
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 20 February 2011
Resolved
PSCO's discovered a flexible hose and associated flanges that were being used to bypass the OWS. By bypassing the OWS there is no way to ensure oily waste being discharged overboard and not exceeding 15 ppm. See attached Form B for more information. Vessel is detained. MARPOL 73/78 (06 cons) Annex I, Ch. III Reg. 12.2 and 15.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Documentation › Safety Management System › Safety/Environmental Protection Policy
Issued 20 February 2011
Resolved
The approved SMS is not effectively implemented on board. A major non-conformity in way of a lack of effective and systematic implementation of the requirements of ISM code exists with regard to the company's Safety Management Manual, Document FIM-E-05. This non-compliance with the SMS is evident as noted in the deficiencies #001 and #002. Recommend an external audit of the SMS. Vessel is detained
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 20 February 2011
Resolved
For batch-loaded shipboard incinerators, the unit shall be designed so that the temperature in the combustion chamber shall reach 600 deg. C. within five minutes after start-up. The incinerator took 22 minutes to reach 600 deg. C.
MARPOL 73/78, (2006 Cons. Ed.) Annex VI, CH III, Reg 16.9
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 March 2011
Resolved 14 December 2011
Resolution: Received, reviewed and verified class report from [name withheld] stating the deficiency was rectified. Incinerator has been tested and successfully reached 600 deg. C. within 5 minutes of start-up.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 20 February 2011
Resolved
All ships shall possess a manufacturer's operating manual which shall specify how to operate the incinerator. The Chief Engineer was initially unable to locate the operating manual. A full day later, the Chief Engineer was finally able to provide a short photocopied section of the operating manual. MARPOL 73/78, (2006 Cons. Ed.) Annex VI, CH III, Reg 16.7.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 March 2011
Resolved 14 December 2011
Resolution: Received, reviewed and verified class report from [name withheld] stating the deficiency was rectified. Chief Engineer located operating manual for ship''s incinerator.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 20 February 2011
Resolved
Personnel responsible for operation of any incinerator shall be trained and capable of implementing the guidance provided in the manufacturer's operating manual. Ship's ingineers were unfamiliar with guidance in the (missing) operating manual. See scanned Form B for further info. MARPOL 73/78, (2006 Cons. Ed.) Annex VI, CH III, Reg 16.8.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 March 2011
Resolved 14 December 2011
Resolution: Received, reviewed and verified class report from [name withheld] stating the deficiency was rectified. Owner changed management and crew of vessel, new crew has been trained in the operation of the incinerator.