← All vessels
SAPPORO PRINCESS
SAPPORO PRINCESS is a tank ship. The Coast Guard has recorded 2 inspections in 2024, along with 2 deficiencies.
Records in 2024. Most recent: inspection, 26 August 2024.
- Built
- Not recorded
- Last inspected
- 26 August 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9439199 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
SVAX7
1109672
Flag
GREECE
—
Maury page id
psix-1109672
Inspections, by type
The 2 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records itNot recorded
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 2
26 August 2024
PSC B · COC-TVE Renew
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7989382
5 August 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7974990
Deficiency record · 2
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 26 August 2024
Resolved
The protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the fire safety system code. Deck crater seal has minor leak at fresh water fill inlet flange or gasket.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 26 August 2024
Resolved
Every company should develop, implement, and maintain a safety management system which includes the following functional requirement: instructions and procedures. SMS cyber security plan states, "Only authorized crew members and employees of business partners can access the restricted area" Server door on rack unlocked, username/password to VSAT posted, terminal connected to server not password protected.
Note: Vessel must conduct internal audit to ensure SMS cyber hygiene is properly implemented.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.