MAURY USCG vessel records
← All vessels

GLADIATORSHIP

GLADIATORSHIP is a 2010 freight ship. The Coast Guard has recorded 6 inspections since 2016, most recently in February 2019, along with 3 deficiencies and 1 operational control.

Records from 2016 to 2019. Most recent: inspection, 7 February 2019.

Built
2010
Last inspected
7 February 2019
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 February 2019
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 3 calendar years (2016–2019)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9431513
1099598
Flag
BAHAMAS, THE
Maury page id
psix-1099598

Documentation record

Tonnage as PSIX records it33044 - Convention (Subpart B), Gross Ton
19231 - Convention (Subpart B), Net Ton
67681 - Displacement, Ton
56819 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 6

7 February 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6623572
1 February 2019 PII Safety Exam · Ballast Water Examination · Deficiency Check · ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6613394
15 February 2018 Administrative Inspection · Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6349789
28 April 2016 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5855756
24 April 2016 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5861255
18 April 2016 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5856234

Deficiency record · 3

07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 1 February 2019 Resolved
07101-Fire prevention structural integrity- Where "A" class are penetrated, such penetratuions shall be tested in accordance with the Fire Test Procedures Code, subject to the previsions o paragraph 4.1.1.5. Such penetration shall be suitably insulated be extension of the insulation at the same level of the division. PSCO observed four class A bulkheads with penetrations not approved by administration. These are located on A deck, B deck, C deck and Upper deck. All penetrations made for inserting cables. This renders fire structural integrity null and void.74 SOLAS (2014) CH II-2/REG 9.3.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 February 2019
Resolution: PSC NOLA received a class report from Lloyd's Register satisfying the requirement.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 15 February 2018 Resolved
1400-Propulsion&Aux Machinery. After any survey of the ship under regulation 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the administration. Start air receiver #2 holding tank has temporary repairs on fill and discharge lines. 74SOLAS(14)I/11(b) - 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 February 2019
Resolution: Class report observed attesting to the approval of the repairs made by the crew.
Construction/Loadline › Markings › Load Line Assigning Authority Mark
Issued 15 February 2018 Resolved
1200-Load Lines. The ring, lines, and letters shall be permanently marked on the sides of the ship. Letters for class society on plimsol mark are not permanently marked. ICLL 8 - 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 February 2018
Resolution: Class report received attesting to properly marked class society letters.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.