Records from 2016 to 2026. Most recent: inspection, 27 March 2026.
Documentation record
Registered dimensions (L × B × D)40.1 ft × 13.1 ft × 6.8 ft
Registered tonnagegross 23 / net 15
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE LA, UNITED STATES · built 1971
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it23 - Regulatory (Subpart C or D), Gross Ton
15 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 11
27 March 2026
Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8302314
28 April 2025
Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8089322
1 April 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7888335
28 March 2023
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7646195
29 March 2022
COI Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7389901
18 March 2021
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7139268
20 May 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6948613
28 June 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6719013
16 May 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6410948
29 March 2017
Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6110997
13 May 2016
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5873371
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 April 2025
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load. MI observed port MDE unable to engage propulsion. 46CFR182.05-1(a) (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2025
Resolved 28 April 2025
Resolution: MI witnessed satisfactory propulsion test.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 18 May 2023
Resolved
The ring life buoys shall be so placed as to be readily accessible. They shall be capable of being cast loose, shall not be permanently secured in any way, and one of the ring life buoys shall have attached to it a line at least 60 feet in length. Inspector observed life line buoy chaffed and degraded. Replace with approved lifeline.
46CFR180.30-10(b)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 May 2023
Resolution: Verification of the Ring Life Buoy and line replacement received, reviewed, and accepted, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 May 2023
Resolved
Engine exhaust cooling systems built in accordance with the requirements of American Boat and Yacht Council, Inc., Standard p-1, "Safe Installation of Exhaust Systems for Propulsion and Auxiliary Machinery" will be considered as meeting the requirements of this section.Inspector observed exhaust cooling hose to have leaks at the connection point of the exhaust. Repair hose to meet requirements of initial construction.
182.20-15(a)
182.15-15(c)
Action required: 10 - Deficiency Rectified
Resolved 18 May 2023
Resolution: Cooling water leak fixed, and to the satisfaction of the Marine Inspector, all sat.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 30 March 2022
Resolved
46 CFR 184.420(a)(2)(3)(4): As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: U.S. Coast Pilot [name withheld] List, and Tides Tables. While conducting inspection MI found outdated publications.
Action required: 10 - Deficiency Rectified
Resolved 30 March 2022
Resolution: Vessel Rep purchased new publications and placed on vessel.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 30 March 2022
Resolved
46 CFR 177.300(d)(1): Except as otherwise allowed by this subpart, a vessel must comply with the structural design requirements of one of the standards listed below for the hull material of the vessel. Lloyd's yachts and small crafts. MI identified several cracks to the hull: Fwd of the aft STBD engine inboard mount. Aft of the FWD inboard Port engine mount, and center rail at the base.
Action required: 10 - Deficiency Rectified
Due 30 March 2022
Resolved 30 March 2022
Resolution: Vessel rep provided sufficient photo evidence to prove the deficiency was rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 March 2022
Resolved
46 CFR 182.05-1: Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. MI found leaks on both engines at the flow meter piping connections.
Action required: 10 - Deficiency Rectified
Resolved 30 March 2022
Resolution: Piping connections were tightened and are free of leaks.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 March 2022
Resolved
46 CFR 180.70(d)(2): Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet in length, securing the waterlight around the body of the ring life buoy. MI found the waterlight clipped to the grab line of the lifebuoy.
Action required: 10 - Deficiency Rectified
Resolved 30 March 2022
Resolution: Vessel rep reconnected the waterlight around the body of the life buoy.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 March 2022
Resolved
46 CFR 171.114(a)(2): Penetrations and openings in watertight bulkheads mus. Have means to make them watertight. MI found bulkhead penetrations that were not watertight.
Action required: 10 - Deficiency Rectified
Resolved 30 March 2022
Resolution: Vessel rep sealed the bulkhead penetrations to be watertight.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 30 March 2022
Resolved
46 CFR 171.24(a): Each hatch exposed to the weather must be watertight. MI found the scuttle opening to the steering gear room not responding to the handle, and not providing watertight coverage to the space.
Action required: 10 - Deficiency Rectified
Resolved 30 March 2022
Resolution: Vessel rep removed the scuttle, disassembled, and correctly adjusted the scuttle to respond to the handle turns.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 20 May 2020
Resolved
Vessel has expired navigation charts, update using LNTM or provide new charts. Operator provided new updated charts, fixed on the spot. 46 CFR 184.420.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 20 May 2020
Resolution: Operator provided new updated charts, fixed on the spot.