Records from 2016 to 2024. Most recent: inspection, 21 December 2024.
Inspection history · 12
21 December 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8050012
17 October 2024
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8020250
27 June 2023
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7724537
13 May 2021
COC-CHEM Annual · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7195911
2 March 2020
PSC B · COC-CHEM & TVE Renew · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6918681
25 October 2019
ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6841838
7 May 2019
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6673367
21 April 2019
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Annual
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6662576
23 December 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6602135
2 March 2018
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6361574
28 February 2017
ISPS II Exam · COC-CHEM & TVE Annual · Administrative Inspection · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6093542
3 March 2016
COC-CHEM Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5822257
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 21 April 2019
Resolved
THE MAIN INLETS AND OUTLETS OF ALL VENTILATION SYSTEMS SHALL BE CAPABLE OF BEING CLOSED FROM OUTSIDE THE SPACES BEING VENTILATED. PSCO NOTED VENT CLOSING DEVICE ON SAMPLE LOCKER IS WASTED AND INOPERABLE. SOLAS 09 II-2/5.2.1.1
Action required: 10 - Deficiency Rectified
Due 7 May 2019
Resolved 7 May 2019
Resolution: Inoperable vent for the SOPEP locker repaired and in good working order. DNV-GL issued a survey statement attesting to the repairs.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 3 March 2016
Resolved
74SOLAS(09 Cons.)II-2/4.5.5.1.1 17ac. Unable to verify proper operation of the inert gas generator. For tankers of 20,000 tonnes deadweight and upwards, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirement of the FSS Code. Unable to verify proper operation of the inert gas generator.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 March 2016
Resolved 4 March 2016
Resolution: Agent provided a class report, clearing deficiency. See documents
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 March 2016
Resolved
74SOLAS(09 Cons.)I/11(a)40ac. Piping arrangements on Oily Water Separator has a soft patch repair not approved by class. The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 3 March 2016
Resolved 4 March 2016
Resolution: Agent provided a class report clearing the deficiency. See documents