CMA CGM MALTA is a 2004 freight ship. The Coast Guard has recorded 17 inspections since 2016, most recently in February 2024, along with 4 deficiencies and 4 operational controls.
Records from 2016 to 2024. Most recent: inspection, 23 February 2024.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it26836 - Convention (Subpart B), Gross Ton 12743 - Convention (Subpart B), Net Ton 45747 - Displacement, Ton 34289 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 December 2020Resolved
01, 07110, FIRE FIGHTER'S OUTFITS SHALL COMPLY WITH THE FIRE SAFETY SYSTEMS CODE. A FIREFIGHTER'S OUTFIT SHALL CONSIST OF A SET OF PERSONAL EQUIPMENT AND A BREATHING APPARATUS. ONE REQUIRED BREATHING APPARATUS FACE MASK IS BROKEN AND INCAPABLE OF BEING USED. 74 SOLAS (04) II-2/10.1 16C
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 December 2020
Resolved 28 December 2020
Resolution: Recieved new SCBA and provided tech report.
1230 - Load Lines - Guard rails on bulkheads shall be fitted around all exposed decks. Multiple exterior guard rail vertical members on port and starboard side of cargo deck are severely wasted, compromising strength and structural integrity of the guard rail.
ICLL 66/88 Reg 25.2
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 April 2017
Resolved 18 April 2017
Resolution: PSC Miami received photos and documentation that repairs were properly made.
Documentation › Logs/Records › Oil Record Book
Issued 4 March 2016Resolved
1710-Oil Record Book-When making entries in ORB Part I, the date, operational code, & item number shall be inserted in appropriate columns & required particulars shall be recorded chronologically in the blank spaces. C/E signed entries in ORB corresponding w/maximum OWS throughput. OWS throughput is 5 cubic m/h; on 06 March, ORB recorded 13 cubic mtr discharge over 125 mins. MARPOL Annex I/17.1
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 8 March 2016
Resolved 8 March 2016
Resolution: Recieved Class Society report from NKK Surveyor. Inequality of ORB entries and OWS throughput is attributed to accuracy of crew sounding and a changed physical arrangement of the bilge tank, now located 2 decks above the OWS.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 4 March 2016Resolved
0899-Accident Prevention/other-Each transfer pipe system used for transfer of oil or liquid hazardous material to or from a vessel w/capacity of 250 bbls or more must not leak under static liquid pressure of >1.5x MAWP annually. C/E stated last hydrostatic test of vessel's bunker lines was conducted using air as testing medium. 33CFR156.170
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 8 March 2016
Resolved 17 March 2016
Resolution: PSC NOLA received a class report from ABS satisfying the requirement.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.