Records from 2011 to 2026. Most recent: inspection, 5 August 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 24
5 August 2026
Administrative Inspection
Administrative · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 8449470
7 May 2026
Deficiency Check
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 8361291
18 August 2025
Annual Inspection
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 8194382
22 May 2024
Annual Inspection
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7916603
7 June 2023
Annual Inspection
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7704827
19 May 2022
COI Inspection · Deficiency Check
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7454414
8 April 2022
Deficiency Check · Hull Examination
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7427115
17 August 2021
Annual Inspection
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7261876
30 April 2021
Excursion Permit · Administrative Inspection
Administrative · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7186497
24 June 2020
DAPI Audit · Annual Inspection
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 6985743
5 June 2019
Deficiency Check · Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6816229
10 April 2019
Administrative Inspection · Excursion Permit
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6660136
16 August 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6525292
30 May 2017
Drydock Exam · COI Inspection
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 6159829
23 June 2016
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5924183
9 June 2016
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5924139
22 April 2016
Hull Examination
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5863637
5 June 2014
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4887171
25 June 2012
Plan Review "T" Boat · Initial Certification
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4358343
11 June 2012
Inclining Experiment
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4349511
19 July 2011
COI Inspection
Physical examination · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 4086395
18 July 2011
Simplified Stability Test
Physical examination · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 4086376
18 July 2011
Plan Review "T" Boat
Administrative · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 4086402
18 February 2011
Construction Oversight
Physical examination · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 3947936
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 August 2025
Resolved
Pre-engineered fixed gas fire extinguishers require an audible alarm and light upon discharge. Visual and audible indicators did not operate when simulating discharge.
**Vessel given to the start of 2026 boating season to repair. FF System needs completely new control panel and manual actuation pull cord.**
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 September 2025
Resolved 7 May 2026
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 August 2025
Resolved
First aid kit requires antispetic and analgestic medication. All listed were expired and/or missing.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 19 August 2025
Resolved 18 August 2025
Resolution: Fixed on the spot
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 22 May 2024
Resolved
Vsls 26+ ft must be provided bilge suction in each watertight compartment with a visual & audible bilge alarm at the op station. Bilge alarm & pump not op. Corrected-on-the-spot.
Action required: 10 - Deficiency Rectified
Resolved 22 May 2024
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 7 June 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46CFR199.175(b)(10) or a kit with equivalent contents and instructions. The first-aid kit onboard was expired.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Corrected on-the-spot.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 7 June 2023
Resolved
A vsl on a rivers route must carry 03 hand red and 03 hand orange smoke distress signals. No unexpired hand orange smoke or approved substitutions onboard.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Corrected on-the-spot.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 June 2023
Resolved
Each RLB equipped with a floating water light must have a lanyard securing the light around the body of the RLB with a corrosion-resistant clip. Light lanyard secured around RLB grab light and no clip was present.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Corrected on-the-spot.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 May 2022
Resolved
A vessel not more than 26 feet in length must carry a minimum of one life ring buoy of not less than 20 inches. On board life ring grab line was deteriorated and life ring was found in unserviceable condition. Provide serviceable life ring to be installed on board as required.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 May 2022
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 24 May 2022
Resolved
Crew training shall be logged or otherwise documented for review by the Coast Guard upon request. The training shall include the following information: (1) Date of the training (2) General description of the training topics. Provide required crew training documentation of conducted training.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 May 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 August 2021
Resolved
Identified missing fire bucket.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 August 2021
Resolved 17 August 2021
Resolution: Vessel representative provided missing equipment.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 August 2018
Resolved
Lifejackets were inadequately constructed and did not meet donning requirements as specified by approval number. Renew all lifejackets with servicable and approved type.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2018
Resolved 31 August 2018
Resolution: renewed all lifejackets and properly labeled and stowed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 August 2018
Resolved
Electrical connectors to service batteries must be screw terminals. Battery charger connections made with spring clamps must be removed and reconnected using screw terminals.
Due 31 August 2018
Resolved 31 August 2018
Resolution: spring clips removed and proper screw terminal connections made.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 9 June 2016
Resolved
Power ventilation did not shutdown upon activation. 46 CFR 182.420(a)(3)
Due 1 August 2016
Resolved 29 June 2016
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 9 June 2016
Resolved
Emergency check list instructions shall be available or posted. 46 CFR 185.510(c)
Due 1 August 2016
Resolved 29 June 2016
Fire Fighting › Fire Bucket › Quantity
Issued 9 June 2016
Resolved
Vessel had two fire buckets. Vessel is required three buckets.
Due 1 August 2016
Resolved 29 June 2016
Deck/Cargo › Towing › Chocks
Issued 22 April 2016
Resolved
Bow eyebolt for winch clip connection and hauling onto trailer was loose and required caulk.
Tighten bow eyebolt and reseal in way of thru penetration.
Due 30 June 2016
Resolved 1 August 2017
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 5 June 2014
Resolved
Child lifejacket stowage was not properly marked.
Due 5 June 2014
Resolved 5 June 2014
Resolution: Remounted placard that had come dislodged.