Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it27059 - Convention (Subpart B), Gross Ton 12221 - Convention (Subpart B), Net Ton 34410 - Dead Weight, Ton 46260 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel
Behind this panel: 22 inspections, each with its date, unit and type; 14 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 2 other vessels inspected with it; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 December 2025Resolved
Paint lockers shall be protected by a water spraying or sprinkler system.PSCO observed paint being stored in a section of the paint locker not protected by fixed fire protection system (sprinkler)
74SOLAS(20)II-2/10.6.3.1.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 January 2026
Resolution: Flag provided documentation to the movement of paint sotres arranged in the paint locker for the sufficient supression of fixed fire fighting in the space.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 November 2021Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Vessel's main diesel engine experienced a loss of propulsion.
SOLAS 74 (2020cons) I/11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 November 2021
Resolution: Received flag attestation to repair of #6 cylinder.
Vessel reported the main engine governor bridge control has malfunctioned.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 March 2018
Resolved 6 March 2018
Resolution: Received class report stating vessels governor bridge contral has been repaired and is fully functional
Engineering › Compressed Air System (control) › Valve
Issued 29 November 2017Resolved
Vessel experienced a loss of control while getting underway. Crew believes the loss of control was due to a solenoid that malfunctioned.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 7 December 2017
Resolution: Pneumatic valve has been renewed all tests SAT.
Communications › Alarms/Indicators › General Alarm
Issued 12 June 2017Resolved
0675 74SOLAS(14 Cons)III Reg. 6.4.2 The vessel's fire alarm, abandon ship, and public announcement are not operable.
Action required: 705 - Other - as specified
Due 28 June 2017
Resolved 28 June 2017
Resolution: Vessel provided class report attesting to fully operational alarm and PA system.
Accommodation/Occupational Safety › Ventilation › General
Issued 17 May 2017Resolved
74SOLAS(2014CONS)I/11(a) 9800 - PSCE IDENTIFIED WHEN EMERGENCY GENERATOR WAS STARTED EXHAUST WAS WITNESSED IN SPACE AND PORTABLE MONITORING EQUIPMENT IDENTIFIED 20-22 PPM CARBON MONOXIDE IN SPACE
Action required: 705 - Other - as specified
Resolved 18 May 2017
Resolution: SECTOR DELAWARE BAY RECEIVED A CLASS REPORT TO CLEAR DEFICICENCY. DOCUMENT IS IN DOCUMENT TAB
74SOLAS(14CONS)I/11(a) 9800- PSCO IDENTIFIED OIL CONSUMPTION UNDER MAIN ENGINE CRANKSHAFT AND AROUND 3RD GENERATOR GOVENOR.
Action required: 705 - Other - as specified
Resolved 18 May 2017
Resolution: CORRECTED ON THE SPOT
Engineering › Diesel Engine (propulsion-direct drive) › Seal
Issued 16 May 2016Resolved
1420 - The condition of the ship and its equipment shall be maintained to conform with the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persnons on board. PSCO's observed excessive amounts of oil around the main engine, auxiliary engines, and oil purifier room. 74SOLAS(14)I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2016
Resolved 18 May 2016
Resolution: CLass report attested to the condition of the engine room. See attached doument for class report.
The OWS system shall be provided with arrangements to ensure that any discharge of oily mixtures is automatically stopped when the oil content of the effluent exceeds 15 ppm. The 3-way valve on the OWS is not operating properly.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 June 2016
Resolution: Solenoid valve was replaced. See report in documents section.
Engineering › Bilge Water Management System › Pump
Issued 16 May 2016Resolved
1440 - An efficient bilge pumping system shall be provided, capable of pumping from and draining any watertight compartment and for which other efficient means of pumping are provided, under all practical conditions. The oil sludge transfer pump is inoperable. 74SOLAS(04)II-1/21.1.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 June 2016
Resolved 1 June 2016
Resolution: New sludge pump was installed. See Documents tab for receipt.
1230 - Satisfactory means (in the form of guard rails) shall be provided for the protection of the crew in the machinery spaces. The guard rail aft of the main engine on the lowest level of the engine room is severed. ICLL I/25.4
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 15 June 2016
Resolution: Received and reviewed class survey report given by DNV-GL. No further action. See attached document.
Accommodation/Occupational Safety › Ventilation › General
Issued 16 May 2016Resolved
0599 - Machinery spaces of category A shall be adequately ventilated to ensure that when machinery is operating at full power in all weather conditions an adequate supply of air is maintained. There is a temporary fix to the ventilation in place to aid the cooling of auxiliary engines. 74SOLAS(04)II-1/35
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Received and reviewed class survey report given by DNV-GL. No further action. See attached document.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 16 May 2016Resolved
0199 - The frequency of the test and inspection for bunker lines required by this section for vessels must be annually. A bunker line test has not been completed since 15MAY15. 33CFR156.170(f)(3)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Received and reviewed class survey report given by DNV-GL, and also report from the master attesting to the bunker line test. No further action. See attached document.
The condition of the ship and its equiptment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all aspects will remain fit to proceed to sea. During operational test of the Oil Water Separator the second stage filter began to leak as it was pressurized. 40AC
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 April 2016
Resolution: Second stage filter pin hole has been repaired by specialist using belzona repair procedures and found satisfactory. CC imposed for permanent repairs to be completed with 2016-07-07.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.