AP KUPARI is a 2010 freight ship. The Coast Guard has recorded 5 inspections since 2018, most recently in January 2026, along with 3 deficiencies and 1 operational control.
Records from 2018 to 2026. Most recent: inspection, 7 January 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it11522 - Convention (Subpart B), Net Ton 23400 - Convention (Subpart B), Gross Ton 43631 - Displacement, Metric Ton 34375 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 5
7 January 2026Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8291409
18 October 2024PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8017553
27 September 2022Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7567210
2 May 2022PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7442244
18 January 2018Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6339981
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 October 2024Resolved
Each of the required fire pumps shall. in any event be capable of delivering at least the two required jets of water. When crew was called upon to demonstrate the operational readiness of the emergency fire pump,it was reported the emergency fire pump was unable to draw suction due to vessel's draft and stability.
74Solas(20) II-2/10.2.2.4.2 code:60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 October 2024
Resolved 19 October 2024
Resolution: Received, reviewed and accepted class report from [name withheld] stating the
deficiency was rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 October 2024Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service from which they are intended. PSCO observed failed return condensate line from maine engine heat exchanger to the boiler. Request clarification from certificate issuing authority for continuing acceptance.
74Solas(20) II-1/26.1
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 18 October 2024
Resolved 19 October 2024
Resolution: Received, reviewed and accepted class report from [name withheld] stating the
deficiency was rectified. Crew members replaced instalation of the piping connecting the condenser water from the main engie heater and replaced a gasket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 2 May 2022Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed pin hole leaks on cooling water piping for main propulsion engine and generator.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2022
Resolved 12 May 2022
Resolution: Received class report attesting to the repairs made to the cooling water piping.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.