SLNC MAGOTHY is a freight ship. The Coast Guard has recorded 81 inspections since 2016, most recently in November 2023, along with 70 deficiencies, 7 operational controls and 9 casualty investigations between 2017 and 2023.

Records from 2016 to 2023. Most recent: inspection, 24 November 2023.

Built
Not recorded
Last inspected
24 November 2023
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9418975
WDI3067
1106654
Flag
LIBERIA
Maury page id
psix-1106654

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspections, by type

…with no type recorded16
Years with a record 8 calendar years (2016–2023)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it15549 - Convention (Subpart B), Gross Ton
6089 - Convention (Subpart B), Net Ton
18388 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspection history · 81

24 November 2023 In-Service Inspection
Physical examination · Activities Europe · Activity 7829080
20 November 2023 Administrative Inspection · Deficiency Check
Physical examination · Activities Europe · Activity 7827267
16 October 2023 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7809377
29 September 2023 Administrative Inspection
Administrative · Activities Europe · Activity 7800462
21 July 2023 Administrative Inspection
Administrative · Activities Europe · Activity 7751710
21 July 2023 Administrative Inspection · Deficiency Check
Physical examination · Activities Europe · Activity 7752572
21 July 2023 Type not recorded
No type recorded · Activities Europe · Activity 7764547
23 June 2023 Administrative Inspection · Damage Survey
Physical examination · Activities Europe · Activity 7721465
30 May 2023 Administrative Inspection
Administrative · Activities Europe · Activity 7700036
17 May 2023 Administrative Inspection
Administrative · Activities Europe · Activity 7691101
10 May 2023 Deficiency Check · COI Inspection · MSP COI Oversight
Physical examination · Activities Europe · Activity 7679232
28 March 2023 Drydock Exam
Physical examination · Activities Europe · Activity 7658283
7 March 2023 Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7647292
16 December 2022 Administrative Inspection
Administrative · Activities Europe · Activity 7609956
16 December 2022 Administrative Inspection
Administrative · Activities Europe · Activity 7609960
8 December 2022 Administrative Inspection
Administrative · Activities Europe · Activity 7606684
18 November 2022 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7599470
12 November 2022 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7859238
20 October 2022 Administrative Inspection · Deficiency Check · Drydock Extension · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7595968
30 May 2022 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7529523
25 April 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7437348
24 April 2022 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7444315
14 February 2022 Deficiency Check · MTSA/ISPS Verification · Administrative Inspection · MSP Annual Oversight
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7395988
10 November 2021 Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7346021
9 November 2021 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7348015
26 June 2021 Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7232811
14 May 2021 Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7199278
7 May 2021 MSP Annual Oversight · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7189408
2 February 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7134857
4 September 2020 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7049955
10 August 2020 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7057959
27 July 2020 Administrative Inspection
Administrative · Activities Europe · Activity 7017131
1 July 2020 MSP COI Oversight · Deficiency Check · MTSA/ISPS Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6984037
27 April 2020 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6944622
28 February 2020 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6917335
16 January 2020 Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6891651
30 December 2019 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6880794
25 December 2019 Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6880303
4 December 2019 Administrative Inspection · Drydock Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6864430
19 October 2019 Type not recorded
No type recorded · Activities Europe · Activity 6844458
17 September 2019 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6813673
17 September 2019 MSP Annual Oversight · Deficiency Check · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6813896
13 September 2019 Bulk Liquid Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6811027
12 February 2019 Administrative Inspection
Administrative · Activities Europe · Activity 6631491
11 February 2019 Administrative Inspection
Administrative · Activities Europe · Activity 6623644
24 December 2018 Administrative Inspection
Administrative · Activities Europe · Activity 6603547
4 December 2018 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6592240
19 November 2018 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6583206
10 October 2018 MSP Periodic Oversight · MTSA/ISPS Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6557744
18 September 2018 Type not recorded
No type recorded · Activities Europe · Activity 6552114
16 August 2018 Type not recorded
No type recorded · Activities Europe · Activity 6514631
14 June 2018 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6443872
8 June 2018 Administrative Inspection
Administrative · Activities Europe · Activity 6444988
12 February 2018 MTSA/ISPS Verification · Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6353712
24 January 2018 Security Breach · Administrative Inspection
Administrative · Activities Europe · Activity 6351621
14 December 2017 Administrative Inspection
Administrative · Activities Europe · Activity 6325012
14 December 2017 Type not recorded
No type recorded · Activities Europe · Activity 6325792
12 December 2017 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6323248
8 December 2017 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6320851
8 November 2017 MARPOL Annex V Examination · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6303987
8 September 2017 Administrative Inspection
Administrative · Activities Europe · Activity 6262317
7 September 2017 MSP Annual Oversight · Annual Inspection · MTSA Verification
Physical examination · Activities Europe · Activity 6261459
3 September 2017 Type not recorded
No type recorded · Activities Europe · Activity 6261457
30 May 2017 Deficiency Check · In-Service Inspection · Examination of Repairs · ISM Oversight · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6160703
26 May 2017 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6156287
26 May 2017 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6280167
5 May 2017 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6174778
6 April 2017 Administrative Inspection
Administrative · Activities Europe · Activity 6120168
7 March 2017 Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6102033
22 February 2017 Underwater Inspection in lieu of Drydock · Drydock Exam · Hull Examination · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6092702
20 January 2017 Administrative Inspection
Administrative · Activities Europe · Activity 6073829
26 September 2016 Annual Inspection · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 6009360
10 April 2016 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5850680
25 February 2016 Administrative Inspection
Administrative · Activities Europe · Activity 5821661
14 January 2016 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5810156
12 January 2016 Deficiency Check
Physical examination · Activities Europe · Activity 5795636
5 January 2016 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5791484
5 January 2016 Deficiency Check · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5791826
4 January 2016 COE-Offshore
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5790174
2 January 2016 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5789849
2 January 2016 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5789854

Deficiency record · 70

01 - Certificates & Documentation › 011 - Ships Certificates › Minimum Safe Manning Document
Issued 26 July 2023 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 August 2023
Resolved 24 August 2023
Resolution: 07Aug2023: Rectified AB and OS position. 24Aug2023: rectified 3AE position.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 May 2023 Resolved
An efficient bilge pumping system shall be provided, capable of pumping from and draining any watertight compartment other than a space permanently appropriated for the carriage of fresh water, water ballast, oil fuel or liquid cargo and for which other efficient means of pumping are provided, under all practical conditions. Cargo hold bilge system inoperable due to failure of suction valve from sea chest to General Service Pump. Make repairs and test. SOLAS-04 II-1/35-1.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 12 May 2023 Resolved
The fire safety objectives of this chapter are to prevent the occurrence of fire. Complete bilge & space cleaning of accumulated oil/debris to Engine Room, Sterring Gear room, Bow Thuster space and Incinerator Room. SOLAS-09 II-2/1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 12 May 2023 Resolved
The emergency electrical power available shall be sufficient to supply all those services that are essential for safety in an emergency for a period of at least 18 hours. Fuel in EDG tank found below the 18 hour mark. Add appropriate amount of fuel to EDG tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 12 May 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. 03 cargo hold bilge alarms found damaged or in need of maintenance. Hold #1 Stbd & hold #2 fwd/port- aft/port. Conduct maintenance/repairs/test.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 12 May 2023 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids; The following functional requirements shall be met: means shall be provided to control leaks of flammable liquids and to limit the accumulation of flammable vapors. Also, provisions shall be made to prevent overpressure in any oil tank. Air and overflow pipes and relief valves shall discharge to a position where there is no risk of fire or explosion from the emergence of oils and vapor. E/R MDO drain tank is venting vapors into incinerator room through deck drain. Identifiy cause and rectify. Follow all mitigation procedures submitted to USCG Activities Europe until rectified. SOLAS-09 II-2/4.1 & 4.2.2.4 Code 17 changed to 30-days with mitigation procedures in place.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2023
Resolved 23 June 2023
Resolution: Received DNV report attesting to proper repairs.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 May 2023 Resolved
A required fixed fire detection and fire alarm system shall be of an approved type and comply with the Fire Safety Systems Code. Repair fault/damaged smoke detectors found to Loop 14 and test. SOLAS-09 II-2/7.2.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 23 June 2023
Resolution: Received DNV report attesting to proper repairs.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 May 2023 Resolved
Cargo hold spaces shall be fitted with either a fixed fire detection and fire alarm system or a sample extraction smoke detection system complying with the requirements of the Fire Safety Systems Code. Correct fault on smoke sampling fire detection system & test. SOLAS-09/19.3.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2023
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 12 May 2023 Resolved
EXTERNAL SMC AUDIT- Objective evidence from technical-related deficiencies marked as SMS Related, indicates a serious failure, or lack of effectiveness, of the implementation of the SMS. An SMS external audit focusing on preventative maintenance (deck & engineering) shall be carried out by the RO within the next 30 days. ISM Code Reg 10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 7 August 2023
Resolution: Received audit report from DNV. See attached Deficiencies Documents tab.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 May 2023 Resolved
All manually operated valves in connection with the bilge pumping arrangements shall be in positions which are accessible under ordinary circumstances. On deck bilge suction reach-rod valve handles to voids and cargo hold emergency overboards on port & Stbd found seized. Conduct repairs & maintenance. SOLAS-04 II-1/35-1.2.5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 3 July 2023
Resolution: Witnessed operation of on deck valves while on board.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2023 Resolved
No electrical equipment shall be installed in paint lockers unless such equipment is: essential for operational purposes; of a type which will not ignite the mixture concerned; appropriate to the space concerned; and appropriately certified for safe usage. Power cable junction into paint store explosion proof fan motor missing proper gasket. Tag out and repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 17 May 2023
Resolution: Received DNV survey statement that EX gasket was fitted and fan cable found in order.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2023 Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. 02 Reefer electrical boxes on deck found with water tight power cable connections corroded or improperly repaired. Also 50% of plug covers missing watertight seals.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 3 July 2023
Resolution: MI observed repairs to watertightness of reefer electrical boxes on deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 May 2023 Resolved
Auxiliary machinery essential for the safety of the ship shall be provided with effective means for its operation and control. SSDG#2 starter air solenoid valve operated starter while generator was in operation. Unknown damage to fly wheel/starting mechanism. Make repirs/test.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2023 Resolved
Every ship shall be provided with a main steering gear to the satisfaction of the Admin. Steering Gear actuator found with excessive leaking, make proper repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 12 June 2023
Resolution: Vessel rep provided video of proper operation of steering gear.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2023 Resolved
Every steam boiler shall be provided with not less than two safety valves of adequate capacity. Boiler hand relieving gear found not properly relieving. Repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 23 June 2023
Resolution: Received DNV report attesting to proper repairs.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 May 2023 Resolved
Doors fitted in boundary bulkheads between machinery spaces of category A to corridors shall be of A-60 construction, shall be reasonably gastight and self-closing. Engine Room fire door at main deck found with loss of structural integrity. Renew door. SOLAS-09 II-1/9.2.3.3.1 Table 9.5 & II-1/9.4.2.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 8 July 2023
Resolution: DNV survey statement used to clear deficiency.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 May 2023 Resolved
As far as practicable, oil fuel lines shall be arranged far apart from hot surfaces, electrical installations or other sources of ignition and shall be screened or otherwise suitably protected to avoid oil spray or oil leakage onto the sources of ignition. Incinerator fuel pump return line found leaking. Tag out until repaired. SOLAS-09 II-2/4.2.2.5.3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 23 June 2023
Resolution: Received DNV report attesting to proper repairs.
09 - Working and Living Conditions › 091 - Living Conditions › Cleanliness
Issued 12 May 2023 Resolved
Food supply and catering arrangements shall ensure the health and well-being of the crew. It shall be the duty of the master to see that the vessel is in clean and sanitary condition. Clean/sanitize galley. Replace light over cooking area. ILO-147 Convention C068 Article 1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 17 May 2023
Resolution: Received DNV report attesting to proper correction and testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2023 Resolved
In every ship means shall be provided to prevent overpressure in any part of compressed air systems. Suitable pressure relief arrangements shall be provided for all systems. Provide documentation for safety relief valve bench testing on 04 Unfired Pressure Vessels (start air x2, control air and aux engine starting air).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 17 November 2023
Resolution: Received DNV survey statement. Relief valves bench tested SAT.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 12 May 2023 Resolved
The following corroded/damaged items identified on deck and in need of maintenance: 1) Stern navigation lights j-box/plugs corroded and detaching. Make temp repairs prior to departure, then full repairs; 2) Rescue boat motor control box watertight cover hinges corroded/detached; 3) On main deck, missing dogging devices on 06 ventilation closures and 02 raised hatch covers; 4) Exterior lights at bow thruster entrance mount corroded/broken; 5) Fire hose box 21 corroded mounts detached at top; 6) Conduct maintenance (grease) on mushroom head ventilation closures and newly installed cargo hold ventilation closures; 7) Bunker station gauges on both sides over-sprayed with paint. ISM Code Reg 10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 23 June 2023
Resolution: Received DNV report attesting to proper repairs.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 12 May 2023 Resolved
The following engineering related systems found inoperable or damaged and in need of maintenance: 1) LT cooler leaks at gauges; 2) Temperature sensor for Sludge tank found cut, needs to be renewed; 3) Renew sections of exposed/damaged lagging for Steam piping; 4) Crankcase breather piping over water heaters has a leak, repair; 5) NO.1 generator oil filter is leaking; 6) Stbd E/R fire damper loungers on fiddley air actuator is leaking; 7) All 03 generators oil and fuel line gauge capillary lines are missing securing brackets; 8) Replace missing studs on MSD tank top cover; 9) 03 Salt water pumps found with missing/disconnected/inoperable gauges. ISM Code Reg 10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 3 July 2023
Resolution: DNV survey statements were utilized to clear all but item 21.2. On 03JULY, MI observed new temperature sensor installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 November 2022 Resolved
The arrangement for the storage and distribution of flammable oils employed under pressure shall be as such as to ensure the safety of the ship and persons onboard. Fuel cooling system forward of main engine rigged with hose at pressure relief valve to prevent oil from spilling on deck. 74SOLAS2009 CHII-2 Reg 4.2.4
Action required: 17 - Rectify deficiencies prior to departure
Due 23 November 2022
Resolved 28 November 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2022 Resolved
The arrangement for the storage and distribution of flammable oils employed under pressure shall be as such as to ensure the safety of the ship and persons onboard. Oil leak observed in way of high pressure pump on main diesel engine. 74SOLAS2009II-2 Reg 4.2.4
Action required: 17 - Rectify deficiencies prior to departure
Due 23 November 2022
Resolved 28 November 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 November 2022 Resolved
Measures shall be taken to ensure that the equipment is functioning in a reliable manner and routine tests to ensure continuous reliable operation. Temporary wiring and heater installed on HFO drain line. 74SOLAS2009 II-1 Reg 46.2
Action required: 17 - Rectify deficiencies prior to departure
Due 23 November 2022
Resolved 28 November 2022
Resolution: Removed. Only required during extremely cold (polar) transits.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 November 2022 Resolved
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the space being ventilated. Multiple ventilation closures found wasted. 74SOLAS2009 CHII-2 5.1.2.1.1
Action required: 17 - Rectify deficiencies prior to departure
Due 23 November 2022
Resolved 28 November 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 November 2022 Resolved
Doors for watertight integrity of internal openings shall be provided with indicators to show whether the doors are open or closed. Watertight closure indicator found tied back disabling the sensor. 74SOLS2009 CH II-1 Reg 13-1.2
Action required: 17 - Rectify deficiencies prior to departure
Due 23 November 2022
Resolved 30 November 2022
14 - Pollution Prevention › 148 - Ballast Water › Ballast water discharge
Issued 16 November 2022 Resolved
Following installation of a BWMS, the master, owner, operator, agent, or person in charge of the vessel must maintain the BWMS in accordance with all manufacturer specifications. Automatic valve to ballast water overboard not operating as designed. To be corrected next dry-dock.
Action required: 705 - Other - as specified
Due 31 March 2023
Resolved 12 May 2023
Resolution: Valve repaired in Bremerhaven, Germany.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 November 2022 Resolved
Electrical installations shall be such that maintaining the ship in normal operational condition will be ensured. Lighting at gangway found operating not as designed. 74SOLAS2009 II-1 Reg 40.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2022
Resolved 28 November 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 16 February 2022 Resolved
Guard rails or bulwarks shall be fitted around all exposed decks. Various rails and courses throughout the vessel's open decks were found to be significantly wasted/damaged and were marked for repair. All identified railings/courses are to be repaired at next dry docking. ICLL(05)25.(2)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 12 May 2023
Resolution: Conducted deck walk. All handrails repaired or in good order.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 14 February 2022 Resolved
Performance of crew members assigned fire-fighting duties shall be periodically evaluated by conducting on-board training and drills to identify areas in need of improvement, to ensure competency in fire-fighting skills is maintained, and to ensure the operational readiness of the fire-fighting organization. USCG Marine Inspectors (MIs) identified the following during fire drills conducted during annual inspection: Fire-fighters and team members assisting during dress out failed to properly don equipment. One fire-fighter donned SCBA upside down, did not use lower straps, multiple fire-fighters did not strap helmets (which fell off during drill), skin was exposed around flash hoods/collars and one flash hood was put on over the mask. During drills one SCBA bottle expelled all air for an unknown reason (investigate failure) and a second SCBA regulator abnormally squealing. Based on location of drill, a second set of fire-fighters outfits were unavailable and due to the SCBA loss of air, 01 crewmember entered into space to attack fire without a fire line or radio. Fire-fighter attempted to fight simulated fire with portable fire extinguishers unsupported. Communications with bridge were lacking. Crew shall conduct additional fire drill in the presence of USCG Marine Inspectors prior to departure. 74SOLAS14/II-2/15.2.2.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 February 2022
Resolution: Witnessed a satisfactory fire drill.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 February 2022 Resolved
Smoke detector "MD.15 BOSUN1" in the Bosun Stores failed testing. Repair/replace as necessary and conduct testing to satisfaction of attending USCG marine inspector. 74SOLAS14/II-2/7.1.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2022
Resolved 16 February 2022
Resolution: Witnessed satisfactory smoke detector test.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 February 2022 Resolved
Fixed fire detection and fire alarm systems shall be suitable for the nature of the space, fire growth potential and potential generation of smoke and gases. Smoke detector found inoperable due to the welder’s disconnect timer switch failing to reset in the engine room workshop. Second test satisfactory after adjusting disconnect switch. 74SOLAS14/II-2/7.1.1
Action required: 10 - Deficiency Rectified
Resolved 14 February 2022
Resolution: Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 14 February 2022 Resolved
A minimum of two two-way portable radiotelephone apparatus for each fire party for firefighters communication shall be carried on board. Those two-way portable radiotelephone apparatus shall be of an explosion-proof type or intrinsically safe. Ships constructed before 1 July 2014 shall comply with the requirements of this paragraph not later than the first survey after 1 July 2018. Vessel does not have any of the required radios required by this regulation. 74SOLAS14/II-2/11.10.4
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2022
Resolved 16 February 2022
Resolution: Received photos of new radios with purchase receipts.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 14 February 2022 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Rescue boat's helm was inoperable. Repair helm and demonstrate operation to attending USCG marine inspectors. 74SOLAS14/III/20.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2022
Resolved 18 February 2022
Resolution: Witnessed video of satisfactory test following repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 February 2022 Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected. Boiler Feed water piping / flange connection found with water/steam leak. 74SOLAS14/II-1/33.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2022
Resolved 16 February 2022
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 14 February 2022 Resolved
Fire protection systems and appliances shall be maintained ready for use. The manual fire alarm outside the EDG space was missing faceplate. Replace the missing faceplate. 74SOLAS14/II-2/14.1.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2022
Resolved 16 February 2022
Resolution: A new faceplate was installed and inspected as satisfactory.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 14 February 2022 Resolved
Satisfactory means for safe passage required by Regulation 25-1 (in the form of guard rails) shall be provided for the protection of the crew for spaces used in the essential operation of the ship. Railing/courses IWO aft HPU single point crane rails wasted, and Ports side mooring line storage reels wasted. Provide a temporary repair until permanent repairs may be completed. ICLL(05)25.(4)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 March 2022
Resolved 18 February 2022
Resolution: Vessel enacted temporary repairs by attaching ratchet straps around the exposed area of railing/courses.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 February 2021 Resolved
The certificates of inspection issued to US vessels, describe the vessel, the route, the minimum manning requirements, the safety equipment and appliances required to be on board, the total number of persons that may be carried, the names of the owners and operators, and the period of validity. Additionally, vessels must undergo an annual inspection within the 3 months before or after the anniversary date. Due to the extenuating circumstances, all existing information on the current COI of the SLNC MAGOTHY is certified to be true. This deficiency shall serve as approval by the US Flag to extend the due date for the annual inspection until 30APR2021 or upon entry to first U.S. port, which ever comes first. 46 CFR 2.01-5 & 46 CFR 91.27-1
Action required: 705 - Other - as specified
Due 30 April 2021
Resolved 10 May 2021
Resolution: Successful MSP Oversight Inspection completed this date by MSD Port Canaveral.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 1 July 2020 Resolved
Crew Members should be trained to be familiar with the arrangements of the ship as well as the operation of any fire-related systems. Instructions for labeling of controls for Fixed CO2 Systems was confusing and not quickly identified by crew member. Label & identify components that are necessary to operation of Fixed CO2 systems the corresponds with Instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 11 August 2020
Resolution: Pictures emailed with instructions, crew training and valves labled for CO2 system
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 1 July 2020 Resolved
Means for securing & maintaining weather tightness shall be to the satisfaction of administration. Cotter pins for multiple dogs & hinges on main deck were missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 11 August 2020
Resolution: Pins installed in 6 hatches.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 July 2020 Resolved
Auxiliary steering system shall be capable of moving rudder from 15 degrees on one side to 15 degrees on the other side. No.1 steering pump auxiliary controller switch broke during testing. Replace and show proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 4 September 2020
Resolution: Replaced switch tested found Sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 July 2020 Resolved
All electrical apparatus should be constructed and installed as not to cause injury while touched in a normal manner. STBD Ballast water system Ectomesh System missing covering.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 11 August 2020
Resolution: Cover installed over electrical components.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 1 July 2020 Resolved
Auxiliary steering system shall be capable of moving rudder from 15 degrees on one side to 15 degrees on the other side. No.1 steering pump auxiliary controller switch broke during testing. Replace and show proper operation.
Action required: 10 - Deficiency Rectified
Due 10 August 2020
Resolved 10 August 2020
Resolution: Corrected on Spot
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 February 2020 Resolved
The machinery shall be of a design and construction adequate for its intended service. Vessel experienced loss of power and loss of propulsion due to computer program failure in automation system. DNV-GL to make assessment and certify proper operation of subject machinery prior to getting underway from current port.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2020
Resolved 29 February 2020
Resolution: Received DNV-GL report attesting to proper operation of generators and automation.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 30 December 2019 Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution, and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. The number 2 diesel oil storage tank was found with an approximate 200 mm long by 1 mm wide vertical fracture at frame 14. The fracture is located approximately 1.4 meters above the bottom of the tank on the inboard side of the tank. Make permanent repairs to the number 2 diesel oil tank prior to storing diesel oil inside the tank and contact the nearest USCG OCMI for an examination of repairs when repairs are ready to be completed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 January 2020
Resolved 16 January 2020
Resolution: Vessel made permanent repairs to number 2 diesel tank. Repairs were attested to by class DNV GL by remote survey and verified during ISM audit conducted 16JAN2020 at Port Hueneme. Attending USCG marien inspector verified on board.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 18 September 2019 Resolved
Fire protection systems and firefighting systems and appliances shall be maintained ready for use. Engine room and emergency generator ventilation louvers do not properly close. Demonstrate proper operation of all louvers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2019
Resolution: Adjustments were made to ventilation louvers. Witnessed operation of EDG/Machinery space louvers.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 September 2019 Resolved
The company should establish procedures for key shipboard operations concerning the safety of personnel. The ballast water control system is not operational and not properly locked out/tagged out.
Action required: 10 - Deficiency Rectified
Resolved 18 September 2019
Resolution: System was locked out/tagged out.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 September 2019 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. The CO2 vent fan is not operable. Demonstrate proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 September 2019
Resolution: Witnessed operation of CO2 space vent fan.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 September 2019 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. The #1 diesel oil service tank level indicator (gauge) is inoperable. Repair or replace gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2019
Resolved 27 October 2019
Resolution: A new TLI gauge was purchased and installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 September 2019 Resolved
Terminations in all conductors shall be so made as to retain the original properties of the cable. The wires for the flame detector above the #1 generator are exposed. Properly secure the wires.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 September 2019
Resolution: The flame detector wires were secured in a juntion box.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 18 September 2019 Resolved
Electrical installations shall be such that the safety of crew from electrical hazards will be ensured. Old batteries are currently stored in the emergency generator room. Remove all excess batteries.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 September 2019
Resolution: Batteries were removed from the vessel.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 18 September 2019 Resolved
Stairways and lift trucks which penetrate more than a single deck shall be protected by self closing doors. 3 self closing doors did not completely close.
Action required: 10 - Deficiency Rectified
Resolved 18 September 2019
Resolution: Closure devices were adjusted so the doors closed properly prior to departing the vessel.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 10 October 2018 Resolved
Light switches thru out crew quarters were found to be either inoperable or in a faulty condition posing an electrical hazard to crew members.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 October 2018
Resolved 18 November 2018
Resolution: Replace light
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 10 October 2018 Resolved
Proper sanitary facilities/showers shall be provided in all crew staterooms.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 October 2018
Resolved 18 November 2018
Resolution: Replaced Shower head
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 10 October 2018 Resolved
All embarkation lights IWO life saving stations shall be made operable locally and switches properly mounted where needed.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 October 2018
Resolved 18 November 2018
Resolution: Replaced Lights
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 10 October 2018 Resolved
Excessive oil accumulations were found thru out engine room bilges.
Action required: 10 - Deficiency Rectified
Due 10 October 2018
Resolved 18 November 2018
Resolution: Replaced leaking oil pump and cleaned engine room bilges
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 October 2018 Resolved
Main engine found to be leaking steady stream of fuel while running on diesel and significant lube oil leaks IWO fwd engine seals were noted causing accumulations of oil in bilges.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 October 2018
Resolved 18 November 2018
Resolution: repalced F/O & Lube oil pumps
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 October 2018 Resolved
A-class fire door between engine room and steering compartment found to be damaged and not closing properly.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 October 2018
Resolved 18 November 2018
Resolution: Replaced self closeing device engine room door
Documentation › Logs/Records › Garbage Recordkeeping
Issued 8 November 2017 Resolved
Failure to maintain an accurate record log book. Please provide proof of remedial training and extend of audit results.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 December 2017
Resolved 21 November 2017
Resolution: Recieved copy of corrective action from vessel representative. Vessel has conducted training on documentation procedures and has completed an audit to the same.
Engineering › Diesel Engine (propulsion-direct drive) › Valve Actuating Gear
Issued 8 September 2017 Resolved
Rocker arm bolt on #4 cylinder broke. Provide signed report of repair attesting to the renewal of the bolt and satisfactory engine operation.
Condition: Improper Installation
Due 20 February 2018
Resolved 17 February 2018
Resolution: Rcvd DNV-GL survey statement and service report from Motor Services [name withheld] attesting to the satisfactory replacement of rocker arm bolt and operation of engine.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 6 October 2016 Resolved
Vessels NS5 system was OOC and vessel did not have a secondary means to record machinery maintenance.
Action required: 705 - Other - as specified
Due 6 November 2016
Resolved 20 October 2016
Resolution: Vessel provided a spread sheet where the are now keeping track of engine related maintenance.
Engineering › Steering Gear System › Ram Seal
Issued 6 October 2016 Resolved
Rams seal are currently leaking during operation
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 15 November 2016
Resolution: Vessel provided a class report attesting to the repairs to the steering gear.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 October 2016 Resolved
Replace cover on LT cooling Temp regulating vlalve.
Action required: 705 - Other - as specified
Due 6 November 2016
Resolved 3 November 2016
Resolution: Vessel replaced cover on LT regulating valve.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 6 October 2016 Resolved
Repair FWD mast head light and port running light.
Action required: 705 - Other - as specified
Due 6 November 2016
Resolved 20 October 2016
Resolution: Vessel repaired lights.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 6 October 2016 Resolved
Repair bracket for ring buoy light.
Action required: 705 - Other - as specified
Due 13 November 2016
Resolved 20 October 2016
Resolution: Vessel repaired bracket.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 6 October 2016 Resolved
Repair hydraulic leak in fwd crane.
Action required: 705 - Other - as specified
Due 6 November 2016
Resolved 20 October 2016
Resolution: Vessel repaired leak.
Electrical › Electric Generation Source (service) › Generator
Issued 25 February 2016 Resolved
#2 SSDG shutdown during normal operation. Troubleshot by manufacture service tech led to #9 bearing within generator. Require proper repair and full operational test report from class surveyor.
Action required: 705 - Other - as specified
Due 4 March 2016
Resolved 5 March 2016
Resolution: Completed repairs and testing to satisfaction of class.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 5 January 2016 Resolved
The OWS on the vsl in not operational, there is no record of running the OWS dated back to July 26, 2015 in the ORB. Make repairs to the OWS and prove operational test
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 January 2016
Resolution: The OWS was test run and proper operation was observed.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 5 January 2016 Resolved
The oil content meter (OCM) must have a current calibration certificate. The current OCM certificate expired July 14, 2010. Provide current calibrated OCM or have current one calibrated.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 January 2016
Resolution: A new OCM with current calibration certificate was properly installed.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 5 January 2016 Resolved
During review of bunker delivery notes, samples, and change over procedures it was noted that DMA of .46% was received on 30SEP15 and on 17AUG15 Fuel (gasoil) having a .33% content was refused. Provide written acceptance procedures per SMS in regards to when to accept/decline low sulfur fuel for use in ECA.
Action required: 705 - Other - as specified
Due 5 February 2016
Resolved 13 January 2016
Resolution: Proper documentation received and reviewed.

Casualty record · 9

3 September 2017Routine · role: Involved in a Marine Casualty · activity 6261457
14 December 2017Routine · role: Involved in a Marine Casualty · activity 6325792
16 August 2018Routine · role: Involved in a Marine Casualty · activity 6514631
18 September 2018Routine · role: Involved in a Marine Casualty · activity 6552114
19 October 2019Routine · role: Involved in a Marine Casualty · activity 6844458
24 April 2022Routine · role: Involved in a Marine Casualty · activity 7444315
30 May 2022Routine · role: Involved in a Marine Casualty · activity 7529523
12 November 2022Routine · role: Involved in a Marine Casualty · activity 7859238
21 July 2023Routine · role: Involved in a Marine Casualty · activity 7764547
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

NORFOLK (2017–2019). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.