Records from 2019 to 2025. Most recent: inspection, 25 September 2025.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 31 August 2025
Resolved
Cargo tank liquid level gauge of the closed type as required by column g in the table of chapter 19 for Anhydrous Ammonia shall be a closed device that keep the cargo from being released. PSCO observed a crew member's NH3 detector go off while manually activating the high level float switch alarm on the port side cargo deck tank.
74SOLAS(20) VII 13.1/IGC 13.2.2.3
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 September 2025
Resolution: No. 2 Deck tank closed gauging device teflon gasket replaced and leak tested satifactory with portable NH3 meter. Class report attested.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 31 August 2025
Resolved
Personnel involved in cargo operations should be adequately trained in handing procedures. PSCO observed crew's lack of ability to test fixed gas sampling system.
74Solas(20) VII 13.1/IGC 18.3
40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 September 2025
Resolution: Shipboard fixed gas detection instructions and training procedures updated to ensure crew familiarity with system. Zone 2 ACC Space External sampling point solenoids and connectors replaced and tested saisfactory. Class attestation received.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 26 August 2025
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements, which may be established by the company. Objective evidence discovered during an expanded ISM exam revealed the following non-conformity: Due to the number and nature of deficiencies identified during the exam, it was determined the vessel failed to fully implement the requirements of the ISM code. PSCO found a systemic break down of the vessels SMS including master and crew's unfamiliarity with the vessel's maintenance procedures for testing fixed gas detection, failure to maintain life saving equipment, failure to prevent crew exposure to toxic gases, failure to maintain gas dangerous areas including compressor room and air lock. A safety management external audit carried out by the administration or the RO, with a corresponding report of findings satisfactory to the OCMI must be submitted prior to clearance of this deficiency and release from detention.
74 SOLAS(20)IX/3.1 ISM A/10.1
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 31 August 2025
Resolution: Vessel Operator updated SMS procedures for fixed gas detection testing onboard. Corrections made to all other ISM related deficiencies. Class Survey and ISM Audit completed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 August 2025
Resolved
Cargo tank liquid level gauge of the closed type as required by column g in the table of chapter 19 for Anhydrous Ammonia shall be a closed device that keep the cargo from being released. PSCO observed a crew member's NH3 detector go off while manually activating the high level float switch alarm on the port side cargo deck tank.
74SOLAS(20) VII 13.1/IGC 13.2.2.3
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 31 August 2025
Resolution: Deficiency changed to 40ac.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 26 August 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed seized shackles on embarkation ladder, preventing it from being ready for immediate use.
74 SOLAS(20) III/20.2
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel replaced shackles and company ordered 3 embarkation ladders.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 August 2025
Resolved
The doors should be self-closing and without any holding back arrangements. PSCO observed a broken closure device impeding the door from self closing.
74Solas(20) VII13.1/IGC 3.6.2
30ac
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel replaced closing device allowing for proper closure.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 26 August 2025
Resolved
The condition of the ship and its equipment should be maintained to conform with the provisions of the Code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons on board or without presenting unreasonable threat of harm to the marine environment. PSCO observed the filling of the testing device and storage of filled gas bladder, NH3, in an acommadation space. 74SOLAS(2) VII/13.1 - IGC 1.5.3.1
30ac
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel changed procedures to prevent this hazard in accomodation spaces. NH3 span gas and sample bag will be stored in the Deck Store.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 26 August 2025
Resolved
The condition of the ship and its equipment should be maintained to conform with the provisions of the Code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons on board or without presenting unreasonable threat of harm to the marine environment. PSCO observed the gas detection sampling cabinet in the cargo control room not gas tight with multiple holes on the side of the cabinet.
74Solas(20) VII 13.1/IGC 1.5.3.1
30ac
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 28 August 2025
Resolution: Vessel installed proper gland fitting to maintain proper seal on fixed gas sampling cabinet.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 26 August 2025
Resolved
Personnel involved in cargo operations should be adequately trained in handing procedures. PSCO observed crew's lack of ability to test fixed gas sampling system.
74Solas(20) VII 13.1/IGC 18.3
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 31 August 2025
Resolution: Deficiency changed to 40ac.
02 - Structural Conditions › N/A - No Subsystem › Safe access to tanker bows
Issued 26 August 2025
Resolved
Every tanker constructed on or after 1 July 1998 shall be provided with the means to enable the crew to gain safe access to the bow even in sever weather conditions. PSCO observed the stowage of miscellaneous equipment and gear in way of the safe access to the bow.
74SOLAS(04) II-1/3-3.2
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2025
Resolution: Shelters cleared of obstructions.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 26 August 2025
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed visible light around the port and starboard compressor room water tight door while it was closed.
74SOLAS(04) II-l/3-1
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2025
Resolution: Adjustments made to correct closure of doors.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 August 2025
Resolved
Boundaries of superstructures and deck houses normally manned,cargo compressor rooms, cargo pump-rooms, store-rooms containing high fire risk items and cargo control rooms, all facing the cargo area. Boundaries of unmanned forecastle structures not containing high fire risk items or equipment do not require water-spray protection. PSCO observed 05 deck water spray nozzles on the forecastle clogged and not spraying water as intended.
74SOLAS(20)VII/13.1 IGC 11.3.1.4
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2025
Resolution: Deck water spray re-tested satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 August 2025
Resolved
Intrinsically safe electrical equipment and wiring may be fitted in all gas-dangerous spaces and zones as defined in 1.3.17. PSCO observed a wasted electrical junction box on the # 2 compressor in the compressor room.
74Solas(20) VII/13.1/IGC (93) 10.2.1
50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 28 August 2025
Resolution: Satisfactory repair conducted on junction boxes.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 August 2025
Resolved
Electrical equipment within spaces protected by air locks should be of the certified safe type unless arranged to be de-energized by measures required by 3.6.4. PSCO observed a damaged electrical component including dead end wiring and loose packing glands in the motor room.
74Solas(20) VII/IGC (93) 13.1
50ac
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 August 2025
Resolution: Wiring removed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 August 2025
Resolved
Override arrangement, whenever necessary, to prevent its normal operation. This arrangement should include fusible elements designed to melt at temperatures between 9B°C and 104 °C and to cause relief valves specified in 8.3.1.1 to become operable. PSCO observed multiple fusible links covered by canvas bags at all 03 cargo tank tops.
74Solas(20) VII/13.1/IGC (93) 8.3.1.2
10c
Action required: 10 - Deficiency Rectified
Resolved 26 August 2025
Resolution: Canvas bags were removed during exam to permit normal operation of the fusible links.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 18 August 2024
Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this section.
Subject vessel, of keel laid date 19DEC2006 and ballast water capacity of 12272 m3, is past its compliance date per the implementation schedule in 33 CFR 151.2035 (b).
Currently, vessel’s installed BWTS is inoperative. Vessel is not authorized to discharge untreated ballast into the waters of the U.S. without prior written authorization from the local Captain of the Port under the provisions of 33 CFR 151.2040 (b).
33CFR151.2035
Action required: 15 - Rectify deficiencies by next port
Resolved 2 October 2024
Resolution: Vessel repaired inoperable BWTS and sent in final report of repairs.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 15 August 2024
Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products.
PSCO observed approximately 06 explosion proof light fixtures on the cargo deck, exterior of compressor room, motor room, and forward superstucture.
74SOLAS(14) VII/12
IGC(93) 10.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 November 2020
Resolved
Air lock doors are required to be self closing. The outer door does not close. Mechanism (that provides self closing) is inoperative.
'74 SOLAS (14) VII/12 - - IGC('93) 3.6.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2020
Resolution: Received class report. Self closing mechanism repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 November 2020
Resolved
Where electrical equipment is installed in gas dangerous spaces it should be to the satisfaction of the administration for operation in the flammable atmosphere concerned. Multiple electrical devices had exposed wiring in the compressor room. Glycol temperature sensors, for example.
'74 SOLAS (14) VII/12 - - IGC('93) 10.1.5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2020
Resolution: Class survey received. Exposed wires in compressor room repaired.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 3 November 2020
Resolved
Gas detection suitable to the administration is to be installed. Manufacturer manual states (that) steel cabinet to not have ventilation fans installed and must be reasonably gas tight. Fan installed with extension cord and holes drilled for ventilation.
'74 SOLAS (14) VII/12 - - IGC('93) 3.6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2020
Resolution: Class survey received. Gas cabinet made reasonably gas tight.