Records from 1993 to 2024. Most recent: inspection, 3 July 2024.
Inspection history · 12
3 July 2024
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7948327
1 May 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7678943
29 August 2022
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7546629
6 May 2021
Initial Certification
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7191020
6 April 2012
Industry Initiated Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4280498
1 March 2012
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4254245
29 February 2012
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4262386
28 January 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 671457
15 January 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 183421
22 August 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 671459
18 August 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 213077
5 September 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 136914
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 May 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessel had a leak on the outboard side of the starboard engine. Repair to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2023
Resolved 22 June 2023
Resolution: Vessel Rep repaired issue by buying required part to corrected leaking issue.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 31 May 2023
Resolved
Pressure vessels over 5 cubic feet in volume and over 15 pounds per square inch maximum allowable working pressure (MAWP) must be equipped with an one or more spring-loaded relief valves. The total relieving capacity of such relief valves must prevent pressure from exceeding the MAWP, as established by the manufacturer, by more than 10 percent. Vessel had no proof of relief valve being tested at set PSI. Replace relief valve to the satisfaction of attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 22 June 2023
Resolution: Vessel rep purchased new relief valve with tag.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 31 May 2023
Resolved
All pressure vessels must have the MAWP indicated by a stamp, nameplate, or other means visible to the crew. Vessel had no indication of the MAWP of the pressure vessel. Repair to the satisfaction of the attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 22 June 2023
Resolution: Vessel rep researched and added visual means on PV so crew can see.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 31 May 2023
Resolved
An exposed hazard such as gears and rotating machinery, must be protected by a cover, guard or rail. This is not meant to restrict access to equipment necessary for the operation of the vessel. Rotating belt on the pressure vessel had no guard in place. Repair to the satisfaction of the attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 22 June 2023
Resolution: Vessel rep added guard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 September 2022
Resolved
Electrical components that pose an electrical hazard must be in an enclosure. Fuel line for generator was found to be running through the battery box. Update fuel line configuration to the satisfaction of the USCG Marine Inspector.
46 CFR 143.400(g)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 16 September 2022
Resolved 29 September 2022
Resolution: Fuel line was renewed and rerouted to primary fuel filter. Fuel filter by the battery box was a secondary filter. Secondary filter removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 September 2022
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must: Be maintained to ensure proper operation.
Both shaft packing tubes were found to leak substantially into the engine room bilge. Repair / replace shaft packing tube to the satisfaction of the USCG Marine Inspector.
46 CFR 143.205(c)(1)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 16 September 2022
Resolved 29 September 2022
Resolution: Shaft packing was properly replaced. Water ingress rectified on both STBD and Port shafts.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 September 2022
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.
Port and starboard MDE tachometer wiring found to be disconnected and routed through bilge. Hot wire to removed bilge pump found to be loose and not terminated properly. Electrical connection cover on potable water pump not secured properly. Repair / replace all to the satisfaction of the USCG Marine Inspector.
46 CFR 143.400(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 29 September 2022
Resolution: Port and STBD MDE tachometer wiring satisfactorily replaced and hung correctly. Hot bare wire has been properly terminated in a junction box. Potable water pump junction box cover satisfactorily replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 16 September 2022
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford protection against hazards to life, property, and the environment. Deck plating in engine room was found to be either unsecured and dangerous to transit upon or welded down preventing essential maintenance. Rectify to the satisfaction of the USCG Marine Inspector.
46 CFR 140.205(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 29 September 2022
Resolution: Additional deck plating was installed to prevent work and trip hazards around the machinery. Deck plating was secured in place with fasteners.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 16 September 2022
Resolved
An exposed hazard such as gears and rotating machinery, must be protected by a cover, guard or rail. This is not meant to restrict access to towing equipment such as winches, drums, towing gear or steering compartment equipment necessary for the operation of the vessel. Both MDEs and generator were missing guards over the pulleys. Repair to the satisfaction of the USCG Marine Inspector.
46 CFR 144.820
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 29 September 2022
Resolution: Satisfactory machinery guards were constructed and installed on the Generator and MDEs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 September 2022
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Vent covers for engine room intake fans were smaller diameter than opening and lacked adequate protection from rain and seawater ingress. Stbd search light on pilot house has wasted frame and allows water ingress into operating station. Replace to the satisfaction of the USCG Marine Inspector.
46 CFR 144.320(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 6 October 2022
Resolution: New alterations to the vent fan E/R covers allowed satisfactory drainage of water without water ingress to the engine room. Pictures attached.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 September 2022
Resolved
The following systems must be equipped with gauges at the machinery location: Auxiliary generator engine lubricating oil pressure and auxiliary generator engine RPM. Oil pressure gauge for generator at operating station did not function. Repair to the satisfaction of the USCG Marine Inspector.
46 CFR 143.230(c)(3)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 29 September 2022
Resolution: New sending unit and guage were installed for the Operating Station oil pressure gauge.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 16 September 2022
Resolved
An existing vessel may be deemed by the OCMI, or TPO, to be in compliance with this subpart provided that either: (a) The vessel is built, equipped, and maintained to conform to the rules of a recognized classification society appropriate for the intended service and routes, but not classed. Exhaust stack house had several wasted areas, allowing progressive downward flooding into the Engine Room. Repair to the satisfaction of the USCG Marine Inspector.
46 CFR 144.200(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 29 September 2022
Resolution: Wasted areas on the exhaust stack house were repaired with new stock and doublers.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 29 August 2022
Resolved
An existing vessel may be deemed by the OCMI, or TPO, to be in compliance with this subpart provided that either: The vessel is built, equipped, and maintained to conform to the rules of a recognized classification society appropriate for the intended service and routes, but not classed. A 3" hole is present in the aft bulkhead of the engine room leading directly to the potable water tank.
Repair to the satisfaction of the USCG Marine Inspector.
46 CFR 144.200(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2022
Resolved 29 September 2022
Resolution: Hole satisfactorily plugged with a threaded plug to prevent water ingress into the engine room.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 10 June 2021
Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into such spaces.
There are no means of closing ventilation openings to machinery space.
Provide a means of closing ventilation openings to machinery space.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2021
Resolved 15 September 2021
Resolution: Vent covers have been fabricated out of canvas and are onboard vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 June 2021
Resolved
Steering system: Examine the condition of, and where appropriate, witness the operation of: steering systems and equipment ensuring smooth operation.
Witnessed steering operation and noticed wasted pin on the starboard side connection rod.
Prove proper operation of steering system.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 9 June 2021
Resolved 10 June 2021
Resolution: Steering system was repaired and tested; All Sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 June 2021
Resolved
Each towing vessel must have a reliable means to provide notification when an emergencey condition exists or an essentail system develops problems that require attention. High bilge level alarms must be provided.
Bilge high level alarm INOP. Float for high level switch is on order.
Prove proper operation of high level bilge alarm.
Vessel is to make hourly rounds of engine room until proper operation of bilge high level alarm is proven.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2021
Resolved 10 June 2021
Resolution: Bilge high level float switch was replaced and tested to the satisfaction of the Coast Guard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2021
Resolved
Electrical equipment and electrical cables must be suitably protected from wet and corrosive enviroments.
Battery installation was exposed.
Provide battery box for batteries.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 June 2021
Resolved 10 June 2021
Resolution: Battery box was installed to the satisfaction of the Coast Guard.