Records from 2011 to 2026. Most recent: inspection, 19 February 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2011
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNASHVILLE, TN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 27 August 2026 · expires 30 September 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
19 February 2026
Examination of Repairs · Cargo Tank Internal · Drydock Exam · MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8309993
13 December 2024
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8046108
26 January 2024
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7853550
24 January 2023
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7626297
30 March 2022
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7421549
12 May 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7199404
1 February 2021
Internal Structural Exam · MTSA Verification · COI Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7130885
13 December 2019
Annual Inspection · Deficiency Check · Administrative Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6873536
10 August 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6779343
26 April 2019
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6670969
15 March 2018
Deficiency Check · MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6369021
7 March 2018
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6367815
7 March 2018
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6385338
12 December 2016
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6056327
20 January 2016
MTSA Verification · Internal Structural Exam · COI Inspection · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5799411
25 February 2015
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5077749
17 February 2015
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5068934
3 March 2014
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4809008
18 July 2013
Examination of Repairs · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4657341
26 June 2013
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4633508
26 June 2013
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4801981
24 January 2011
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3931926
3 January 2011
Initial Construction-Excluding Oversight · MTSA Verification · Initial Certification · Hull Examination · Cargo Tank Internal · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3919714
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 December 2019
Resolved
Vessel required to have a means to shutdown transfer of cargo to another vessel or facility. Shutdown failed to work (due to ice). Prove proper operation of shutdown prior to using cargo pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 December 2019
Resolution: Company was able to prove proper operation of emergency shutdwown.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 7 March 2018
Resolved
Vessel did not have a valid COFR for current owner/operator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 April 2018
Resolved 15 March 2018
Resolution: Vessel obtained valid COFR.
Construction/Loadline › Hull › Side Shell
Issued 26 June 2013
Resolved
Make permanent repairs to damaged area side shell port side #4 wing tank near the waterline.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 July 2013
Resolved 18 July 2013
Resolution: Repair witnessed to satisfaction of attending Marine Inspector.
Construction/Loadline › Hull › Transverse Frame
Issued 3 January 2011
Resolved
Damage caused by launch, see attached launch damage and repair proposal attached to this activity.
Action required: 705 - Other - as specified
Due 12 January 2011
Resolved 28 January 2011
Resolution: Repairs conducted in ship yard and witnessed by USCG inspectors.