Records from 2017 to 2022. Most recent: inspection, 24 October 2022.
Inspection history · 6
24 October 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7582855
3 May 2022
PSC B · COC-GAS Annual · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7432491
16 March 2021
PSC B · COC-GAS Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7150333
22 November 2019
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6860905
4 October 2019
COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6821555
27 October 2017
COC-GAS Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6291489
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 May 2022
Resolved
In enclosed or semi-enclosed spaces having a direct opening into any gas-dangerous space or zone there should be installed electrical installations complying with the requirements for the space or zone to which the opening leads. PSCOs identified 04 explosion-proof rated sensors to be missing the corresponding explosion-proof blank plugs - inside the cargo compressor room.
Cite: 74SOLAS(20) VII/13.1 - IGC(93) 10.2.5.1
Action Taken: Cargo restricted (34ac) until deficiency is rectified on COC. PSC Form B: 17ac.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 May 2022
Resolution: Received satisfactory class society documentation attesting to the proper installation of 04 EX-proof rated plugs in the Cargo Compressor Room. Vessel is cleared to commence cargo operations and Prior to Departure Form B action code is cleared.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 May 2022
Resolved
Nozzles shall be of an approved dual-purpose type (i.e. spray/jet type) incorporating a shutoff. PSCO observed the nozzle at the port-side bridge wing was not functioning properly and could not switch between spray and jet.
Cite: 74SOLAS(20) II-2/10.2.3.3.4.
Action Taken: 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 3 May 2022
Resolved 3 May 2022
Resolution: Rectified during exam.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 3 May 2022
Resolved
In the case of products which are toxic, the Administration may authorize the use of portable equipment for detection of toxic products as an alternative to a permanently installed toxicity sensor/system. Vessel did not have a permanently installed toxicity sensor or applicable portable meter capable of measuring ammonia concentrations.
Cite: 74SOLAS(20) VII/13.1 - IGC(93) 13.6.9
Action Taken: 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 October 2022
Resolution: VESSEL PROVIDED CLASS SURVEY STATEMENT ATTESTING TO THE PROPER EQUIPMENT BEING RECEIVED ON BOARD.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 May 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present conventions/regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCOs identified cable rigging for Mast Riser #03 to be substantially wasted.
Action required: 10 - Deficiency Rectified
Due 3 May 2022
Resolved 3 May 2022
Resolution: Replaced cable rigging for Mast Riser #03
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 4 October 2019
Resolved
Pressure relief valves should be set and sealed by a competent authority acceptable to the Administration.
Seals on pressure relief valves were broken or missing on all cargo tanks. Rectify prior to conducting cargo operations.
74 SOLAS (14) VII/13.1, IGC (1993) 8.2.5 (Code 17ac)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 October 2019
Resolved 5 October 2019
Resolution: Recieved Class Report from KR attesting to the replacement of all cargo tank pressure relief valve seals.
01 - Certificates & Documentation › 011 - Ships Certificates › Liquefied Gases in Bulk (ICoF/IGC Code)
Issued 4 October 2019
Resolved
Unless expressly provided otherwise, the Code applies to ships the keels of which are laid on or after 01OCT1994.
Ships International Certificate of Fitness does not reflect compliance with MSC.30(61) or other applicable amendments.
74 SOLAS (14) VII/13.1, IGC (1993) 1.1.2 (Code 16ac)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2019
Resolved 22 November 2019
Resolution: Received Class Report attesting validity of questioned certificate. No further action required.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 4 October 2019
Resolved
Fire extinguishers shall be situated ready for use at easily visible places, and in such a way that their serviceability is not impaired by the weather, vibration, or other external factors.
Fire extinguishers in lifeboats were not properly mounted.
74 SOLAS (2004) II-2/10.3.2.4 (Code 16c)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2019
Resolved 5 October 2019
Resolution: Extinguishers mounted properly
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2019
Resolved
Electrical equipment which is not certified safe type in spaces protected by airlocks should be de-energized upon loss of overpressure.
Pressure differential switch for motor room was blocked by a foreign object. 74 SOLAS (14) VII/13.1, IGC (1993) 3.6.4
(Code 10c)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 October 2019
Resolved 4 October 2019
Resolution: Deficiency corrected on the spot.