Records from 2016 to 2025. Most recent: inspection, 17 March 2025.
Inspection history · 16
17 March 2025
PSC B
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8094935
15 March 2025
MARPOL Annex I Examination · PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8090736
15 March 2025
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8094264
6 September 2023
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7780363
17 February 2022
PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7397732
2 February 2022
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7389809
27 March 2021
PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7161064
2 March 2020
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6919147
28 February 2020
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6917345
28 February 2020
COE-Dockside
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6917756
4 September 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6803406
23 June 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6714538
15 June 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6439336
5 June 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6162485
25 May 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6155032
28 January 2016
Administrative Inspection · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5803831
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 15 March 2025
Resolved
Oil filtering equipment shall be provided with alarm regulations to indicate when the level cannot be maintained. The system shall also be provided with arrangements to ensure that any discharge of oily mixtures is stopped when the oil content of the effluent exceeds 15 ppm.
MARPOL 73/78 Cons ED. 2022 Annex 1/REG 14.7
Upon operational test of the MEPC.107(49) OWS and Oil Content Meter (OCM) the crew did not open the discharge sample line to the OCM and therefore could not verify proper reading of oil content in discharge water. Furthermore, crew damaged the 2nd stage coalescer by over pressuring the system during testing. Crew was unfamiliar with proper testing and operating procedures of OWS and OCM. Upon review of last OWS/OCM operation in OCM log the last operation of OCM on 26OCT2024 indicated that the OCM did not detect any PPM reading suggesting that sample line was closed during discharge operation. OWS shall not be used until class verified proper operation.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2025
Resolved 17 May 2025
Resolution: PSCO observed proper use of OWS System during PSC exam.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 15 March 2025
Resolved
The company should establish procedures, plans, and instructions, including checklists as appropriate, for key shipboard operations concerning…protection of environment.
In accordance with Company ISM Policy EME 008, 3.10 the function testing and operation of OWS and OCM shall be kept in good working order. Crew did not properly test or operate system as per manufacturer’s instructions. Recommend an ISM audit from Class focused on environmental policy within 90 days.
74 SOLAS (am) IX/3.1
ISM Code Part A 7
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2025
Resolution: PSCO observed proper use of OWS System during PSC exam.