← All vessels
GAZ PROVIDENCE
GAZ PROVIDENCE is a 2010 tank ship. The Coast Guard has recorded 7 inspections since 2012, most recently in June 2022, along with 4 deficiencies and 1 operational control.
Records from 2012 to 2022. Most recent: inspection, 27 June 2022.
- Built
- 2010
- Last inspected
- 27 June 2022
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 4 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9448504 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3FBR5
1101464
Flag
PANAMA
—
Maury page id
psix-1101464
Inspections, by type
The 7 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it16777 - Convention (Subpart B), Gross Ton
5033 - Convention (Subpart B), Net Ton
17022 - Dead Weight, Ton
25098 - Displacement, Ton
5033 - Convention (Subpart B), Net Ton
17022 - Dead Weight, Ton
25098 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 7
27 June 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7488725
10 May 2022
PSC B · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7447353
8 January 2021
COC-GAS Annual · Deficiency Check · PSC B · COE-Administrative
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7121694
19 October 2019
Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6834849
16 July 2015
COC-GAS Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5176673
15 July 2015
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5185082
5 July 2012
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4361253
Deficiency record · 4
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 May 2022
Resolved
AN AUDIBLE AND VISUAL ALARM SYSTEM TO GIVE A WARNING ON BOTH SIDES OF THE AIRLOCK SHOULD BE PROVIDED TO INDICATE IF MORE THAN ONE DOOR IS MOVED FROM THE CLOSED POSITION. PSCO DID NOT OBSERVE VISUAL INDICATOR INSIDE MOTOR ROOM. 74SOLAS(20)VII/13 IGC(93)3.6.3
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 May 2022
Resolved
THE CLOSURE TIME OF 30s FOR THE EMERGENCY SHUTDOWN VALVE REFERRED TO IN 5.6.4. SHOULD BE MEASURED FROM THE TIME OF MANUAL OR AUTOMATIC INITIATION TO FINAL CLOSURE...THE VALVE CLOSURE TIME SHOULD BE SUCH AS TO AVOID SURGE PRESSURE IN PIPELINES. SUCH VALVES SHOULD CLOSE IN SUCH A MANNER AS TO CUT OFF THE FLOWS SMOOTHLY. DURING FIRST TEST OF THE EMERGENCY SHUTDOWNS PSCO OBSERVED PORT AND STBD SIDES TAKE APPROXIMATELY 41 AND 37 SECONDS RESPECTIVELY FOR VALVES TO FULLY CLOSE. CREW WAS ABLE TO ADJUST HYDRAULIC VALVES TO NOW TAKE 30 SECONDS EACH PRIOR TO THE COMPLETION OF THE EXAM. 74SOLAS(20)VII/13 IGC(93)5.6.4
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 January 2021
Resolved
One or more remotely controlled emergency shutdown valves should be provided on the ship for shuting down liquid and vapor cargo transfer between ship and shore... Valves should comply with requirements of 5.6.4. While testing starboard side ESD shutdown, PSCO's discovered that the #2 vapor line did not close entirely and seemed to get stuck halfway. - IGC Code (1993) 5.6.1.1 - 40ac
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 January 2021
Resolved
Gas detection equipment should be so designed that it may readily be tested. Testing and calibration should be carried out at regular intervals. Suitable equipment and span gas for this purpose should be carried on board. Vessel crew was using a balloon to fill with propane test gas to test detector in cargo compressor room. Fixed gas detection system manual lists a sample bottle to be used. Currenttest bottle is bolted in cabinet in CCR and cannot be accessed easily to conduct tests except for cabinet panel. IGC Code 13.6.6 - 40ac
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.