Records from 2014 to 2018. Most recent: inspection, 23 March 2018.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 23 March 2018
Resolved
0100- Ship’s Certificates and documents- A Cargo Ship Safety Equipment and a Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years. PSCO observed both Cargo Ship Safety Equipment and a Cargo Ship Safety Radio Certificates onboard the vessel were expired. SOLAS 74(a) 2009 Cons.I /14(a) 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2018
Resolved 26 March 2018
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. Safety Equipment and Radio Annual and Periodical Surveys were completed. Cargo Ship Safety Equipment and Radio Certificates were endorsed for re-validation.
Fire Fighting › Remote Fuel Shutoff › General
Issued 23 March 2018
Resolved
0750- Fire Prevention- Oil fuel pipes which, if damaged, would allow oil to escape from a storage, settling, or daily service tank having a capacity of 500 liters and above shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space concerned in the event of a fire. PSCO discovered quick closing valve on NO.2 cylinder oil storage tank secured with clamps to prevent it from leaking. SOLAS 74(a) 2009 Cons. II-2/ 4 2.2.3.4 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2018
Resolved 26 March 2018
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. Clamps were removed, valve was overhauled and lapped. No leakage observed.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 23 March 2018
Resolved
0715- Detection- Fire protection systems and firefighting systems and appliances shall be maintained ready for use. PSCO observed flame detector above #2 M/D generator melted. Provide documentation attesting to the replacement of the flame detector above #2 M/D generator. SOLAS 74(a) 2009 Cons. II-2 14.1 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2018
Resolved 26 March 2018
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. Detector was replaced with a new unit.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 23 March 2018
Resolved
0650- Lifebouys- Not less than one half of the total number of life buoys shall be provided with life buoys self-igniting lights complying with the requirements of paragraphs 2.1.2 of the code. PSCO observed 02 required self-igniting lights on life buoys not operational. SOLAS 74(a) 2009 Cons. III / 7.1.3 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2018
Resolved 26 March 2018
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. The batteries were replaced, electrical terminal cleaned; lights confirmed operable.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 23 March 2018
Resolved
9800- Other (Clearly Hazardous) - During preparation and launching , the survival craft, its launching appliance, and the area of water into which it is to be launched shall be adequately illuminated by lighting supplied from the emergency source required by regulation II-1/42 or II-1/ 43 as appropriate. PSCO observed emergency lights for the survival craft launching appliance area not operational. SOLAS 74(a) 2009 Cons. III / 16.7 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2018
Resolved 26 March 2018
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. Broken electrical bulbs were replaced; all emergency lights confirmed operable.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 23 March 2018
No resolution recorded
0720- Fire Fighting Equipment - Fire protection systems and fire-fighting systems and appliances shall be properly tested and inspected. Psco observed that the crew was using a flame tourch to test flame detectors unstead of the halogen lamp approved by their company. SOLAS 74(a) 2009 Cons. III / 14.1.2 17a
Action required: 705 - Other - as specified
Due 15 April 2018 — due date passed with no resolution recorded
Lifesaving › Inflatable Liferafts › Float Free
Issued 23 March 2018
Resolved
0620- Inflatable Liferafts - Each liferaft or group of liferafts shall be stowed with a float-free arrangement complying with the requirements of paragrapgh 4.1.6 of the Code so that each floats free, and if inflatable, inflates automatically. when the ship sinks. PSCO observed starboard side liferaft shackled to the crattle inhibiting float-free arrangement. SOLAS 74(a) 2009 Cons.III / 13.1.4.2 10(c)
Action required: 705 - Other - as specified
Due 23 March 2018
Resolved 23 March 2018
Resolution: Corrected on the spot.
Operations/Management › Drills/Instruction › Fire
Issued 12 March 2014
Resolved
0999- Other (Safety in general)-The following functional requirements shall be met: fire protection systems and fire-fighting systems and appliances shall maintained ready for use. PSCO observed a wooden block in the quick closing fuel oil supply valve. C/E stated the block was left in during testing dated 08MAR14 on records. Provide corrective action plan w conc. from Admin.-SOLAS(09) II-2/14.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 March 2014
Resolved 2 April 2014
Resolution: Received proper documentation satisfying requirement.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 12 March 2014
Resolved
0715-Detection-The following functional req. shall be met: fire protection systems and fire-fighting systems and appliances shall be properly tested and inspected. Flame detector above #1 generator is melted. SMS requires testing with pan and test flame. Provide corrective action plan to safe/effective means to test detectors w/o melting sensors & the detector is operational. SOLAS(09) II-2/14.1.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 March 2014
Resolved 2 April 2014
Resolution: Received proper documentation satisfying requirement.