← All vessels
KIKYO
KIKYO is a 2010 tank ship. The Coast Guard has recorded 8 inspections since 2016, most recently in August 2024, along with 2 deficiencies and 1 operational control.
Records from 2016 to 2024. Most recent: operational control imposed, 30 August 2024.
- Built
- 2010
- Last inspected
- 30 August 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9415703 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
VRGR7
1106942
Flag
PANAMA
—
Maury page id
psix-1106942
Inspections, by type
The 8 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it47005 - Convention (Subpart B), Gross Ton
58811 - Dead Weight, Ton
77549 - Displacement, Ton
17449 - Convention (Subpart B), Net Ton
47005 - Regulatory (Subpart C or D), Gross Ton
17449 - Regulatory (Subpart C or D), Net Ton
58811 - Dead Weight, Ton
77549 - Displacement, Ton
17449 - Convention (Subpart B), Net Ton
47005 - Regulatory (Subpart C or D), Gross Ton
17449 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 8
30 August 2024
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7993501
26 March 2024
COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7877117
3 January 2023
COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7610487
1 January 2022
COC-GAS Renew · Administrative Inspection · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7375875
8 January 2021
PSC B · COC-GAS Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7116956
1 January 2020
ISPS II Exam · COC-GAS Renew · Deficiency Check · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6880630
26 July 2018
COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6484645
12 January 2016
COC-GAS Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5795767
Deficiency record · 2
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 January 2020
Resolved
Pressure relief valves should be set and sealed by a competent authority acceptable to the administration and a record of this action , including the valves of set pressure should be retained onboard.
During the cargo deck examination the PSCO observed the seals on the Maximum Allowable relief valves had been changed. The vessel has no documentation reflecting why or when the seals were changed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 26 July 2018
Resolved
01 1138- The condition of the ship and its equipment should be maintained to conform with the provisions of the Code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons onboard. Temporary repair identified on Cargo Reliquifaction plant #1 liquid cargo receiver(16-20 Bar relief valve pressure). Chief engineer explained as a hairline crack where pressure relief piping is welded to the receiver. 74SOLAS(04 CONS) VII/13 IGC Code (93) 1.5.3.1
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National