Records from 2012 to 2025. Most recent: inspection, 8 November 2025.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 8 November 2025
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. Vessel reported taking on water in aft void during transit. Proceed to berth at Morris Iron
& Steel and remain there until the structural and watertight integrity of the affected area is inspected and verified to the satisfaction of the Coast Guard.
46 CFR 91.30-1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 November 2025
Resolution: Verified hull and structural integrity of affected void and satisfactory condition of watertight hatches.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 July 2025
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150 as follows:
Vessel found to be carrying 24 inch diameter lifebuoys rather than the 30 inch required.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 11 July 2025
Resolution: New rings provided as the insection was completing.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 August 2021
Resolved
The freeboard deck is normally the uppermost complete deck exposed to weather and sea, which has permanent means of closing all openings in the weather part thereof, and below which all openings in the sides of the vessel are fitted with permanent means of watertight closing.
Hatch 5C is missing o-ring
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 August 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 August 2021
Resolved
Manholes and flush scuttles in position 1 or 2 or within superstructures other than enclosed superstructures shall be closed by substantial covers capable of being made watertight. Unless secured by closely spaced bolts, the covers shall be permanently attached.
Hatch 4S tether chain was not attached.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 August 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 10 August 2021
Resolved
As described in this subchapter under §§42.07-35, 42.07-40, 42.09-15, and 42.09-20, the American Bureau of Shipping or other recognized classification societies approved as load line assigning and issuing authorities perform the duties connected with making load line assignments to vessels.
Wrong stability letter listed on Load Line
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 August 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 10 August 2021
Resolved
That there have not been alterations made to the hull or superstructure which would affect the calculations determining the position of the load line marks.
4 goose necks have been added.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 August 2021
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 10 August 2021
Resolved
SOPEP The ship's name, call sign, official number, International Maritime Organization (IMO) international number, and principal characteristics.
Wrong vessel name on SOPEP
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 August 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 10 August 2021
Resolved
SOPEP If this section is included by the shipowner, it should include the following types of information or any other information that may be appropriate:(i) Response equipment or oil spill removal organizations.
Equipment per section 5.7 not present.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 August 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 10 August 2021
Resolved
The operator of a vessel with a capacity of 250 or more barrels of oil, hazardous material, or liquefied gas as regulated in Table 4 of 46 CFR part 154 shall provide transfer procedures that meet the requirements of this part and part 156 of this chapter for transferring.
Transfer procedures do not have correct contents.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 August 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 10 August 2021
Resolved
A ship of 300 gross tons or more constructed after June 30, 1974 must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe.
Containment was filled with water.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 August 2021
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 August 2021
Resolved
Where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part. One fire extinguisher in vessel was discharged and other extinguishers present were not serviced.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 August 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 October 2018
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in § 91.27–1 (a) and (b) and your Certificate of Inspection must be endorsed.
Vessel passed annual inspection date by over 6 months. Vessel must complete COI inspection and receive valid COI prior to operation. - 46CFR91.27-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2019
Resolution: Completed COI exam.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 10 November 2016
Resolved
Replace broken cam lock on fuel pipping.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Cam lock replaced as required.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 10 November 2016
Resolved
Provide plug for fuel pump containment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Plug for fuel pump containment was provided as required.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 10 November 2016
Resolved
Calibrate Gauge and hydro all hard pipping in fuel system above the main deck to 1.5 MAWP.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: All items hydro tested and calibrated as required.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 10 November 2016
Resolved
Repair/remove ball valve on fuel vents fixed containment. If removed add a plug.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Ball valve on fuel vents fixed containment was repaired.
Pollution Prevention/Response › Response Equipment › Containers
Issued 10 November 2016
Resolved
Required to have spill kit in accordance with SOPEP when vessel is conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Spill kit items put in place IAW SOPEP.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 1 February 2016
Resolved
Remove unapproved portable fuel pump from vessel. Existing pump is not permitted for any service onboard vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Pump was removed and an acceptable pump was provided.
Electrical › Electric Supply System (service) › Cable
Issued 1 February 2016
Resolved
Submit plans to local OCMI for all electrical cabling & power sources being palced on the vessel. All electrical equipemnt must meet 46 CFR subchapter J.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2017
Resolution: Plans were submited to MSC with Examined plans returned for the electtical cabling and power sources being placed on the vessel.
Engineering › Fuel Oil Storage/Transfer System › Portable Fuel System
Issued 1 February 2016
Resolved
Cable winches not permitted to be used due to electrical & fuel system discrepancies. Winches may remain onboard until removed in Tampa, FL in approximately 60 days.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Items needed to be corrected were as needed.
Electrical › Electric Supply System (service) › Cable
Issued 1 February 2016
Resolved
Rewire christmas tree on bow with proper approved cabling meeting 46 CFr subchapter J prior to any construction service requiring use of the christmas tree.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Christmas Tree was rewired as required.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 February 2016
Resolved
Demonstrate to OCMI that barge has proper approverd navigation lights.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2016
Operations/Management › Vessel Activity › Other
Issued 1 February 2016
Resolved
Mark name & hailing port on stern of vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2016
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 1 February 2016
Resolved
Place cap on fuel nozzle on trasnfer hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: Cap was placed on fuel nozzle on transfer hose as required.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 1 February 2016
Resolved
Submit certification for new fuel transfer hose onboard vessel to OCMI.
Due 1 March 2016
Resolved 5 February 2016
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 1 February 2016
Resolved
Hydrostatically test fuel piping prior to using diesel fuel transfer system to 1.5 times MAWP.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2017
Resolution: All piping was hydro tested as required.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 November 2014
Resolved
Prove cargo pump has been designed to minimize sparking or replace w/suitable pump.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 November 2014
Resolved
Provide a pressure gage for the cargo pump discharge.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 18 February 2016
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 13 November 2014
Resolved
Mark cargo piping/hose with service, manufacture date, and test date.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 13 November 2014
Resolved
Prove vessel has shutoff valve at the cargo piping point of entry into the cargo tank.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 13 November 2014
Resolved
Prove cargo hose is rated for pressure head of pump or 150 PSI.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 13 November 2014
Resolved
Provide remote manual shutdown for cargo pump engine.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Deck/Cargo › Cargo Stowage › General
Issued 13 November 2014
Resolved
Remove gas driven cargo pump, welder, from within 10' of cargo tank vent.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Deck/Cargo › Cargo Stowage › General
Issued 13 November 2014
Resolved
Provide hazardous area drawing.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Resolution: Did not require
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 13 November 2014
Resolved
Provide IAPP certificate for winch engines.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Resolution: Did not require. Engines being removed from vessel.
Electrical › Electric Supply System (service) › Battery Charger
Issued 13 November 2014
Resolved
Prove navigation light battery charger is suitable for the battery installation.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 13 November 2014
Resolved
Prove proper operation of generator overspeed.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Resolution: engines not permitted to be used & being removed from vessel.
Deck/Cargo › Cargo Stowage › General
Issued 13 November 2014
Resolved
Prove the on deck fuel tank meets the requirements IM 101 or IM 102.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Resolution: Not on board
Documentation › Markings/Placards › Official Number (US)
Issued 13 November 2014
Resolved
Provide correct name on transom.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Documentation › Logs/Records › Oil Record Book
Issued 13 November 2014
Resolved
Provide Oil Record Book
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Resolution: Not required
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 13 November 2014
Resolved
Provide vessel response plan.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Personnel › Manning/Qualifications › Person in Charge (PIC) of Transfer
Issued 13 November 2014
Resolved
Provide tankerman PIC endorsement.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Communications › Visual Communication › Red Warning Signal
Issued 13 November 2014
Resolved
Provide warning signals.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Communications › Visual Communication › Warning Sign (gangway)
Issued 13 November 2014
Resolved
Provide warning sign.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Electrical › Electrical Distribution System (service) › Switchboard
Issued 13 November 2014
Resolved
Provide generator switchboard instruments (ammeter and voltmeter) as required.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Resolution: Not required
Stability › Intact Stability (when using lifting gear) › General
Issued 13 November 2014
Resolved
Prove current stability book and letter includes equipment for lifting.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 2 February 2016
Stability › Intact Stability (when using lifting gear) › General
Issued 13 November 2014
Resolved
Prove current stability book and letter includes equipment for lifting.
Action required: 705 - Other - as specified
Due 2 January 2015
Resolved 19 December 2014
Resolution: Administratively cleared. Duplicate to #2030809.