← All vessels
MSC CANDICE
MSC CANDICE is a 2007 freight ship. The Coast Guard has recorded 19 inspections since 2011, most recently in May 2026, along with 12 deficiencies and 4 operational controls.
Records from 2011 to 2026. Most recent: inspection, 27 May 2026.
- Built
- 2007
- Last inspected
- 27 May 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 12 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9339284 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3ENC5
1109118
Flag
PANAMA
—
Maury page id
psix-1109118
Inspections, by type
…with no type recorded4
Years with a record
10 calendar years (2011–2026)
The 19 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it61479 - Convention (Subpart B), Net Ton
906625 - Dead Weight, Ton
1270541 - Displacement, Ton
108930 - Convention (Subpart B), Gross Ton
906625 - Dead Weight, Ton
1270541 - Displacement, Ton
108930 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 19
27 May 2026
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8381512
8 December 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8279176
28 August 2025
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8219830
8 January 2024
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7846619
25 November 2023
Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7829229
28 September 2023
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7799713
23 September 2023
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7796842
8 March 2023
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7646309
3 August 2022
PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7523106
7 December 2020
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7107373
24 April 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6398723
20 April 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6395512
15 February 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6355431
14 February 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6355329
11 February 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6353404
21 January 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6074448
5 January 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5790942
18 August 2011
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4109708
18 February 2011
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3948228
Deficiency record · 12
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 25 November 2023
Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED SO AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ONBOARD, DUE REGARD BEING PAID TO MOVING PARTS, HOT SURFACES, AND OTHER HAZARDS. PSCO OBSERVED STEAM LEAK FROM TOP OF AUXILIARY BOILER IN THE ENGINE ROOM.
74 SOLAS (2004) II-1/REG 26.1
40AC
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 23 September 2023
Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part I, so that all entries in the book appropriate to that operation are completed. Missing bunker log entry in Oil Record Book Part 1 for receipt of 2,501.980 metric tons of HCFO and 199.870 metric tons of MGO on 08/01/2023. Additionally, log entry detailing oil transfers from the bilge well below main engine through a manual portable pump to sludge tank not being recording in Oil Record Book Part 1.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 23 September 2023
Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. For the purpose of this regulation, the requirements of the code shall be treated as mandatory. In meeting these requirements, the company should ensure that inspections be held at appropriate intervals. Any non-conformity is reported with its possible cause. If known appropriate corrective action is taken. Due to the objective evidence in the following deficiencies, the vessel is not in substantial compliance with relevant conventions calling into question the adequacy and implementation of the vessels SMS under the ISM code. PSCO collected objective evidence that the vessel was not identifying non-conformities and following the inspection and reporting requirements of its SMS. An external audit by a third party is required. Provide a copy of the completed audit to the USCG prior to departure from port.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 23 September 2023
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed and maintained in compliance with the structural, mechanical, and electrical requirements of a classification society which is recognized by the administration in accordance with the provisions of regulation XI/1, or with applicable national standards of the Administration which provide an equivalent level of safety.
PSCO observed portable pump next to bilge well opening below main engine. Chief engineer explained that the manual portable pump is used to transfer bilge contents from bilge well to sludge tank. This was due to the oil content being too high and triggering shutdown of the OWS system. No class or flag approved procedures or instructions could be provided.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 23 September 2023
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose the following functional requirements shall be met: Means shall be provided to control leaks of flammable liquids. PSCO observed numerous oil soaked rags, catch basins around engine room and oil stained cardboard being used as splash guard around fuel filter on generators #2 and #4.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 23 September 2023
Resolved
Every steam pipe and every fitting connected there to through which steam may pass shall be designed, constructed and installed as to withstand the maximum working stress to which it may be subjected. PSCO observed water leakage from steam line in oil purifier system.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 23 September 2023
Resolved
The machinery, boilers and and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum and danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to material used in construction, the purpose for which the equipment is intended, the working conditions to which it will be subjected and the environmental condition on board. PSCO observed steam leak from top of auxiliary boiler.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 September 2023
Resolved
Doors required to be self- closing shall not be fitted with hold back hooks. PSCO observed door to emergency generator room was held open with tied electrical cable.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 September 2023
Resolved
The function of fixed fire detection and fire alarm systems shall be periodically tested to the satisfaction of the administration by means of equipment producing hot air at the appropriate temperature, or smoke or aerosol particles having the appropriate range of density or particle size, or other phenomena associated with incipient fires to which the detector is designed to respond. PSCO observed chief engineer testing the flame detector with a flame releasing device.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 8 March 2023
Resolved
In the event of a power failure to any of the steering gear power units, an audible and visual alarm shall be given on the navigation bridge. PSCO oberved visual alarm on bridge was inoperable for steering gear overload.
16AC
74 SOLAS (2004 cons) II-1/Reg. 29.5.2
Deck/Cargo › Ballast › Pumps
Issued 21 January 2017
Resolved
The vessels #2 ballast water pump packing seal has failed resulting in a substantial leak even while the pump is not running. The vessel has rigged a flexible hose directly from the seal to the bilge on the foward port side of the engine room.
Construction/Loadline › Hull › Side Shell
Issued 21 January 2017
Resolved
Vessel has 03 sharp insets approx. 12 inches long by 2 inches deep located near frame 275 2UHFOS / 1UHFOS.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.