MAURY USCG vessel records
← All vessels

YUYO SPIRITS

YUYO SPIRITS is a 2009 tank ship. The Coast Guard has recorded 17 inspections since 2017, most recently in April 2026, along with 14 deficiencies and 3 operational controls.

Records from 2017 to 2026. Most recent: inspection, 8 April 2026.

Built
2009
Last inspected
8 April 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 8 April 2026
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2017–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9395501
1111046
Flag
PANAMA
Maury page id
psix-1111046

Documentation record

Tonnage as PSIX records it49999 - Dead Weight, Metric Ton
68155 - Displacement, Metric Ton
13790 - Convention (Subpart B), Net Ton
45966 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 17

8 April 2026 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8341771
8 April 2026 Administrative Inspection · COC-GAS Renew · PSC B · ISPS Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8343476
22 July 2025 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8192015
10 May 2025 PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8129224
22 March 2024 COC-GAS Renew · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7882793
20 April 2023 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7672358
1 March 2023 COC-GAS Annual · Deficiency Check · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7640164
4 October 2022 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7571279
15 January 2022 PSC B · Administrative Inspection · COC-GAS Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7376925
16 August 2021 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7288562
2 June 2021 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7214399
24 February 2021 PSC B · COC-GAS Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7136992
3 December 2019 Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6862985
1 April 2019 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6653901
5 February 2019 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6620343
12 November 2018 ISPS II Exam · Ballast Water Examination · COC-GAS Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6575944
28 September 2017 Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6277210

Deficiency record · 14

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 2 March 2023 Resolved
The safety management system shall be maintained in accordance with the provisions of the International Safety Management Code. The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations, and with any additional requirements which may be established by the company.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 April 2023
Resolution: Recieved Class Survey Report Attesting to corrective action and repairs.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 1 March 2023 Resolved
The water spray system should be capable of covering all areas mentioned in 11.3.1 with uniformly distributed water-spray of at least 10 L/m squared per minute for horizontal projected surfaces and 4 L/m squared per minute for vertical surfaces. PSCO observed no less than 12 water spray nozzles clogged or spraying inadequately at various protected cargo areas
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 April 2023
Resolution: Recieved Class Survey Report Attesting to corrective action and repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 1 March 2023 Resolved
Food rations shall be kept in airtight packaging. PSCO identified 12 food rations located in the lifeboats that were not airtight. Insufficient spares on board
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 March 2023
Resolution: Class attestation of new Food rations onboard.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 1 March 2023 Resolved
All gasketed pipes, joints and hose connections should be electronically bonded; 4 cargo lines at manifold had missing or improperly secured bonding straps. One line was actively being used for loading cargo
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2023
Resolution: Applied securing nuts to the manifold, ensured electrical bonding.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 March 2023 Resolved
Fire doors in main vertical zone bulkheads, galley boundaries, and stairway enclosures other than power-operated watertight doors and those which are normaly locked shall satisfy the following requirements: The doors shall be self-closing and be capable of closing with an angle of inclination of up to 3.5 degrees opposing closure. All stairway enclosures above deck A were observed to not be self-closing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 March 2023
Resolution: Class Survey Attestation to rectification.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 1 March 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed a rupture on the deck water spray pipeline above the #1 cargo tank dome approximately the size of a quarter. Port state control officers also observed a hole on the deck water spray piping covering the house causing a deluge of water to pour on to the deck below. The hole on the house piping appeared to be there prior to the inspection as it was severely corroded with rust stains approximately 6 inches around the hole.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 March 2023
Resolution: Class Survey Rectification.
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 1 March 2023 Resolved
Plans and booklets shall be kept up to date; any alterations thereto shall be recorded as soon as practicable. PSCO observed that the fire control plan does not match what was physically observed regarding smoke detectors and IMO symbols for doors. Symbols located on the fire control plan were not in accordance with IMO Resolution A.952(23)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 April 2023
Resolution: Recieved Class Survey Report Attesting to corrective action and repairs.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 1 March 2023 Resolved
The electrical installations shall be such that the safety of passengers, crew and ship from electrical hazard will be ensured. PSCO observed water in the housing of a deck light adjacent to the cargo deck.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 2 March 2023
Resolution: Rectified.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 1 March 2023 Resolved
The safety management system shall be maintained in accordance with the provisions of the International Safety Management Code. The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations, and with any additional requirements which may be established by the company. PSCO’s noted the above deficiencies and questions the implementation of the vessel’s safety management system. Due to the noted deficiencies, the vessel is required to receive an audit within 90 days.
Action required: 30 - Ship detained
Resolved 2 March 2023
Resolution: Inspectors attended the vessel and verified Class survey attestation.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 24 February 2021 Resolved
Pressure relief valves should be set and sealed by a competent authority acceptable to the administration. Five of eight saftey relief valves were missing marking tags that correspond to the testing certificates, In addition, the number one starboard seal was broken. Rectify the broken seal prior to loading cargo in the number one cargo tank.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 February 2021
Resolution: Replaced broken pilot operated safety valve seal between the pilot valve and the main valve of No.1 Cargo Tank(S) with a new seal. The attending surveyor also verified all valve tags which were installed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 February 2021 Resolved
A water spray system for cooling, fire prevention and crew protection should be installed to cover exposed cargo tank domes. After one and a half hours of maintenance and testing, crew discovered a blockage in a pipe elbow causing a restriction to cargo tank number one.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 February 2021
Resolution: Corrected on the spot.
Electrical › Electrical Distribution System (service) › Cable
Issued 28 September 2017 Resolved
0999 - Cable runs located above the navigation bridge were not secured properly and had potential of causing a navigation hazard. 74 SOLAS (04) II-1/40.1.3 10c
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 September 2017
Resolved 28 September 2017
Resolution: Engineers properly bundled loose wires along starboard side of "monkey island". Wires were for GPS, NAVTEX, and other navigational systems.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 28 September 2017 Resolved
1840 - Intrinsically safe wiring for high level and overfill sensors on all cargo tanks are wasted at connection points and would not prevent passing of flammable gas into the sensors. 46 CFR 154.1010(b) 10c
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 September 2017
Resolved 28 September 2017
Resolution: Crew repaired electrical connections for all high and overfill alarm sensors on cargo tank tops.
Communications › Alarms/Indicators › General Alarm
Issued 28 September 2017 Resolved
1840 - Each vessel must have means of testing each alarm. Cargo general alarm on bridge was inaudible from deck. 46 CFR 154.1365(d) 10c
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 September 2017
Resolved 28 September 2017
Resolution: Alarm was replaced and tested satisfactorily.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.