Records in 2023. Most recent: inspection, 10 June 2023.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 May 2023
Resolved
74SOLAS III/20.2
BEFORE THE SHIP LEAVES PORT AND AT ALL TIMES DURING THE VOYAGE, ALL LIFESAVING APPLIANCES SHALL BE IN WORKING ORDER AND READY FOR IMMEDIATE USE.
PSCO OBSERVED PULL STARTER FOR RESCUE BOAT ENGINE FAIL WHEN ATTEMPTING AN ENGINE START. RESCUE BOAT ENGINE IS UNABLE TO START IN CURRENT CONDITION.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2023
Resolution: PSCO OBSERVED THE RESCUE BOAT ENGINE START SATISFACTORILY.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 15 March 2023
Resolved
15109 - Maintenance of the ship and equipment
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations, and with any additional requirements which may be established by the company. Due to the objective evidence detailed in the below deficiencies, the vessel is not in substantial compliance with the relevant conventions, calling into question the adequacy and implementation of the vessel's SMS under the ISM code. Furthermore, PSCO observed objective evidence that the SMS requirements for watertight doors and watertight hatches inspection were not being adhered to. The vessel SMS had a watertight door and hatch inspection requirement of every 3-months. The last inspection was dated on 29JAN2023 and the graded by the crew as "4" on a 1-5 scale, with 1 meaning "bad" and 5 meaning "excellent", signed off by the [name withheld] An external audit conducted by Flag or RO is required to determine whether the ship is operating in accordance with the ISM Code. Provide a copy of the completed audit report to USCG prior to departure from port.
74 SOLAS (20) IX/3.1
ISM Code A/10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO conducted external ISM audit focusing on maintenance of ship and equipment and training.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 March 2023
Resolved
03107 - Doors
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel... The means for securing these doors weather-tight shall consist of gaskets, and clamping devices, or other equivalent means. PSCO observed 06 weather-tight doors on the main superstructure that did not properly secure due to corrosion around edges, defective gaskets, and closure devices that do not secure properly.
ICLL (88) CH.2/12
Action required: 30 - Ship detained
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; Defective gaskets were replaced and securing devices were greased, weathertight doors were tested and found in order.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 15 March 2023
Resolved
03104 - Cargo & other hatchways
The means for securing and maintaining weather-tightness shall be to the satisfaction of the Administration. The arrangements shall ensure that the tightness can be maintained in any sea conditions. PSCO observed 06 hatch covers not properly securing for weather-tightness due to excessive corrosion, defective gaskets, and closure devices that do not secure properly.
ICLL (88) CH.2/16.1
Action required: 30 - Ship detained
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; gaskets were renewed and securing devices replaced, hatches were tested and founding in working order.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 March 2023
Resolved
07105 - Fire doors/openings in fire-resisting divisions
In order to contain a fire in the space of origin, the fire integrity of the divisions shall be maintained and openings and penetrations. PSCO observed 04 damaged or modified A-0 fire doors (main deck stairwell door, main deck engineering space door, main deck stairwell door leading to engine room, and galley door) that would not prevent the passage of smoke or flame. Furthermore, PSCO observed 02 self-closing A-0 fire doors (galley door and door leading to ventilation stack) that did not operate as intended.
74 SOLAS (2014) II-2/9.1.3
Action required: 30 - Ship detained
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved temporary repairs with permanent repairs to be affected by 15APR2023.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 15 March 2023
Resolved
09204 - Safe means of access
Escape routes shall be maintained in a safe condition clear of obstacles. PSCO observed emergency exit forward of engine room was unable to open fully due to hatch cover becoming impeded by coaming of cargo hold. Due to this, the counterweight was unable to fully hold open the hatch cover in the vertical position.
74 SOLAS (2014) II-2/13.1.2
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; Excess paint on cargo hold was grinded off, allowing emergency escape hatch to open freely.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 March 2023
Resolved
04103 - Emergency, lighting, batteries and switches
Alleyways, stairways, and exits giving access to the muster and embarkation stations shall be lighted. PSCO observed multiple emergency lights on cargo deck and around superstructure either inoperable or incorrectly marked.
74 SOLAS (2004) III/11.5
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; defective emergency lights on cargo deck and around superstructure were repaired and marked to identify emergency lights from non-emergency lights. Tested and found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 March 2023
Resolved
13199 - Other (machinery)
Suitable pressure relief arrangements shall be provided for all systems. PSCO observed on the 02 main air receivers, the pressure relief valves were present but did not have identifiable relief valve settings.
74 SOLAS (2004) II-1/34.1
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; new pressure relief valves installed on air receivers and added to SMS maintenance schedule.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 March 2023
Resolved
13199 - other (machinery)
Suitable pressure relief arrangements shall be provided for all systems. PSCO did not observed an identifiable pressure relief valve on the reserve air receiver.
74 SOLAS (2004) II-1/34.1
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repairs; new pressure relief valve installed on reserve air receiver.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 15 March 2023
Resolved
02112 - Hull - corrosion
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed floodlight cover for port side cargo hold No.3A to be secured only by two bolts, rendering it non-weathertight.
74 SOLAS (2020)I/11a
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; crew replaced all missing bolts on the cover and made cover weathertight.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 15 March 2023
Resolved
09206 - Safe means of access Deck - hold/tank, etc.
Effective protection for the crew in the form of guardrails or lifelines shall be provided above the deck cargo if there is no convenient passage on or below the deck of the ship. PSCO observed broken guardrail on starboard side of cargo deck, between cargo holds 2 and 3.
ICLL (88) Annex I/25.5
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repairs; Broken guardrails were replaced and stanchions and lifelines were found connected.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 March 2023
Resolved
02108 - Electrical installations in general
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed deteriorated mounting hardware for the reefer containers junction box.
74 SOLAS (2020) I/11a
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; mounting hardware replaced.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 15 March 2023
Resolved
07115 - Fire-dampers
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed the three fire dampers for the engine room ventilation secured in the open position using blocks and bolts screwed into the bulkhead. To close the dampers, tools were required to remove the blocks and screws and were not readily available.
74 SOLAS (2020) I/11a
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repairs; missing butterfly nuts were installed on fire dampers and required tools were provided for operation.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 15 March 2023
Resolved
15106 - Shipboard operations
The Company should establish procedures, plans, and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. PSCO observed crew attempting to test thermal fire-detection equipment using unapproved methods, not in alignment with manufacturer’s procedures or vessel SMS. Vessel had approved testing equipment onboard, but it failed after four testing attempts and crew attempted to use a lighter to finishing testing.
74 SOLAS (2020) IX/3.1
ISM Code A/7
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved additional training for the crew on testing of detectors IAW SMS procedures/instructions. All fire detection testing equipment onboard was found satisfactory.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 15 March 2023
Resolved
15106 - Shipboard operations
The company should establish procedures, plans, and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. PSCO observed objective evidence that the maintenance and testing of fire-detection equipment, as required by the vessel SMS, was not being adhered to. PSCO requested crew to test detector above the main engine, crew made several attempts using test device for smoke detection. Further investigation determined that main engine detector was of a thermal detection type. Discussions with crew indicated that they were unaware of what type of fire-detection equipment was installed.
74 SOLAS (2020) IX/3.1
ISM Code A/7
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO witnessed additional training for crew on fire-detection testing equipment use IAW SMS procedures/instructions.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Water, pipes, tanks
Issued 15 March 2023
Resolved
18316 - Water, pipes, tanks
Cold fresh water and hot fresh water available in all wash spaces. PSCO observed lack of hot water in hospital space, galley, and in 02 water closets.
PWSA 46 USC 70002
ILO-147 p. 37/21(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; Hot water was reestablished in hospital sapce, galley, and 02 water closets identifed by PSCO.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 March 2023
Resolved
11135 - Maintenance of Life Saving Appliances
All life-saving appliances prescribed in this part shall be fitted with retro-reflective material where it will assist in detection. PSCO observed retro-reflective tape on rescue boat and lifeboat to be faded and deteriorated.
74 SOLAS (2020) III/34
LSA Code 1.2.2.7
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; retro-reflective tape on rescue boat and lifeboat was renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 March 2023
Resolved
09209 - Electrical
Terminations and joints in all conductors shall be so made as to retain the original electrical, mechanical, flame-retarding and, where necessary, fire-resisting properties of the cable. PSCO observed unsecured dead-end wires on starboard side of cargo hold No. 2B.
74 SOLAS (2004) II-1/45.5.6
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 March 2023
Resolved 17 March 2023
Resolution: RO approved repair; unsecured dead-end wires were reconnected to newly installed light on cargo hatch No. 2B on starboard side.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 March 2023
Resolved
09209 - Electrical
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured. PSCO observed 02 electrical connections in galley with grounding wires not connected.
74 SOLAS (2004) II-1/40.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 March 2023
Resolved 17 March 2023
Resolution: RO approved repairs; Electrician confirmed grounding cable reconnected in electrical outlet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 March 2023
Resolved
13199 - Other (machinery)
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed wastage around the drainpipe in the drip pan for the oil purifier equipment. The wastage in the containment allowed for oil to drip into a lower skid and saturate the lagging of piping below.
74 SOLAS (2020) I/11a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 17 March 2023
Resolution: RO approved repair; wasted area around drain pipe was renewe and oil soaked insulation below the deck was renewed.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 15 March 2023
Resolved
09130 - Water, pipes, tanks
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed excessive corrosion to the bottom of the forward water heater and wastage around the heating elements penetrating the side shell on both water heaters.
74 SOLAS (2020) I/11a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 17 March 2023
Resolution: RO approved repairs on heating elements; RO approved temporary repairs to forward water heater bottom with permanent repairs due 15APR23.
11 - Life Saving Appliances › N/A - No Subsystem › Means of recovery of life saving appliances
Issued 15 March 2023
Resolved
11126 - Means of recovery of life saving appliances
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed the davit recovery hook for the lifeboat to be wasted.
74 SOLAS (2020) I/11a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 17 March 2023
Resolution: RO imposed a condition of class to have permanent repair/replacement by 15APR23.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 15 March 2023
Resolved
11112 - Launching arrangements for survival craft
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed a 2-inch crack on the starboard side of the lifeboat davit’s launch ramp.
74 SOLAS (2020) I/11a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 17 March 2023
Resolution: RO approved repair; certified welder made repairs to lifeboat davit.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 March 2023
Resolved
06199 - Other (cargo)
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed damaged to starboard cargo hold No. 1 and a cracked container securing mount and a cracked external tripping bracket on cargo hold No. 2.
74 SOLAS (2020) I/11a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 17 March 2023
Resolution: RO approved permanent repair on the cargo hold No.2. RO arequired permanent repair on the cargo hold No. 1 by 15APR23.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 March 2023
Resolved
13102 - Auxiliary engine
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed excessive wastage on the air exhaust for emergency generator.
74 SOLAS (2020) I/11a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 17 March 2023
Resolution: RO approved temporary repair with permanent repair required by 15APR23.