← All vessels
EAST LOYALTY
EAST LOYALTY is a tank ship. The Coast Guard has recorded 6 inspections since 2020, most recently in January 2026, along with 8 deficiencies.
Records from 2020 to 2026. Most recent: inspection, 7 January 2026.
- Built
- Not recorded
- Last inspected
- 7 January 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 8 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9537745 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7A5505
1108855
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1108855
Inspections, by type
The 6 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it166231 - Convention (Subpart B), Gross Ton
299999 - Dead Weight, Ton
345079 - Displacement, Ton
110440 - Convention (Subpart B), Net Ton
299999 - Dead Weight, Ton
345079 - Displacement, Ton
110440 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
7 January 2026
COC-TVE Annual
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8291645
19 November 2024
PSC B · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8036970
21 July 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7748465
5 May 2023
PSC B · COC-TVE Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7674804
14 February 2020
COC-TVE Renew · PSC A
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6899688
30 January 2020
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6899739
Deficiency record · 8
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 January 2026
Resolved
No electrical equipment shall be installed in any space where flammable vapors are liablke to collect including those on board tankers, unless the administration is satisfied that such equipment is appropriately certified for safe usae in dusts, vapors, or gasses likely encountered.
The PSCO observed imporoper wiring in the pumproom ballast treatment plant, port and starboard midshipstore vent fans, tank overfill alarms, on lighting for port accomodation ladder, and starboard side of accomodation. Additionally PSCO observed non-certified light on starboard side of accomodation facing cargo area.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 January 2026
Resolved
The condition of the ship and its equipment shall be maintained to confrom with the provisions of present regulation to ensure the ship is in all aspects fit to proceed to sea, without danger to the ship or persons on board.
The PSCO observed leaks on the cargo tank P/V valves for cargo tanks 2STBD, 2 center and 3 center
Rectify prior to cargo operations.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 7 January 2026
Resolved
The confition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all aspects will remain fit to proceed to sea without danger to the ship or persons onboard.
The PSCO observed handrails for safe access to the bow broken in vicinity of cargo tank #2 center.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 January 2026
Resolved
The venting system shall be provided with devices to prevent the passage of flame into the cargo tanks. The design testing and locating of these devices shall comply with the requirements established by the administration based on guidelines developed by the organization.
PSCO observed improperly installed flame screen on cargo tank 5 STBD causing opening in vaccum sides.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 7 January 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard.
PSCO observed two of three sample pumps for fixed gas detection system broken off mounts. Pumps were ziptied in place. Zip ties were anchored to electrical wiring pulling wiring from connections.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 19 November 2024
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 May 2023
Resolved
IN TANKERS, ELECTRICAL EQUIPMENT, CABLES, AND WIRING SHALL NOT BE INSTALLED IN HAZARDOUS LOCATIONS UNLESS IT CONFORMS WITH STANDARDS NOT INFERIOR TO THOSE ACCEPTABLE TO THE ORGANIZATION. 07 CRACKED LENSES ON LIGHTS IN PUMP ROOM.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 5 May 2023
Resolved
THE HYDROCARBON GAS DETECTION EQUIPMENT...SHALL BE LOCATED IN A REASONABLE GAS-TIGHT CABINET. THE CABINET HAS BEEN RETROFITTED WITH AIR INTAKE AND EXHAUST OPENINGS TO THE CARGO CONTROL ROOM.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.