Records from 2010 to 2011. Most recent: inspection, 17 February 2011.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Communications › Radio Communications › EPIRB
Issued 17 February 2011
Resolved
Found EPIRB registered under old name re-register EPIRB to reflect name change.
Action required: 15 - Rectify deficiencies by next port
Resolved 21 September 2011
Resolution: Deficiency Corrected.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 17 February 2011
Resolved
Found vessel with installed toilet with no installed Type II or Type III holding tank. Provide type certified II or type III MSD holding tank.
Action required: 15 - Rectify deficiencies by next port
Resolved 10 April 2012
Resolution: Deficiency Corrected.
Documentation › Markings/Placards › Garbage Placard
Issued 17 February 2011
Resolved
Provide and post garbage placards in common areas
Action required: 15 - Rectify deficiencies by next port
Resolved 17 February 2011
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 17 February 2011
Resolved
Provide a standard discharge connection to offload oily wastes
Action required: 15 - Rectify deficiencies by next port
Resolved 9 September 2011
Resolution: NOT REQUIRED
Documentation › Markings/Placards › Oil Discharge Placard
Issued 17 February 2011
Resolved
Provide and post oil pollution placards in machinery spaces.
Action required: 15 - Rectify deficiencies by next port
Resolved 17 February 2011
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 17 February 2011
Resolved
Provide line diagram for oil transfer procedures
Action required: 15 - Rectify deficiencies by next port
Resolved 21 September 2011
Resolution: Deficiency Corrected.
Lifesaving › Visual Distress Signals (General) › Quantity
Issued 17 February 2011
Resolved
Provide 02 additional handflares for a total of 6
Due 17 March 2011
Resolved 17 February 2011
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 February 2011
Resolved
Provide machinery covers for port and stbd side generators
Due 17 March 2011
Resolved 9 September 2011
Resolution: Deficiency Cleared
Lifesaving › Inflatable Liferafts › Servicing
Issued 17 February 2011
Resolved
Life raft due for service NOV10 3months past svc date but within 5 months, local AMSAM liferaft facility does not service type or capacity. Service 25 person life raft next port call.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 September 2011
Resolution: Deficiency Cleared
Communications › Alarms/Indicators › Bilge Alarm
Issued 17 February 2011
Resolved
Unable to test bilge alarm due to high level, offload oily waste to an approved reception facility and conduct satisfactory test of the vessel bilge alarm
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 February 2011