Records from 2018 to 2026. Most recent: inspection, 13 March 2026.
Inspection history · 32
13 March 2026
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8325597
25 August 2025
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8217345
3 March 2025
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8087574
7 February 2025
Deficiency Check · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8076130
7 February 2025
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8076308
26 December 2024
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8051030
25 December 2024
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8050746
12 August 2024
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7979292
31 January 2024
PSC A
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7857055
22 January 2024
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7852441
13 June 2023
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7713800
1 June 2022
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7465175
30 November 2021
MARPOL Annex VI Survey · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7358921
19 November 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7354108
18 November 2021
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7353440
19 March 2021
PSC B · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7159428
28 October 2019
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6843330
14 October 2019
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6834086
30 September 2019
ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6824163
16 September 2019
PII Safety Exam · Ballast Water Examination · Deficiency Check · Administrative Inspection · ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6812714
15 June 2019
PII Safety Exam · ISPS III Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6714510
14 June 2019
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6713974
17 May 2019
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6686320
6 May 2019
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6677967
29 April 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6672350
28 April 2019
PII Safety Exam · Deficiency Check · Administrative Inspection · ISPS III Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6671760
9 April 2019
ISPS II Exam · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6658694
8 April 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6658105
2 January 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6604880
24 December 2018
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6602353
3 December 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6591173
16 April 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6392504
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 February 2025
Resolved
Maintenance, testing and inspections shall be carried out based on the guidelines developed by the Organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. PSCO observed no annual external servicing reports for the 2024 for fixed fire-fighting systems.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2025
Resolved 11 February 2025
Resolution: Received class report dated 11FEB25 detailing class clearance (attached).
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 31 January 2024
Resolved
The following fire protection systems shall be kept in good working order so as to ensure their required performance if a fire occurs: structural fire protection, including fire-resistance divisions, and protection of opening and penetrations in these divisions. A60 self-closing fire door leading to the incinerator room was found open and not closing.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 February 2024
Resolved 1 February 2024
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 22 January 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present
regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship
or persons on board. The vessel reported a failure of the electrical equipment in the forecastle yielding the
vessel's anchoring and mooring equipment inoperable. The lack of operable mooring winches and the anchor
windlass poses a potential safety hazard to the ship and persons on board.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 January 2024
Resolution: Vessel provided documents from Class and Flag attesting to correction. Scanned into documents.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 June 2023
Resolved
the following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection including fire-resisting divisions, and penetrations in these divisions. PSCO observed 03 class "A" fire doors with holes.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2023
Resolved 28 June 2023
Resolution: received class report attesting to satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 30 November 2021
Resolved
THE STEERING GEAR COMPARTMENT SHALL BE PROVIDED WITH ARRANGEMENTS TO ENSURE WORKING ACCESS TO MACHINERY AND CONTROLS TO INCLUDE HANDRAILS AND GRATINGS OR OTHER NON SLIP SURFACES TO ENSURE WORKING CONDITIONS IN THE EVENT OF A HYDRAULIC FLUID LEAK. PSCO OBSERVED NO NONSLIP SURFACE OR GRATING IN THE STEERING ROOM. 74SOLAS(04)CONSOL II-1/29.13.2
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2021
Resolved 11 December 2021
Resolution: Approved non slip surface has been installed and verified. All Sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 November 2021
Resolved
The condition of the ship and its equipment shall be maintained to ensure it remains fit for sea. While outbound, vessel experienced a loss of propulsion. Make repairs and provide class report addressing the causative factors and corrective measures.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 November 2021
Resolved 18 November 2021
Resolution: See attached DNV Class report for further details; class id'ed that failure was due to governor malfunction. DNV cleared the vsl to proceed with outstanding Condition of class.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 16 September 2019
Resolved
(07126)(74 SOLAS 04, II-2/4.1)(17ac)
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET. MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. MEANS SHALL BE PROVIDED TO LIMIT THE ACCUMILATION FLAMMABLE LIQUIDS. PSCO'S OBSERVED SEVERAL LEAKS FROM MACHINERY THROUGHOUT ENGINE ROOM. PSCO'S OBSERVED EXCESSIVE FUEL AND LUBE OIL LEAKAGE AROUND #3, #4, AND #5 MAIN ENGINE CYLINDERS. PSCO'S OBSERVED LUBE OIL LEAK ON #1 GENERATOR OF APPROXIMATELY ONE DROP PER EVERY THREE SECONDS. PSCO'S OBSERVED EXCESSIVE LEAKAGE AROUND BOTH HEAVY FUEL PURIFIERS DO TO CONNECTIONS IN THE ASSOCIATED PIPING.
Action required: 705 - Other - as specified
Due 16 September 2019
Resolved 30 October 2019
Resolution: Received, reviewed, and accepted Class Report from DNV-GL.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 16 September 2019
Resolved
(01199)(74 SOLAS 14, I-10(a)(ii))(17abc)
THE STRUCTURE MACHINERY AND EQUIPMENT OF A CARGO SHIP AS REFERRED TO IN PARAGRAPH (b)(i) SHALL BE SUBJECT TO THE SURVEYS AND INSPECTIONS SPECIFIED BELOW; A RENEWAL SURVEY AT INTERVALS SPECIFIED BY THE ADMINISTRATION BUT NOT EXCEEDING 5 YEARS. VESSEL HAS DOCUMENTATION AUTHORIZED AN EXTENDED DRY-DOCK PERIOD OF 7.5 YEARS FROM LIBERIA AND DNV-GL. HOWEVER, DNV-GL PROVIDED THE STIPULATIONS THAT THE VESSELS CLASS, FLAG, OWNER OR MANAGER CANNOT CHANGE OR THE APPROVAL FOR THE PROGRAM BECOMES INVALID. THE VESSEL'S MANAGING COMPANY CHANGED ON 18MAR19 AND THE VESSEL HAS NO DOCUMENTATION OF RECEIVING APPROVAL FOR PROGRAM WITH NEW COMPANY. VESSEL NEEDS DETERMINATION ON WHEITHER THEY ARE STILL ELIGIBLE FOR EXTENSION.
Action required: 17 - Rectify deficiencies prior to departure
Due 16 September 2019
Resolved 30 September 2019
Resolution: Received, reviewed, accepted class report stating that vessel shall reapply for new extended dry dock approval due to the change in management since they last applied for the extended dry dock program.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 16 September 2019
Resolved
(02105)(74 SOLAS 04, II-1/29.2.1)(16ac)
ALL THESE STEERING GEAR COMPONENTS AND THE RUDDER SYOCK SHALL BE OF SOUND AND RELIABLE CONSTRUCTION TO THE SATISFACTION OF THE ADMINISTRATION. PSCO'S FOUND HYDRAULIC PIPING ON STEERING GEAR PUMP #1 TO BE LEAKING AT A RATE OF ONE DROP EVERY THREE SECONDS
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 September 2019
Resolved 30 October 2019
Resolution: Received, reviewed, and accepted Class Report from DNV-GL.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 September 2019
Resolved
(99101)(33 CFR 156.170 (c)(4)(40c)
EACH LOADING ARM AND EACH TRANSFER PIPE SYSTEM INCLUDING EACH METALLIC HOSE MUST NOT LEAK UNDER STATIC LIQUID PRESSURE AT LEAST 1.5 TIMES THE MAX ALLOWABLE WORKING PRESSURE. VESSEL COULD NOT PROVIDE EVIDENCE OF BUNKER LINE HYDROSTATIC TEST AT 1.5 TIMES MAX LEVEL OF WORKING PRESSURE.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 October 2019
Resolution: Received satisfactory documentation that tests were conducted.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 6 May 2019
Resolved
After any survey of the ship under paragraph 1 of this regulation has been completed, no change shall be made in the structure, equipment, systems fittings, arrangements or material covered by the survey without the sanction of the Administration, except the direct replacement. PSCO observed while running OWS that a 1/4 turn ball valve was fitted on the discharge side of the oil content meter, that when closed would not allow the discharge sample to flow across content meter photo eye, allowing affluent from OWS to be discharged overboard. MARPOL Annex I Regulation 6.4.2
Action required: 30 - Ship detained
Due 6 May 2019
Resolved 10 May 2019
Resolution: Received satisfactory Class Report.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 May 2019
Resolved
Suitable arrangements shall be provided to preclude as far as practicable, the entry of oil or other contaminates. PSCO observed an oil like substance in the boiler condensate tank.
Action required: 705 - Other - as specified
Due 6 May 2019
Resolved 30 October 2019
Resolution: Received satisfactory Class Survey report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 May 2019
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board. The PSCO observed the variable injection timing system on the main engine dismantled. The upper plunger rods are held into position with wire.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 May 2019
Resolved 10 May 2019
Resolution: Received satisfactory Class Report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2019
Resolved
Connections within the fuel supply shall be constructed to prevent oil fuel leaks. PSCO observed a fuel leak on the #3 cylinder (M/E) after the high pressure fuel pump.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 May 2019
Resolved 10 May 2019
Resolution: Received satisfactory Class Report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019
Resolved
An efficient bilge pumping system shall be provided. The bilge piping system for the engine room is dismantled and the bilge pump is missing.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 May 2019
Resolved 14 October 2019
Resolution: Crew required and installed a new bilge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2019
Resolved
The machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed a jacket water leak on the #5 cylinder.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2019
Resolved 14 October 2019
Resolution: Crew members installed a new o-ring on the No. 5 unit liner sealing the cylinder head leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2019
Resolved
The condidtion of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed the hot water heater (pressure vessel) leaking due to wastage at the bottom.
Action required: 705 - Other - as specified
Due 6 May 2019
Resolved 30 October 2019
Resolution: Received satisfactory Class Survey report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2019
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board. The incinerator exhaust fan is inoperable due to a broken belt.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2019
Resolved 14 October 2019
Resolution: Crew ordered new belts and fan was tested to the satisfaction of attending surveyor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2019
Resolved
The arrangements for the storage, distribution and initialization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. There are numerous leaks and accumulation of fuel oil in the engine room. Heavy accumulations in the purifier space, auxiliary engine sumps & bilges, on the main engine & in the bilges are evident. Numerous unauthorized catch buckets were also noted throughout the engine room. SOLAS 74/78 (14 cons) II-2/4.2.2
Action required: 30 - Ship detained
Due 5 May 2019
Resolved 10 May 2019
Resolution: Received satisfactory Class Report.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 May 2019
Resolved
Fire fighting systems shall be maintained ready for use. PSCO observed remote actuator valve for engine room CO2 discharge valve secured with cotter pin rendering remote activation impossible. SOLAS 74/78 (14 cons) II-2/14.1.1
Action required: 30 - Ship detained
Due 5 May 2019
Resolved 10 May 2019
Resolution: Received satisfactory Class Report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 April 2019
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel experienced loss of propulsion speed control from bridge station.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 April 2019
Resolved 9 April 2019
Resolution: Received Class report. Fuel control linkage repaired. All propulsion equipment tested and sat.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 8 April 2019
Resolved
At least two independent means shall be provided for communicating orders from the navigation bridge to the position in the machinery space or in the control room from which the engines are normally controlled: one of these shall be an engine-room telegraph which provides visual indication of the orders and responses both in the machinery space and on the navigation bridge. Vessel reported inoperable engine-room telegraph system.
74 SOLAS (14) II-1/37.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 April 2019
Resolution: Deficiency improperly logged due to improper delegation of faulty equipment. See Activity #6658694
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 2 January 2019
Resolved
Recovery time of the rescue boat shall be not more than 5 mins. Due to damage caused by heavy weather the rescue boat is non-operational and unable to meet the time requirements for recovery.
74 SOLAS (14) III/17.4 17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 January 2019
Resolution: The rescue boat was replaced with a new SOLAS approved rescue boat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 2 January 2019
Resolved
Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use. The launching appliance for the rescue boat and davit launch life rafts in in-op.
74 SOLAS (14) III/20.2 17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 January 2019
Resolution: The davit was repaired and verified by DNV-GL surveyor. Operational test SAT.