Records from 2016 to 2019. Most recent: inspection, 4 December 2019.
Inspection history · 7
4 December 2019
COC-MODU Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6866550
7 December 2018
COC-MODU Renew
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6597675
16 February 2018
COC-MODU Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6357782
28 December 2017
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6329786
24 July 2017
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6220650
14 January 2017
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6070953
28 November 2016
COC-MODU Renew
Type not classified · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6048547
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 4 December 2019
Resolved
All Life saving appliances should be evaluated tested and approved as provided in 74SOLAS Regulation III/4 and III/5. The #3 Lifeboat was only able to start on one of its battery banks, and the life jackets on the port side were in need of replacement of their retro reflective tape.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2019
Resolved 10 December 2019
Resolution: Letter from BS satisfying the issues.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 December 2019
Resolved
Load line hall be marked in contrasting color. Load lines on both sides of hull need to be painted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2019
Resolved 10 December 2019
Resolution: Letter from BS satisfying the issues.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 4 December 2019
Resolved
The oil record book required by MARPOL Annex I requires weekly soundings of the sludge tanks in cubic meters. Soundings entries for the last month hanot not been entered and multiple entries that have are in metric tons.
MARPOL 73/78 I/17
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2020
Resolved 10 December 2019
Resolution: Letter from BS satisfying the issues.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Diesel engine relating to air pollution control
Issued 4 December 2019
Resolved
The EIAPP certificates required by MARPOL Annex VI could not be presented. Engine Tech Files required by Annex VI did not have parts change out records requited by parameter check method option of verification. Present EIAPP certificates and update Tech Files.
MARPOL 73/78 VI/13
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2020
Resolved 16 December 2019
Resolution: ABS contacted USCG. Files onboard but could not be found by crew.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Quality of fuel oil
Issued 4 December 2019
Resolved
The fuel oil samples required by MARPOL Annex VI were not properly labled or sealed with required tamper seals. Begin lableing and sealing samples and update management system.
MARPOL 73/78 I/18.8.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2020
Resolved 16 December 2019
Resolution: Class contacted and held training. Supplies obtained and samples reviewed for appropriate entries.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 16 February 2018
Resolved
Instructions for on-board maintenance of lifesaving appliances complyinjg with the requirements of regulation III/52 should be provided and maintenance should be carried out accordingly. During examination of lifeboats, examiners observed charging cable on lifeboat #4 was pulled from housing. Lifeboat #4 would not start on battery bank #2. Furthermore, air discharge regulator on lifeboat #4 is inoperable. Lifeboat #3 bottle pressure was found at 2500 psi (min pressure is 2800 psi).
Action required: 705 - Other - as specified
Due 16 March 2018
Resolved 7 December 2018
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 16 February 2018
Resolved
Fire resistance of doors should as far as practicable, be equivalent to that of the division in which they are fitted. External doors in superstructures and deck houses should be constructed to at least the class standard and be "self closing" where practicable. During exam, several fire doors in stairway were not closing completely. One door, from galley, was an A60 door that was not fitted with self closing device. Provide master/OIM statement attesting to the proper installation of self closing mechanism and proper operation of all fire doors.
Action required: 705 - Other - as specified
Due 16 March 2018
Resolved 7 December 2018