GREEN ONE is a tank ship. The Coast Guard has recorded 10 inspections since 2019, most recently in September 2025, along with 20 deficiencies and 2 operational controls.

Records from 2019 to 2025. Most recent: inspection, 25 September 2025.

Built
Not recorded
Last inspected
25 September 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 25 September 2025
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 4 calendar years (2019–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9336660
1107934
Flag
REPUBLIC OF KOREA
Maury page id
psix-1107934

Documentation record

Tonnage as PSIX records it25937 - Convention (Subpart B), Gross Ton
25937 - Regulatory (Subpart C or D), Gross Ton
29536 - Dead Weight, Ton
41173 - Displacement, Ton
7782 - Convention (Subpart B), Net Ton
7782 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 10

25 September 2025 Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8241752
26 August 2025 PSC A · Deficiency Check · COC-GAS Renew
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8209030
2 October 2024 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8013641
18 August 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7985400
15 August 2024 Ballast Water Examination · COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7981729
3 November 2020 PSC B · COC-GAS Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7088745
22 December 2019 Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6878978
20 December 2019 In-Service Inspection
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6877131
1 November 2019 Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7082902
11 October 2019 ISPS II Exam · COC-GAS Renew · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6828394

Deficiency record · 20

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 31 August 2025 Resolved
Cargo tank liquid level gauge of the closed type as required by column g in the table of chapter 19 for Anhydrous Ammonia shall be a closed device that keep the cargo from being released. PSCO observed a crew member's NH3 detector go off while manually activating the high level float switch alarm on the port side cargo deck tank. 74SOLAS(20) VII 13.1/IGC 13.2.2.3 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 September 2025
Resolution: No. 2 Deck tank closed gauging device teflon gasket replaced and leak tested satifactory with portable NH3 meter. Class report attested.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 31 August 2025 Resolved
Personnel involved in cargo operations should be adequately trained in handing procedures. PSCO observed crew's lack of ability to test fixed gas sampling system. 74Solas(20) VII 13.1/IGC 18.3 40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 September 2025
Resolution: Shipboard fixed gas detection instructions and training procedures updated to ensure crew familiarity with system. Zone 2 ACC Space External sampling point solenoids and connectors replaced and tested saisfactory. Class attestation received.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 26 August 2025 Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements, which may be established by the company. Objective evidence discovered during an expanded ISM exam revealed the following non-conformity: Due to the number and nature of deficiencies identified during the exam, it was determined the vessel failed to fully implement the requirements of the ISM code. PSCO found a systemic break down of the vessels SMS including master and crew's unfamiliarity with the vessel's maintenance procedures for testing fixed gas detection, failure to maintain life saving equipment, failure to prevent crew exposure to toxic gases, failure to maintain gas dangerous areas including compressor room and air lock. A safety management external audit carried out by the administration or the RO, with a corresponding report of findings satisfactory to the OCMI must be submitted prior to clearance of this deficiency and release from detention. 74 SOLAS(20)IX/3.1 ISM A/10.1 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 31 August 2025
Resolution: Vessel Operator updated SMS procedures for fixed gas detection testing onboard. Corrections made to all other ISM related deficiencies. Class Survey and ISM Audit completed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 August 2025 Resolved
Cargo tank liquid level gauge of the closed type as required by column g in the table of chapter 19 for Anhydrous Ammonia shall be a closed device that keep the cargo from being released. PSCO observed a crew member's NH3 detector go off while manually activating the high level float switch alarm on the port side cargo deck tank. 74SOLAS(20) VII 13.1/IGC 13.2.2.3 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 31 August 2025
Resolution: Deficiency changed to 40ac.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 26 August 2025 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed seized shackles on embarkation ladder, preventing it from being ready for immediate use. 74 SOLAS(20) III/20.2 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel replaced shackles and company ordered 3 embarkation ladders.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 August 2025 Resolved
The doors should be self-closing and without any holding back arrangements. PSCO observed a broken closure device impeding the door from self closing. 74Solas(20) VII13.1/IGC 3.6.2 30ac
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel replaced closing device allowing for proper closure.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 26 August 2025 Resolved
The condition of the ship and its equipment should be maintained to conform with the provisions of the Code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons on board or without presenting unreasonable threat of harm to the marine environment. PSCO observed the filling of the testing device and storage of filled gas bladder, NH3, in an acommadation space. 74SOLAS(2) VII/13.1 - IGC 1.5.3.1 30ac
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel changed procedures to prevent this hazard in accomodation spaces. NH3 span gas and sample bag will be stored in the Deck Store.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 26 August 2025 Resolved
The condition of the ship and its equipment should be maintained to conform with the provisions of the Code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons on board or without presenting unreasonable threat of harm to the marine environment. PSCO observed the gas detection sampling cabinet in the cargo control room not gas tight with multiple holes on the side of the cabinet. 74Solas(20) VII 13.1/IGC 1.5.3.1 30ac
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel installed proper gland fitting to maintain proper seal on fixed gas sampling cabinet.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 26 August 2025 Resolved
Personnel involved in cargo operations should be adequately trained in handing procedures. PSCO observed crew's lack of ability to test fixed gas sampling system. 74Solas(20) VII 13.1/IGC 18.3 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 31 August 2025
Resolution: Deficiency changed to 40ac.
02 - Structural Conditions › N/A - No Subsystem › Safe access to tanker bows
Issued 26 August 2025 Resolved
Every tanker constructed on or after 1 July 1998 shall be provided with the means to enable the crew to gain safe access to the bow even in sever weather conditions. PSCO observed the stowage of miscellaneous equipment and gear in way of the safe access to the bow. 74SOLAS(04) II-1/3-3.2 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2025
Resolution: Shelters cleared of obstructions.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 26 August 2025 Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed visible light around the port and starboard compressor room water tight door while it was closed. 74SOLAS(04) II-l/3-1 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2025
Resolution: Adjustments made to correct closure of doors.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 August 2025 Resolved
Boundaries of superstructures and deck houses normally manned,cargo compressor rooms, cargo pump-rooms, store-rooms containing high fire risk items and cargo control rooms, all facing the cargo area. Boundaries of unmanned forecastle structures not containing high fire risk items or equipment do not require water-spray protection. PSCO observed 05 deck water spray nozzles on the forecastle clogged and not spraying water as intended. 74SOLAS(20)VII/13.1 IGC 11.3.1.4 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2025
Resolution: Deck water spray re-tested satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 August 2025 Resolved
Intrinsically safe electrical equipment and wiring may be fitted in all gas-dangerous spaces and zones as defined in 1.3.17. PSCO observed a wasted electrical junction box on the # 2 compressor in the compressor room. 74Solas(20) VII/13.1/IGC (93) 10.2.1 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 28 August 2025
Resolution: Satisfactory repair conducted on junction boxes.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 August 2025 Resolved
Electrical equipment within spaces protected by air locks should be of the certified safe type unless arranged to be de-energized by measures required by 3.6.4. PSCO observed a damaged electrical component including dead end wiring and loose packing glands in the motor room. 74Solas(20) VII/IGC (93) 13.1 50ac
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 August 2025
Resolution: Wiring removed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 August 2025 Resolved
Override arrangement, whenever necessary, to prevent its normal operation. This arrangement should include fusible elements designed to melt at temperatures between 9B°C and 104 °C and to cause relief valves specified in 8.3.1.1 to become operable. PSCO observed multiple fusible links covered by canvas bags at all 03 cargo tank tops. 74Solas(20) VII/13.1/IGC (93) 8.3.1.2 10c
Action required: 10 - Deficiency Rectified
Resolved 26 August 2025
Resolution: Canvas bags were removed during exam to permit normal operation of the fusible links.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 18 August 2024 Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this section. Subject vessel, of keel laid date 19DEC2006 and ballast water capacity of 12272 m3, is past its compliance date per the implementation schedule in 33 CFR 151.2035 (b). Currently, vessel’s installed BWTS is inoperative. Vessel is not authorized to discharge untreated ballast into the waters of the U.S. without prior written authorization from the local Captain of the Port under the provisions of 33 CFR 151.2040 (b). 33CFR151.2035
Action required: 15 - Rectify deficiencies by next port
Resolved 2 October 2024
Resolution: Vessel repaired inoperable BWTS and sent in final report of repairs.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 15 August 2024 Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products. PSCO observed approximately 06 explosion proof light fixtures on the cargo deck, exterior of compressor room, motor room, and forward superstucture. 74SOLAS(14) VII/12 IGC(93) 10.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 November 2020 Resolved
Air lock doors are required to be self closing. The outer door does not close. Mechanism (that provides self closing) is inoperative. '74 SOLAS (14) VII/12 - - IGC('93) 3.6.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2020
Resolution: Received class report. Self closing mechanism repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 November 2020 Resolved
Where electrical equipment is installed in gas dangerous spaces it should be to the satisfaction of the administration for operation in the flammable atmosphere concerned. Multiple electrical devices had exposed wiring in the compressor room. Glycol temperature sensors, for example. '74 SOLAS (14) VII/12 - - IGC('93) 10.1.5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2020
Resolution: Class survey received. Exposed wires in compressor room repaired.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 3 November 2020 Resolved
Gas detection suitable to the administration is to be installed. Manufacturer manual states (that) steel cabinet to not have ventilation fans installed and must be reasonably gas tight. Fan installed with extension cord and holes drilled for ventilation. '74 SOLAS (14) VII/12 - - IGC('93) 3.6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2020
Resolution: Class survey received. Gas cabinet made reasonably gas tight.