Records from 2010 to 2022. Most recent: operational control imposed, 24 September 2022.
Inspection history · 14
24 September 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7565320
23 August 2022
PSC B · Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7534538
12 August 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7030972
11 July 2019
Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6747076
7 July 2019
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6741190
15 April 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6659906
12 April 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6661212
12 April 2019
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6661355
16 April 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5850031
9 April 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5850443
14 February 2012
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 4241431
8 January 2012
PII Safety Exam · Ballast Water Examination · Administrative Inspection · ISPS II Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4218235
3 January 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4217789
14 November 2010
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3887229
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 August 2022
Resolved
11129 - Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use. PSCO observed the rescue boat engine would stop when the choke was disengaged.
SOLAS 74(20)III/20.2
17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2022
Resolution: Upon review of the Class survey, M/V Lilly Bolten vessel has been cleared of the deficiency.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 23 August 2022
Resolved
07114 - Shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space concerned In the event of a fire occurring in the space in which such tanks are situated. PSCO observed MEFO quick-closing valve was inoperable. Vessels crew closed the group one valve in the fire control locker. MEFO valve is malfunctioning.
SOLAS 74(20)II-2/4.2.2.3.4
17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2022
Resolution: Upon review of the Class survey, M/V Lilly Bolten vessel has been cleared of the deficiency.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 23 August 2022
No resolution recorded
02134 - To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this section. Subject vessel, of keel laid date 02OCT09 and ballast water capacity of 11280.60 m3, is past its compliance date per the implementation schedule in 33 CFR151.2035(b). Vessels current ballast water management method is exchange and discharge, which is not authorized. vessel has no BWTS installed.
33CFR151.2035
15c
Action required: 15 - Rectify deficiencies by next port
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 11 July 2019
Resolved
All ships over 300 GT must have a primary 9 GHz (x-band) radar. X-band radar was reported inoperable. X-band must be repaired before the ship leaves the port.
SOLAS 74 (14 cons) V/19.2.3.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 July 2019
Resolution: Radar tech attended vessel with replacement part. Radar repaired and fully operational.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 16 April 2019
Resolved
SOLAS 74 (2014 CONS.) III/20.2
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Discovered satellite EPIRB was unable to prove satisfactory operation due to faulty test function.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 April 2019
Resolution: Received photo and proof of registration and new EPIRB was placed onboard in service.
Engineering › Steering Gear System › Power Unit
Issued 14 November 2010
Resolved
0936 - Steering Gear System - Number two steering control system is not operating as designed.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2010
Resolved 18 November 2010
Resolution: Received, reviewed and accepted proper documentation from Sperry Marine technician D.F. Oman stating the deficiency was rectified. Linkage bar was found not square, and was readjusted and tightened. Operation now satisfactory.