Records from 2016 to 2024. Most recent: inspection, 12 July 2024.
Inspection history · 14
12 July 2024
In-Service Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7957129
30 March 2024
COC-CHEM & TVE Annual
Type not classified · Sector North Carolina · USCG East District (CGD-E) · Activity 7881932
9 January 2023
COC-CHEM Renew · PSC B · ISPS Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7615069
5 August 2022
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7525515
13 January 2022
COC-CHEM & TVE Annual · PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7375963
17 November 2021
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7352943
16 November 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7352419
2 January 2021
COC-CHEM & TVE Renew
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7118074
9 May 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6680542
27 March 2019
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6650642
26 March 2019
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6643843
17 March 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6643846
1 April 2016
COE-Dockside
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5844988
1 March 2016
ISPS II Exam · COC-CHEM & TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5824638
14 - Pollution Prevention › 141 - MARPOL Annex I › Suspected of discharge violation
Issued 13 July 2024
Resolved
Vessel may not handle, store, or transport oil on the navigable waters of the United States, unless operating in compliance with an approved Vessel Response Plan. Master stated to PSCO that the vessel poured dispersants overboard, which contradicts procedures approved in the approved Vessel Response Plan. 33 CFR 155.1025(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 July 2024
Resolved 18 July 2024
Resolution: Class report recieved on 17JUL2024.
14 - Pollution Prevention › 141 - MARPOL Annex I › Suspected of discharge violation
Issued 13 July 2024
Resolved
No person shall conduct an oil or hazardous material transfer operation unless transfer hoses and loading arms are long enough to allow the vessel to move to the limits of its moorings without placing strain on the hose, loading arm, or transfer piping system. Master stated to PSCO that the bunker piping sheared due to force applied as receiving and delivering vessels separated due to sea conditions, resulting in bunkering product accumulating on deck. 33 CFR 156.120(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 July 2024
Resolved 18 July 2024
Resolution: Class report recieved on 17JUL2024
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 2 January 2021
Resolved
The angular position of the rudder shall be indicated on the navigation bridge. Rudder angle indicators could not display rudder angle past 20 degrees starboard.
SOLAS (2004) CH II-1 Reg 29.11.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2021
Resolution: Class issued short term safe equipment cert to expire 31JAN2021 due to part availbility.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 2 January 2021
Resolved
Vessel must have an installed CG approved BWMS or AMS to discharge ballast water into the waters of the United States. Vessel's BW extension expired on 01JUN19 and a system was not installed. Vessel cannot discharge ballast water into water's of the US unless they employ a method as per 33CFR151.2025(a)(2),(4) and (5).
33CFR151.2035
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 17 November 2021
Resolution: Vessel will need to drydock to make necessary isntallment of equipment, they are still required to hold ballast while in US waters unless employing method per 33CFR151.2025(a)(2), (4) and (5). Should expand examination of BWM.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 March 2019
Resolved
13101-Connections within the fuel supply and spill lines shall be constructed having regard to their ability to prevent pressurized oil fuel leaks while in service and after maintenance. PSCO noted multiple leaks on main engine high pressure fuel lines. SOLAS 74(04 CONS.) II-2/4.2.2.5.4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2019
Resolution: The ship's crew renewed all O-Rings on high pressure fuel lines. After completion of repairs, the main engine was operationally tested with no apparent leaks detected.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 26 March 2019
Resolved
06107- Where inerting or padding of cargo tanks is required by the International Bulk Chemical (IBC) Code the vessel shall have an adequate supply of inert gas for use. The crew was unable to operate and test the alarms/indicators required for the installed nitrogen generator system in accorance with the FSS Code. SOLAS 74(14)VII/10 IBC CODE 9.1.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2019
Resolution: Multiple alarms were tested for the N2 Generator which were found to operating as per manufacturer's specifications.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 March 2019
Resolved
06199- The transfer procedures must contain either in order listed or by use of a cross-reference index page in accordance with 33 CFR 155.750. Crew was unable to provide transfer procedures meeting the requirements of 33 CFR 155.750.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 November 2021
Resolution: Received and reviewed updated transfer procedures all satisfactory.
Deck/Cargo › Vapor Control Systems › Vapor Recovery Unit
Issued 1 March 2016
Resolved
1835 - VCS - VAPOR CONNECTION FLANGE MUST HAVE A PERMANENT STUD PROJECTING OUTWARD THAT HAS A 12.7 mm DIATEMTER AND IS AT LEAST 25.4 mm LONG. VAPOR CONNECTION FLANGE STUD IS NOT PERMANENTLY AFFIXED. VESSEL MUST PROVIDE EVIDENCE OF PROPER REPAIR PRIOR TO LOADING CARGOES REQUIRING VAPOR CONTROL IN THE UNITED STATES.
-46 CFR 39.2001 (j)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 March 2016
Resolved 4 March 2016
Resolution: Received and verified proof of permanant installation of stud.