MAURY USCG vessel records
← All vessels

SALSA

SALSA is a 2009 tank ship. The Coast Guard has recorded 11 inspections since 2016, most recently in January 2025, along with 21 deficiencies and 4 operational controls.

Records from 2016 to 2025. Most recent: inspection, 11 January 2025.

Built
2009
Last inspected
11 January 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 11 January 2025
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9555307
V7A4541
1101063
Flag
MARSHALL ISLANDS
Maury page id
psix-1101063

Documentation record

Tonnage as PSIX records it28798 - Convention (Subpart B), Gross Ton
12582 - Convention (Subpart B), Net Ton
55004 - Displacement, Metric Ton
47991 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 11

11 January 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8061121
27 December 2024 COC-TVE Renew · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8051002
30 October 2023 Appeal
Administrative · Commandant (CG-CVC) · Activity 7816296
12 August 2023 COC-TVE Renew · Deficiency Check · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7766214
28 April 2021 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7181276
22 April 2021 PSC A · COC-TVE Renew
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7180814
29 September 2020 Deficiency Check · COC-TVE Renew
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7065161
16 May 2019 COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6684057
28 March 2017 COE-Offshore
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6113026
24 March 2017 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6111158
8 November 2016 Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6043284

Deficiency record · 21

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 December 2024 Resolved
Machinery subject to internal pressure including pressure vessels, means shall be provied where practicable to protect against excessive pressure. During engine room exam, Coast Guard examiner could not identify safety relief valves on both air recievers. Provide documentation or current arrangement or proper installation of required safety relief valves. 74 SOLAS (04) II-1/27.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 January 2025
Resolved 4 January 2025
Resolution: Deficiency Cleared via Class Report
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 12 August 2023 Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code... The safety management system should provide for specific measures aimed at promoting the reliability of such equipment or technical systems that are not in continuous use. Inspection reports indicated satisfactory condition and no non-conformity reports, while material condition identified multiple issues. Multiple fire extinguishers were found not inspected for months/not in serviceable condition. Secondary means of communication (phone) in steering gear was found not operating properly, no report made. Fixed foam applicator inoperable due to severe corrosion deterioration, raw water cooling pump(s) leaking excessively, multiple smoke detectors being held together by tape, no report made, and an engine room safety rail was discovered creating a severe falling hazard from the upper engine room. In addition, the crew incorporated an OWS non-approved operating procedure that involved flushing sea water with oily waste to avoid the oil content meter reading above 15 ppm so that the effluent could be pumped directly overboard. Crew informed PSCO this was the only way to get system to operate. An ISM external audit is required prior to departing the port of New York/ New Jersey. 74 SOLAS (09 Consol.) Ch IX Reg 1.3.1 / ISM Code 12.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 14 August 2023
Resolved 14 August 2023
Resolution: ISM AUDIT COMPLETE, SEE ISM AUDIT REPORT IN DOCUMENTS
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 12 August 2023 Resolved
The purpose of this regulation is to suppress and swiftly extinguished a fire in the space of origin. Fire Extinguishing appliances shall be readily available. Port State Control Officers identified a fixed foam applicator on the fire control plan located in the overhead of the aux. machinery space behind the main electrical panel in way of the engine control room with severe wastage due to corrosion/no record of maintenance. In this space, the A 60 boundary was compromised, and smoke detectors were functioning, but being held together by tape and not reported. 1974 SOLAS 2009 II-2/ 10.1.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 12 August 2023 Resolved
Hydraulic power-operated steering gear shall be provided with the following: arrangements to maintain the cleanliness of the hydraulic fluid taking into consideration the type and design of the hydraulic system. The PSCO’s observed multiple hydraulic fluid leaks in the steering gear room. The leaks came from the fill system and the high pressure hydraulic lines and left hydraulic fluid to flow down the steering equipment. 74 SOLAS (09 Consol.) CH II-1 Reg. 29.12.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 12 August 2023 Resolved
Fire extinguishers shall be situated ready for use… The PSCO’s observed many portable fire extinguishers not been examined for months thus making them not ready for use. Multiple fire hoses were not in operating condition due to soiling & rot. 74 SOLAS (09 Consol.)CH II-2 Reg. 10.3.2.4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 August 2023 Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. Various cable runs throughout machinery spaces were missing hardware to properly secure overhead wire runs. 74 SOLAS (09 Consol.) CH II-1/Reg 45. 5.5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 August 2023 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose for which the equipment is intended, the working conditions to which it will be subjected and the environmental conditions on board. All (03) Raw water cooling pumps in the engine room were leaking excessively. Further, #3 generator has excessive fuel oil leaks on the #5 cylinder fuel oil pump. 74 SOLAS (09 Consol.)Ch.II-1 Reg. 26.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 12 August 2023 Resolved
Satisfactory means... shall be provided for the protection of the crew in getting to and from their quarters, the machinery space and all other parts used in the necessary work of the ship." Vessels engine room upper-rail was bent causing a falling hazard. LLC Reg. 25.4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 August 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without without danger to the ship or persons on board.” The PSCO’s examined many different light fixtures that had damaged/broken glow switch starters. PSCO’s examined over 20 different light fixtures in the main machinery space with this condition. The PSCO’s examined multiple smoke detectors that were cracked or temporarily repaired with clear tape. 74 SOLAS (09 Consol) CH. I Reg. 11
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 August 2023 Resolved
Protection of cargo pump rooms in tankers. 02 vertical stairwell lighting fixtures in the cargo pump room were not gas tight. Horizontal fixture in the lower cargo pump room in way of emergency communications booth had a temporary seal on both ends. Gas tight condition could not be verified. 74 SOLAS (09 Cons)Ch.II-2 Reg. 4-5.10.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 August 2023 Resolved
The following requirements shall govern application of the tables: Tables 9.7 and 9.8 shall apply respectively to the bulkhead and decks separating adjacent spaces." In accordance with table 9.8, control stations adjacent with machinery spaces of category A require A-60 boundaries. The ECR adjacent with the auxiliary space did not have a proper A-60 boundary.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2023
Resolved 14 August 2023
Resolution: See class report
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 September 2020 Resolved
The venting arrangments shall be so designed and operated as to ensure that neither the pressure nor vacuum in cargo tanks shall exceed design parameters. Vessel found with cargo vapors to be venting out vacuum side of pressure/vacuum valve on cargo tanks #3 port, #2,5,7,8 stbd, while tanks are under positive pressure. Vessel is required to repair valves to satisfaction of class and USCG prior to departure and prior to issuance of COC. 74 SOLAS (14) II-2/11.6.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 October 2020
Resolved 1 October 2020
Resolution: Repairs witnessed by class & USCG, vacuum side of P/V's are gastight.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 September 2020 Resolved
Condition of ship and its equipment shall be maintained to conform to the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to ship/persons on board. The grease fittings on gastight seals on cargo oil pump #1,2,4 and ballast pump found missing or broken. 74 SOLAS (14) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2020
Resolved 30 September 2020
Resolution: Vessel replaced fittings and proved operation to USCG upon reattendance.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 September 2020 Resolved
Cables shall enter an explosion protected enclosure only by means of a gland or equivilent device capable of maintaining the integrity of the integrity of the enclosure. P/S bilge high level alarms in the cargo pumproom found with wires to be pulled out of enclosure. 74 SOLAS (14) II-1/45.11, IEC 7.5.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 29 October 2020
Resolved 29 September 2020
Resolution: P/S bilge alarm wires stuffed with gland packing, witnessed repairs by USCG.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 16 May 2019 Resolved
The inert gas system referred to in paragraph 5.5.3.1 shall be designed, constructed and tested in accordance with FSS code. Deck seal low water level alarm (simulation mode) is not working as designed ( no indication that alarm is working). Crew drained the deck seal water in attempt to simulate low level alarm but could not refill deck seal with water via designed fill line. PSCO also observed multiple cracks in the deck seal sight glass. 74 SOLAS (09) II-2/reg. 4/5.5.3 FSS Code CH 15 Code: 60 a & c
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 May 2019
Resolution: Defs cleared by class. See attached class report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 May 2019 Resolved
The machinery, boilers, and other pressure vessels associated piping systems and fittings shall be of a design and construction adequate for the service for which they intended and shall be installed and protected as to reduce to a minimum any danger to persons on board. The PSCO observed leaking packing glands on the general service fire pump and #3 salt water cooling pump. The salt water discharge on the main engine oil cooler was observed to have a pin hole leak and water was observed leaking from the salt water drain pipe. 74 SOLAS (14) II-1/26.1 Code: 17 a & c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2019
Resolution: Defs cleared by class. See attached class report.
Fire Fighting › Fixed Fire Detection System › Detector/Call Point Grouping
Issued 8 November 2016 Resolved
The vessel shall have an installed fixed fire detection system that is in serviceable condition. 05 dectors were identified as damaged, cracked, or missing the protective covers SOLAS 74 (14consol) II-2 / 7.2.3
Action required: 705 - Other - as specified
Due 18 December 2016
Resolved 8 December 2016
Resolution: Five new detectors were installed and tested, test satisfactory.
Fire Fighting › Combustible Materials › Insulation
Issued 8 November 2016 Resolved
The vessel shall limit the fire growth potential in every space on the ship. Oil soaked lagging on transfer pumps, fuel oil transfer systems was excessive. Lagging shall be renewed as appropriate. SOLAS 74 (14 consol) II-1 / 5
Action required: 705 - Other - as specified
Due 18 December 2016
Resolved 8 December 2016
Resolution: New lagging was installed in specified locations.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 8 November 2016 Resolved
The machiner, boilers, other pressure vessels and associated piping systems and fittings shall be of design and construction adequate for the service for which intended and shall be so installed and protected as to reduce to a minimumto any person on board. The boiler has 2 significant steam leaks at the flange connection. SOLAS 74 (14 consol) II-1 / 26.1
Action required: 705 - Other - as specified
Due 18 December 2016
Resolved 8 December 2016
Resolution: New gaskets have been installed on the boiler.
Engineering › Steam System (auxiliary) › Valve
Issued 8 November 2016 Resolved
Electrical apparatus shall be so constructed and so installed as not to cause injury. Plastic bag was placed over the engine room alarm to shield the fixture from a leaking steam line. SOLAS 74 (14 consol) II-1 / 45.1.3
Action required: 705 - Other - as specified
Due 18 December 2016
Resolved 8 December 2016
Resolution: The plastic bag was removed from the alarm fixture and the leaks were rectified on the boiler.
Engineering › Sea-water System (primary cooling) › Pump
Issued 8 November 2016 Resolved
Piping systems and fittings shall be of design and constrcution adequate for service. Seawater pumps and associated piping/flanges leaking excessively. SOLAS 74 (14 consol) II-1 / 26.1
Action required: 705 - Other - as specified
Due 18 December 2016
Resolved 8 December 2016
Resolution: AN overhaul of the sea water cooling pump was completed and leaks were minimized on the system.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.