Records from 2016 to 2025. Most recent: inspection, 6 August 2025.
Inspection history · 26
6 August 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8195414
11 January 2025
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8062163
28 November 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7830826
17 June 2023
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7716805
14 February 2023
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7636379
10 February 2023
PSC B
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7633864
7 December 2022
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7605462
26 September 2022
PSC B · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7566131
25 September 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7565893
29 August 2022
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7546075
12 May 2022
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7448966
12 May 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7450985
11 May 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7469691
24 April 2022
MARPOL Annex I Examination · PSC B · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7437010
12 April 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7429431
26 December 2020
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7108995
1 October 2020
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7069163
1 October 2020
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7070444
27 September 2020
Administrative Inspection · PSC B · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7064370
13 December 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6873222
22 January 2019
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6613463
25 October 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6567821
22 October 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6565528
12 October 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6560294
22 December 2017
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6328055
30 September 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6013139
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 January 2025
Resolved
Main and auxiliary machinery essential for the propulsion, control and safety of the ship shall be provided with effective means for its operation and control. Vessel reported a main engine governor servo drive PBC (printed circuit board) unit failure.
74 SOLAS (20) II-1/31.5.1
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 18 January 2025
Resolved 12 January 2025
Resolution: Vessel provided class report attesting to satisfactory repair of governor servo drive PCB.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 13 February 2023
Resolved
Life buoys compliying with the requirements of the code shall be: so stowed as to be capable of being rapidly cast loose, and permantely secured in anyway.
Port forward life ring bracket unable to hold life ring due to broken cradle. Life ring is loose on the deck. Solas 74 2020ED III/ 7.1.1.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 14 February 2023
Resolution: Vessel attached a new bracket to the life ring cradle.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 13 February 2023
Resolved
The deckline...shall be marked amidships on each side of the ship...the ring lines and letters shall be painted in white or yellow on a dark ground...
Vessel's deckline is not visible due to wear and rust. ICLL 2000ED Regulation 08
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 14 February 2023
Resolution: New deck line painted on hull.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 26 September 2022
Resolved
With the town pumps simultaneously delivering water through the nozzles specified in paragraph 2.3.3, with the quantity of water as specified in paragraph 2.1.3, through any adjacent hydrants, the following minimum pressures shall be maintained at all hydrants: for cargo ships, 6000 gross tonnage and upwards: 0.27N/mm^2. PSCO observed inadequate pressure from portside bridgewing hydrant.
74 SOLAS 2014 cons., II-2/10.2.1.6.2
17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 26 September 2022
Resolved 29 September 2022
Resolution: Received, reviewed and accepted operational safety inspection from Marshall Islands. Emergency fire pump tested. Test satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 26 September 2022
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed rescue boat was unable to start for a period of 25 minutes, in addition, no cooling water was observed.
74 SOLAS 2014 cons., III/20.2
17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 26 September 2022
Resolved 29 September 2022
Resolution: Received, reviewed and accepted operational safety inspection from Marshall Islands. Impeller and seal replaced by crew. Operational test satisfactory.
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 26 September 2022
Resolved
On all ships, within the machinery spaces, emergency escape breathing devices shall be situated ready for use at easily visible places, which can be reached quickly and easily at any time in the event of fire. The location of emergency escape breathing devices shall take into account the layout of the machinery space and the number of persons normally working in the space. PSCO observed EEBDs in the engine room not ready for immediate use.
74 SOLAS 2014 cons., II-2/13.4.3.1
17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 26 September 2022
Resolved 29 September 2022
Resolution: Received, reviewed and accepted operational safety inspection from Marshall Islands. Vessel EEBD's replaced.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 26 September 2022
Resolved
Bulk carriers shall be fitted with water level detectors in each cargo hold, giving audible and visual alarms. PSCO observed system abnormal fault on water ingress alarm system for #1 cargo hold.
74 SOLAS 2014 cons., XII/12.1.1
17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 26 September 2022
Resolved 29 September 2022
Resolution: Received, reviewed and accepted operational safety inspection from Marshall Islands. Water ingress panel tested satisfactory.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 26 September 2022
Resolved
Following installation, the master, owner, operator, agent, or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications. PSCO observed two inoperable suction valves that were being manually bypassed in order to operate the BWMS. Request class to attest to current configuration of system.
33 CFR 151.2025(a)(1)
16ac
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 October 2022
Resolved 29 September 2022
Resolution: Received, reviewed and accepted operational safety inspection from Marshall Islands. Class attests to manual operation of pneumatic valves.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 12 May 2022
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. In meeting these requirements, the company should ensure that inspections are held at appropriate intervals and records of these activities are maintained. In reviewing Annex I of the vessel's on board technical manual, PSCO received objective evidence that nearly 100% of the maintenance items were beyond the specified maintenance interval. Furthermore, the vessel is unable to produce records of maintenance completed for an extended period of time.
SOLAS 74(a)
2020 Cons.
IX/3.1
ISM Code
10.1
10.2.1
10.2.4
60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 May 2022
Resolution: Received satisfactory class report. Attached to documents.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 11 May 2022
Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part I, so that all entries in the bok appropriate to that operation are completed. PSCO observed multiple entries in the Oil [name withheld] indicating that required operations are not being accurately recorded; with emphasis on entries regarding the Waste Oil Tank and Incinerator Waste Oil Tank between 03Apr2022 and 24Apr2022. Oil record book entries regarding the collection, transfer, and disposal of bilge and sludge between March 2022 and April 2022 do not align with onboard sounding records described in deficiency 03, or crew statements regarding onboard operations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 May 2022
Resolution: Received/accepted satisfactory class report. See attached.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 11 May 2022
Resolved
In a ship which oil fuel is used, the arrangements for the storage, distribution, and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons onboard. PSCO observed fluctuations in fuel oil overflow tank levels. Crew reported fuel oil is leaking into fuel day tanks, causing them to overflow into fuel oil overflow tank.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 May 2022
Resolution: Received/accepted satisfactory class report. See attached.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 11 May 2022
Resolved
The Company should ensure that the [Environmental-Protection] policy is implemented and maintained at all levls of the organization, both ship-based and shore-based. PSCO observed Envronment Management System Manual, Chapter 03, Page 2 of 37 which states, "A separate register daily IOPP tank soundings register TE39 is supplied to maintain daily tank soundings. The register is to be filled with permanent ink...The readings of this register and the ORB quantities should match accurately." Crew was unable to provide any records that register TE39 had evern been filled out, and PSCO observed that a digital spreadsheet is being used in its place since February 2022.
SOLAS IX/3.1, ISM Code 2.2
Due 11 August 2022
Resolved 15 May 2022
Resolution: Received/accepted satisfactory class report. See attached.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 26 December 2020
Resolved
The physical condition and proper storage of mooring lines and ropes to ensure that they are free of damage and defects and are not exposed to conditions which could lead to their deterioration and eventual failure. PSCO observed a deterioated mooring line. ILO-147/PWSA 46USC70002; 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 December 2020
Resolution: Received, reviewed and accepted Class attendance report from [name withheld] stating the deficiency was rectified. Damaged moorning rope replaced with new mooring rope and remainder of lines examined and found free from damage.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 September 2020
Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO observed fuel oil accumulation and leaks from fuel delivery valves in the galleries on all three generators. 74SOLAS(09)II-2/4.2.2, 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2020
Resolution: Received, reviewed and accepted class report from [name withheld] stating a Condition of Class with due date 31OCT2020 for repair and verification is imposed .Crew will continue monitoring and eaning daily, and HFO will be used when permitted.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 27 September 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. PSCO observed two soft patches on port side bunker lines. 74SOLAS(14)I/11a, 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2020
Resolution: Received, reviewed and accepted class report from [name withheld] stating Condition of Class imposed with due date 31OCT2020 for repair and verification. Repair is scheduled at next port and ship is planning to keep this line section not in use.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 27 September 2020
Resolved
Except as provided in paragraph 3 of this regulation, any ship of 10,000 gross tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7 of this regulation. Vessel reported oily water separator inoperable. MARPOL I/14.2, 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2020
Resolution: Received, reviewed and accepted class report from [name withheld] stating Short Term IOPP certificate with expiration 28OCT20 issued for completion of repair. OWS inlet valve removed and piping sealed.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 30 September 2016
Resolved
74SOLAS (09) II-2/9.1.3 The purpose of this regulation is to contain a fire in the space of orgin. For this purpose, the following functional requirements shall be met: the fire integrity of the divisions shall be maintained at openings and penetrations. A class A boundary in the crews laundry has unapproved penetrations for a door tie-back. 40a.c.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 23 December 2016
Resolution: Recieved class report attesting to the repair of the class a bulkhead.
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 30 September 2016
Resolved
MARPOL ANNEX I/13 Enable pipes of reception facilities to be connected with the ship's discharge pipeline...fitted with a standard discharge connection in acccordance with the following table: 6 holes 22mm in diameter equidistantly placed on a bolt circle of periphery. The stbd side standard discharge conn has only 4 slotted holes. 40a.c.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 23 December 2016
Resolution: Recieved class report attesting to the repair of the standard discharge connection.