Records from 2016 to 2025. Most recent: inspection, 26 August 2025.
Inspection history · 17
26 August 2025
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8218479
13 July 2023
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7742259
20 June 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7482229
13 June 2022
Administrative Inspection · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7478164
12 October 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7331774
21 April 2021
MTSA Verification · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7107849
25 March 2019
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6648952
12 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6600175
28 February 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6360682
25 January 2018
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6352464
21 September 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6272063
31 July 2017
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6226491
30 March 2017
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6114671
17 January 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6077229
21 February 2016
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5819135
26 January 2016
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5803782
5 January 2016
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5791485
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 25 March 2019
Resolved
The following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source..embarkation stations with all watertight doors and fire doors closed. Embarkation ladder on the south platform has no lighting for personnel and needs sufficient lighting for egress. Rectify within 60 days. 46CFR 112.15-1(c)
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 May 2019
Resolved 29 April 2019
Resolution: Contacted by the OIM and one emergency light has been installed providing adequate illumination to the area. Additional lighting will be installed on a new branch circuit after engineering review.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 28 February 2018
Resolved
Each panel board must have a circuit directory that has the rating or setting of the overcurrent devices for each circuit. Update all panels w/ampacity for the designated circuit. 46CFR 111.40-11 (2)(iii). By 27Mar18.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2018
Resolved 6 March 2018
Resolution: Documented evidence from Port Engineer.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 28 February 2018
Resolved
MOM rev. 3 USCG approval, and rev. 2 ABS approval is onboard. Actual document is rev. 0. Provide the latest approved revision and approval reconciliation for same. 46CFR 109.121. By 27Mar18.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2018
Resolved 5 March 2018
Resolution: Port Engineer provided documentation.