Records from 2011 to 2020. Most recent: inspection, 3 July 2020.
Inspection history · 31
3 July 2020
PSC B · COC-TVE Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6985001
14 August 2019
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6784665
26 June 2019
COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6725332
28 August 2018
COE-Dockside
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6497833
19 July 2018
Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6476442
21 November 2017
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6310677
5 November 2017
COE-Administrative
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6302304
21 September 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6271547
31 August 2017
ISPS II Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6248797
11 July 2017
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6201389
24 February 2017
COE-Administrative · Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6093876
18 October 2016
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6024838
21 September 2016
COE-Dockside
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5997897
14 July 2016
COC-TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5932808
11 March 2016
COE-Dockside
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5827198
18 February 2016
PI Safety Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5817480
18 February 2016
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5817623
18 February 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5817941
26 October 2015
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5747754
11 October 2015
Administrative Inspection · COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5740310
13 August 2015
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5214640
6 August 2014
COE-Administrative
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4945749
4 March 2014
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4809365
18 July 2012
Ballast Water Examination · ISPS III Exam · COC-TVE Annual · COE-Dockside
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4376317
8 June 2012
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4338543
22 May 2012
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4319300
21 May 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4321624
6 September 2011
ISPS III Exam · Ballast Water Examination · PI Safety Exam · COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4132744
6 September 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4136963
5 September 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4137172
12 July 2011
ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4079249
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 11 July 2017
Resolved
No person shall conduct an oil transfer operation unless: All connections in the transfer system are leak free. Currently there are leaks on the #2 Cargo Poil Pump piping at a flange before the pneumatic valve and at the #3 Cargo Oil Pump piping at a flange before the cross over manifold.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 July 2017
Resolution: Crew conducted repairs to cargo pump piping system. Class surveyor approved repairs and witnessed cargo piping pressure test to the Maximum Allowable Working Pressure. Received and accepted Class surveyor report.
Engineering › Steering Gear System › Power Unit
Issued 22 May 2012
Resolved
STBD steering control unit was damaged during a fire. Electrical wiring was damaged by the fire and a low earth resistance contributed to the failure of the PC board /steering control unit.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 24 May 2012
Resolution: Letter from Class stating the STBD steering control unit PC board was replaced and found satisfactory.
Engineering › Steering Gear System › Linkage
Issued 6 September 2011
Resolved
0936-Steering Gear-Every ship shall be provided with a main steering gear to satisafaction of the Admin. it was reported that the ship had a steering irregularity due to a mechanical failure of the tiller motor.SOLAS 09 II/I-29
Action required: 17 - Rectify deficiencies prior to departure
Due 6 September 2011
Resolved 6 September 2011
Resolution: PSCO observed the steering gear system properly working in all modes of operation.