← All vessels
NAVIOS CELESTIAL
NAVIOS CELESTIAL is a 2009 freight ship. The Coast Guard has recorded 11 inspections since 2014, most recently in April 2025, along with 4 deficiencies and 2 operational controls.
Records from 2014 to 2025. Most recent: inspection, 22 April 2025.
- Built
- 2009
- Last inspected
- 22 April 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 4 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9496226 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3EYU5
1105100
Flag
PANAMA
—
Maury page id
psix-1105100
Inspections, by type
…with no type recorded1
Years with a record
9 calendar years (2014–2025)
The 11 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it32343 - Convention (Subpart B), Gross Ton
19458 - Convention (Subpart B), Net Ton
58063 - Dead Weight, Metric Ton
67802 - Displacement, Metric Ton
19458 - Convention (Subpart B), Net Ton
58063 - Dead Weight, Metric Ton
67802 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 11
22 April 2025
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8115984
8 April 2025
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8108414
24 April 2024
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7900579
23 May 2023
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7689450
21 May 2023
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7693027
18 May 2022
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7453855
7 August 2021
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7279540
15 December 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6864272
27 November 2018
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6582030
23 April 2017
Ballast Water Examination · COE-Dockside · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6120262
21 August 2014
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4948136
Deficiency record · 4
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 April 2024
Resolved
The purpose of the regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met; the ignitability of combustible materials shall be restricted. PSCO observed worn, wasted, and oil soaked insulation on top of waste oil settling tank 1/2.
74 SOLAS (04) II-2/4.1.3 - 40ac
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 23 May 2023
Resolved
The Safety Management System (SMS) should ensure compliance with mandatory rules and regulations; and that applicable codes, guidelines and standards recommended by the Organization, Administrations, classification societies and maritime industry organizations are taken into account. The combination of deficiencies below indicates a serious failure, or lack of effectiveness, of the implementation of the ISM Code. A safety management audit shall be carried out by the Administration or the RO before the ship may be released from detention.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 23 May 2023
Resolved
Machinery shall be adequate for intended purpose. The #1 and #2 main saltwater cooling lines were found to be temporarily repaired with cement box patches. The #2 main saltwater cooling line was observed to be leaking. A more detail inspection was conducted including interviews of the engineering staff and a review of the relevant sections of the SMS. According to the SMS (Section 10.1), the master is to inform the company of any non-conformity, defect, malfunction, or breakdown of the hull, machinery and equipment, as well as any maintenance or repair work. The Master was able to produce one email to the Company regarding the repair on the #2 cooling line, however there was no objective evidence that the defect on the #1 cooling line was ever reported to the Company. In addition, there is no objective evidence that the Company took appropriate corrective action or that they informed the Administration or Recognized Organization as required by the ISM Code, Section 10 and the Company's SMS, respectively. Interviews with the C/E indicated that the temporary repairs have been installed since February, 2023.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Documentation-ISM
Issued 23 May 2023
Resolved
The Company should identify equipment and technical systems the sudden operational failure of may result in a hazardous situation and the SMS should have procedures to promote the reliability and testing of such systems and equipment. During a test of manual call points, the crew did not have the correct key to test the call points and had to disassemble with a screwdriver. In addition, the company did not maintain records of these tests.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.