Records from 2012 to 2026. Most recent: inspection, 13 May 2026.
Documentation record
Registered dimensions (L × B × D)268.8 ft × 64.0 ft × 24.5 ft
Registered tonnagegross 4,381 / net 1,314
ITC dimensions (L × B × D)268.8 ft × 64.0 ft × 24.5 ft
ITC tonnagegross 4,381 / net 1,314
BuilderEASTERN SHIPBUILDING GROUP INC · PANAMA CITY, FL, UNITED STATES · built 2012
Hull materialSteel
PropulsionDiesel Electric
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portGALLIANO, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 18 November 2025 · expires 30 November 2026
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4381 - Convention (Subpart B), Gross Ton
4689 - Dead Weight, Gross Ton
1314 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 22
13 May 2026
ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8354297
19 February 2026
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8312933
5 November 2025
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8268218
21 March 2025
ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8097390
14 March 2025
ACP Drydock Oversight
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8094030
27 September 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8011417
1 July 2024
Annual Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7946210
3 May 2023
ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7680085
4 April 2022
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7424021
30 March 2021
Annual Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7165317
8 September 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7078437
10 April 2020
ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6937760
22 May 2019
MTSA/ISPS Verification · Annual Inspection · ACP Annual Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6690490
26 January 2019
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6649281
2 May 2018
Annual Inspection · Administrative Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6404176
28 March 2017
Annual Inspection · MTSA/ISPS Verification · ACP COI Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6112806
11 October 2016
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6020482
7 March 2016
Periodic Inspection · MTSA/ISPS Verification · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5828650
12 May 2014
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4856875
1 May 2014
ACP Annual Oversight · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4847746
19 July 2012
Administrative Inspection · Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4387904
7 June 2012
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4336866
09 - Working and Living Conditions › 092 - Working Conditions › Personal equipment
Issued 19 February 2026
Resolved
Except as otherwise provided in this section, on a documented vessel, each unlicensed seafarer (seaman) must be: a citizen of the US, an alien lawfully admitted to the US for permanent residence; or a foreign national who is enrolled in the USMMA.
Marine Inspector was notified of 06 non-US residents employed on vessel.
17- Vessel is may complete operations and return to Port Fourchon to offload unauthorized non-US citizen crew members. Vessel must comply with 46 USC 8103 prior to movement.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 19 March 2026
Resolved 20 February 2026
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 November 2025
Resolved
In close proximity to the helideck, the following fire-fighting appliances shall be provided and stored near the means of access. A suitable foam application system. A flange/ spool piece along helideck foam system piping had wastage and requires renewal prior to helicopter operations.
1974 SOLAS (Cons 2014) II-2 / 18.5.1
Action required: 705 - Other - as specified
Due 16 December 2025
Resolved 2 January 2026
Resolution: ABS found that the identified wasted section of the foam line pipe for the Helideck was replaced issued a finding 490.0 to be pressure tested to the satisfaction of the attending surveyor prior to the commencement of the helicopter operations.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 March 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Bulk mud compressor room is missing A-60 fire boundary insulation above the grey water valve.
74 Solas (2020 cons.) Ch. I, Reg. 11(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2025
Resolved 22 March 2025
Resolution: Third party tech report & ABS preliminary survey with (finding No. 485) attesting to rectification received and unloaded into deficiency documents tab.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 March 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Starboard side midship main deck cable entries for power to the ROV deck have multiple loose blocks and spray foam insulation.
74 Solas (2020 cons.) Ch. I, Reg. 11(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2025
Resolved 22 March 2025
Resolution: Third party tech report & ABS preliminary survey with (finding No. 485) attesting to rectification received and unloaded into deficiency documents tab.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 21 March 2025
Resolved
Each life raft or group of life rafts shall be stowed with a float free arrangement. All life rafts installed on board did not have the painter line attached to the weak link. Corrected on the spot.
74 Solas (2020 cons.) Ch. III, Reg. 13.4.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 March 2025
Resolved 21 March 2025
Resolution: The crew corrected the issue on the spot and correctly hooked the painter lines to the appropriate position on their weak links.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 September 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
The vessel reported failure to the main and piston bearings on the #4 auxiliary engine. The vessel may shift berths prior to repairs, and transit within COTP zone to verify repairs. Repair or replace the engine to the satisfaction of the attending Class Surveyor.
SOLAS 74 (2020 CONS.) I / Reg. 11.a
Action required: 17 - Rectify deficiencies prior to departure
Due 27 September 2024
Resolved 6 October 2024
Resolution: ABS surveyor attended the vessel and carried out a survey for the replacement of the aux engine. See narrative for more detail.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 July 2024
Resolved
If a vessel is altered plans and calculations must be submitted. Vessel has 02 workstation PAMS installed. Provide Class/ module review and approvals in accordance with CG-ENG Policy Letter No. 01-16.
46 CFR 127.120
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 August 2024
Resolved 23 July 2024
Resolution: Received satisfactory ABS documentation (see documents deficiency tab) and verified installation timeframe. COI Amended to reflect PAMs.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 4 April 2022
Resolved
All lifesaving appliances shall be fitted with retro-reflective material in accordance with the Organization.
Retro-reflective tape on lifebuoys and rescue boat is DOT approved and does not meet the specifications outlined in the regulations.
SOLAS 14 III/32.1
SOLAS 14 III/31.2
LSA Code 2010 II/1.2.7
Resolution A.658(16)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 May 2022
Resolved 8 April 2022
Resolution: The Retro-Reflective tapes of the approved type were used in replacing that on the Rescue Boat and all the Life Buoys onboard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 4 April 2022
Resolved
Suitable foam application system consisting of monitors capable of delivering foam to all parts of the helideck, delivering a discharge rate as required in table 18.1.
The port side supply line to the monitor has a pinhole leak causing water to leak out. The pipe flange on the right directly behind the AFFF tank is leaking.
SOLAS 14 II-2/18.5.3
Prior to helo operations.
Action required: 705 - Other - as specified
Resolved 8 April 2022
Resolution: The pinhole was ground and rewelded.
The leaking flange section was renewed with a newly fabricated piece.
The above were surveyed, tested, and found satisfactory at the time of attendance
Lifesaving › Inflatable Liferafts › Painter
Issued 7 March 2016
Resolved
Vessel painter line attached to bottom of hydrostatic release, not to weak link, on all life rafts aboard.
Action required: 705 - Other - as specified
Due 7 March 2016
Resolved 7 March 2016
Resolution: Vessel disconnected weak links to all life rafts and properly attached to weak links on hydrostatic releases. Conducted training with crew members on following manufacturers instructions.
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 July 2012
Resolved
Keel cooler leak experience a tube failure.
Action required: 705 - Other - as specified
Resolved 19 July 2012