Records from 2022 to 2023. Most recent: inspection, 12 June 2023.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
Professional
Detail on this page
3 inspections, each with its date, unit and type; 8 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 12 December 2022
Resolved
The company and the ship shall comply with the requirements of the ISM Code. The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations. In meeting these requirements the company should ensure that: Any non-conformity is reported, with its probable cause, if known. PSCO observed, during an expanded PSC exam, the following non-conformities: Failure of the vessel to properly report non-conformities pertaining to the fuel oil leaks, rescue boat, and incinerator on the required inspection procedures. Furthermore, no non-conformity report was submitted by the vessel concerning the lack of proper hatch cover locking bars. An SMS audit is required prior to release from detention.
SOLAS(20) IX/3.1, ISM Code 10.1
Action required: 30 - Ship detained
Resolved 23 December 2022
Resolution: Audit report completed, Deficiencies rectified by Class and CG.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 12 December 2022
Resolved
The main steering gear and rudder stock shall be capable of putting the rudder over from 35 degrees on either side to 30 degrees on the other side. PSCO observed the rudder's motion stop abruptly on two separate occasions without instruction from the crew while using steering gear pump #2.
74SOLAS(20)II-1/29.3.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 23 December 2022
Resolution: Tech report attested proper function of steering gear, repairs made.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 12 December 2022
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met; Means shall be provided to control leaks of flammable liquids. PSCO observed active fuel leaks on the Aux Engine 2 injector, Aux Engine 3 fuel oil feed line, Main Engine fuel filter, and Emergency Generator fuel tank.
74SOLAS(04)II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 December 2022
Resolution: O-rings replaced, no further signs of leaking.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other cargo/timber/deck/construction
Issued 12 December 2022
Resolved
The construction and means for securing weathertightness of cargo and other hatchways shall be at least equivalent to the requirements of regulation 16 (Hatchways closed by weathertight covers of steel). PSCO observed 05 hatch cover locking bars broken on cargo holds 2, 4, and 6, compromising weathertightness.
ILLC Reg. 14.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 December 2022
Resolution: Hatch cover cleats repaired.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 December 2022
Resolved
Fire doors in galley boundaries shall satisfy the following requirements; hold back hooks not subject to central control station release are prohibited. PSCO observed 02 hold backs on galley doors.
74SOLAS(04)II-2/9.4.1.1.4.4
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 12 December 2022
Resolution: Doors released and put in proper service as intended.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 12 December 2022
Resolved
Rescue boat shall be stowed in a state of continuous readiness. PSCO observed rescue boat failed to start in an appropriate time.
74SOLAS(20)III/14.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 23 December 2022
Resolution: Various adjustments made, rescue boat engine tested and found satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 2 December 2022
Resolved
The electrical power available shall be sufficient to supply all those services that are essential for safety in an emergency for a period of 18 hours. PSCO observed fuel oil level that would not sustain emergency services for 18 hours, due to a leak on a lower valve on the emergency generator fuel tank.
74SOLAS(20)II-1/43.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 23 December 2022
Resolution: Valve pin packing of quick closing valve renewed. Tank filled with no leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 December 2022
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met; Ignition sources shall be restricted. PSCO observed substantial degradation of refractory brick within incinerator compartment.
74SOLAS(04)II-2/4.1.4
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 December 2022
Resolution: Refractory Brick repaired and found in order.