Records in 2011. Most recent: inspection, 22 February 2011.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Documentation › Safety/Response Plans/Programs › Ballast Water Management Plan
Issued 2 March 2011
No resolution recorded
Ballast Water Mngmnt Plan that has been developed specifically to allow those responsible to follow its strategy. 33 CFR 151.2035(7) 70a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 22 February 2011
Resolved
Lifebuoy self igniting lights shall be capable of burning continuously. Lifebuoy lights on main deck are inoperable. SOLAS09/III/7.1.3 , LSA 2010 CH III/2.1.2.2 10c
Action required: 17 - Rectify deficiencies prior to departure
Due 2 March 2011
Resolved 2 March 2011
Resolution: Corrected to satisfaction of Marine Inspector.
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 22 February 2011
No resolution recorded
Audible and visual alarm shal be given on the bridge in the event of electrical failure. Steering alarms were inoperable on bridge. SOLAS 09 II-1/29.8.4 70a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Lifesaving › Launching Appliances › Davit
Issued 22 February 2011
No resolution recorded
Where Davit arms are recovered by Power, Safety devices shall be fitted to automatically cut off Power . No limit switch provided for Rescue Boat Davil. LSA 2010 CHVI/1.2.7 70a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Fire Fighting › Fire Hydrants › Material
Issued 22 February 2011
No resolution recorded
Necessary fittings and tools shall be kept ready for use near the connections. Numerous fire stations did not have spanner wrenches. SOLAS 09/II-2/10.2.3.1.1 70a/c
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Fire Fighting › Self-contained Breathing Apparatus › Valve
Issued 22 February 2011
No resolution recorded
Fire protection appliances shall be maintained ready for use. SCBA bottle Bracket holding connection broke during drill. SOLAS09/II-2/14.1 70a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 22 February 2011
No resolution recorded
Vessel shall have NTVRP approval page with Plan. 33USC 1327 70c
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign