MAURY USCG vessel records
← All vessels

CBC 1345

CBC 1345 is a 2012 tank barge. The Coast Guard has recorded 7 inspections since 2012, most recently in May 2022, along with 5 deficiencies.

Records from 2012 to 2022. Most recent: inspection, 23 May 2022.

Built
2012
Last inspected
23 May 2022
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

1111628
Flag
UNITED STATES
Maury page id
psix-1111628

Inspections, by type

Years with a record 6 calendar years (2012–2022)
The 7 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · GALVESTON, TX, UNITED STATES · built 2012
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 16 September 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Net Ton
735 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspection history · 7

23 May 2022 COI Inspection · Internal Structural Exam · Cargo Tank Internal · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7454028
12 April 2017 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6123205
4 April 2017 Administrative Inspection · Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6117866
9 June 2016 MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5902387
1 April 2015 Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5095972
5 March 2014 Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4810550
13 January 2012 Cargo Tank Internal · Drydock Exam · Internal Structural Exam · MTSA Verification · Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4268820

Deficiency record · 5

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2022 Resolved
Openings for fill and vent pipes must be on the topmost surface of a tank. There must be no openings in the bottom, sides, or ends of a tank except an opening fitted with threaded plug or cap may be used on the bottom of the tank for tank cleaning purposes. Clean-out on bottom of tank is equipped with a flange fitting Apply flange shielding as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 May 2022
Resolution: Flange shield installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2022 Resolved
Bolts and studs must extend completely through the nuts. The following fittings were found with bolts not extending through nuts: * Cargo flange blank - #3 Cargo hold * Steam line flange blank - #4 Starboard wing Install bolts that extend through nuts as required.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 May 2022
Resolution: Longer bolts installed to extend past nuts
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 23 May 2022 Resolved
Each tank must be provided with a suitable means of determining liquid level. Cargo tank sounding devices damaged in #2 (midway up) and #3 (bottom) cargo tanks. Repair sounding markings as required.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 May 2022
Resolution: Sounding marks straightend out
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 23 May 2022 Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. The following deficiencies were identified: 1) #2 Port Wing Void - Between #3 & #5 Outboard side vertical hull frame - deck and top hull stiffener repairs not welded on both sides. Weld both sides 2) #5 Port Wing Void - #1 Outboard side vertical hull frame / bilge stiffener - cracked weld - Gouge out and re-weld 3) #4 STBD Wing Void - #4 Outboard side vertical hull frame / bilge stiffener - cracked weld - Gouge out and re-weld 4) #4 STBD Wing Void - #1 Outboard side vertical hull frame - improper repair - Crop and Renew 5) #3 STBD Wing Void - #1 Outboard side vertical hull frame / bilge stiffener - cracked weld - Gouge out and re-weld 6) #2 STBD Wing Void - #3 Outboard side vertical hull frame / top hull stiffener - cracked weld - Gouge out and re-weld
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 May 2022
Resolution: All repairs completed
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 23 May 2022 Resolved
Safety relief valves shall be tested by bench testing or other suitable means. The valves shall relieve and reseat within the design tolerances of the set pressure, or it shall be removed and reset prior to being returned to service. This test shall be conducted at the time of the inspection for certification. Testing of safety relief valves not completed. Provide objective evidence that testing was completed as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 May 2022
Resolution: Safety valve tested as required

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.