Inspection history · 32
25 June 2026
Administrative Inspection · Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8395202
30 June 2025
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8166318
24 July 2024
Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7932484
29 June 2023
Deficiency Check · Internal Structural Exam · Administrative Inspection · COI Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7724692
28 June 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7478258
26 July 2021
Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7272961
28 June 2021
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7235704
29 June 2020
Deficiency Check · Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6987493
13 August 2019
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6776767
3 May 2018
Internal Structural Exam · Drydock Exam · Cargo Tank Internal · COI Inspection · Administrative Inspection · Examination of Repairs
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6408577
18 April 2017
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6123918
23 May 2016
Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5884401
7 May 2015
Administrative Inspection · Deficiency Check · Periodic Inspection · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5118697
31 March 2014
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4826322
27 March 2012
Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4269070
20 June 2011
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4051432
20 April 2010
Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3712166
19 June 2009
Damage Survey · Examination of Repairs
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3508388
12 June 2009
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3579337
11 March 2009
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3431076
3 April 2008
COI Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3171197
10 January 2008
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3129905
27 March 2007
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2896274
9 May 2006
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2610610
9 March 2005
Internal Structural Exam · Annual Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2296956
14 April 2004
Periodic Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2042302
2 April 2003
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1766884
6 March 2003
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1753555
5 December 2002
Administrative Inspection · Periodic Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1718192
19 April 2002
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1606616
11 July 2001
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1384818
20 June 2000
Initial Certification · Construction Oversight · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1472170
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 30 June 2025
Resolved
A tank vessel must have all closure mechanisms on the following openings properly closed. Multiple void hatches were missing a gasket and allowed for rain water to particially fill several voids.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 July 2025
Resolution: Photos provided of installed hatch gaskets.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 30 June 2025
Resolved
All cargo tank hatches must be clearly marked in not less than three inch lettering “Danger—Keep Out”. Three cargo hatches not properly marked.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 July 2025
Resolution: Objective evidence provided of properly marked/labeled cargo hatches.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 30 June 2025
Resolved
Carge hoses must be marked with the MAWP. The #2 cargo hose was not marked with the MAWP as refereneced in 33 CFR 154.500.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 July 2025
Resolution: Objective evidence provided on properly labeled cargo transfer hose.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 June 2025
Resolved
As per 46 CFR 111.01-1: Electric installations on vessels must ensure maintenance of system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc.) to which plan review has been approved. The cover for the port side electrical connection box for the liquid overfill protection device was missing exposing the electrical components to the weather; Labels (previously on the cover) were missing for: Labeled “Connector for Barge Overflow Control System” and labeled with the total inductance and capacitance of the connected switches and cabling.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 July 2025
Resolution: Cover with required label re-installed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 30 June 2025
Resolved
As per 46 CFR 111.01-1: Electric installations on vessels must ensure maintenance of system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc.) to which plan review has been approved. Batteries for the liquid overfill protection device were physically damaged and no longer servicable.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 July 2025
Resolution: New batteries installed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 29 June 2023
Resolved
Vessel fitted with overfill protection devices as described by 46 CFR 39.2003 (meter stick type) to meet 33 CFR 155.480(a). Meter sticks for devices on cargo tanks #1 & 3 were damaged (magnet detached from sticks). (705: Correct prior to loading cargo tanks.)
Action required: 705 - Other - as specified
Resolved 13 July 2023
Resolution: Overfill protection devices serviced by USACE personnel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2023
Resolved
IAW 46 CFR 110.01-3 Electrical repairs must comply with the regulations in 46 CFR Subchapter J. Electrical junction box in starboard #1 void appeared to have been repaired using a plastic back and electrical tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 July 2023
Resolved 13 July 2023
Resolution: Electrical junction box serviced by USACE personnel.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 June 2023
Resolved
All vessels must have draft marks plainly and legibly visible. Vessel's draft marks were not plainly visible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 July 2023
Resolved 13 July 2023
Resolution: Draft marks re-painted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 29 June 2023
Resolved
Materials shall be at least equivalent to the requirements of the American Bureau of Shipping; Vessel's hatches were missing strong backs or missing a gasket.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 July 2023
Resolved 13 July 2023
Resolution: Hatches serviced by USACE personnel.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 June 2023
Resolved
Transfer hose required to meet 33 CFR 154.400 - marked with "Oil Service" and the Maximum Allowable Working Pressure (MAWP). 1"x50' cargo hose not marked as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 July 2023
Resolved 17 July 2023
Resolution: USACE personel reported hose properly marked with MAWP.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 28 June 2022
Resolved
Vessel equipped with one overfill device that is permanently installed on each cargo tank. Overfill device installed on #1 cargo tank is broken (meter stick is detached from magnet). Repair/replace level indicating meter stick and prove proper operation. Until device is operational, disable device to prevent reliance on faulty device and provide continuous visual monitoring of #1 cargo tank during loading operations.
Action required: 705 - Other - as specified
Due 28 July 2022
Resolved 25 July 2022
Resolution: Damaged piece of equipment replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 29 June 2020
Resolved
Original COI required to be on board vessel, although not required to be "Posted". Neither the original nor a copy of the COI was on board the vessel at the time of the inspection. Copy of COI was located in an office and the original could not be produced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 6 July 2020
Resolution: An original/amended COI was placed on board the vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 29 June 2020
Resolved
Vessel deck void hatches fitted with gasket. #2 port wing void, aft hatch cover gasket missing at time of inspection. Gasket required to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 July 2020
Resolved 6 July 2020
Resolution: Gasket installed on hatch.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 29 June 2020
Resolved
Cargo hoses required to be labeled with Maximum Allowable Working Pressure (MAWP). 1 inch cargo hose was not properly labeled with MAWP as per 33 CFR 154.500 as referenced by 33 CFR 155.800. Hose required to be properly labeled prior to using to conduct cargo transfer.
Action required: 705 - Other - as specified
Due 13 July 2020
Resolved 6 July 2020
Resolution: One inch cargo hose labeled with MAWP.
01 - Certificates & Documentation › 013 - Documents › Cargo information
Issued 13 August 2019
Resolved
Vessel required to have oil transfer procedures (OTPs) on board. OTPs not on board or available for inspection. OTPs required to be placed on board vessel prior to next cargo transfer.
Action required: 705 - Other - as specified
Resolved 14 August 2019
Resolution: ACOE Chief Engineer reported that oil transfer procedures had been placed on board the vessel.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 August 2019
Resolved
Test record for cargo (piping) relief valve and pressure gauge not available for inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2019
Resolved 14 August 2019
Resolution: Testing facility which conducted testing on 09JUL19 provided updated test records to vessel personnel.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 August 2019
Resolved
Vent for #3 cargo tank, fitted with a closure device, was closed rendering vent inoperable. Vent required to remain open for proper operation.
Action required: 10 - Deficiency Rectified
Due 13 August 2019
Resolved 13 August 2019
Resolution: Vent opened and secured in open position.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 7 May 2015
Resolved
Publicly owned vessel under volunteer compliance agreement did not have records of transfer equipment tests and inspections at time of CG inspection.
Action required: 705 - Other - as specified
Resolved 10 July 2015
Resolution: Report from vessel supervisor stating discrepancy had been cleared.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 7 May 2015
Resolved
Publically owned vessel's oil transfer procedures contained out of date contact information.
Action required: 705 - Other - as specified
Resolved 10 July 2015
Resolution: Report from vessel supervisor stating discrepancy had been cleared.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 20 June 2011
Resolved
Barge requires a hydrostatic test of entire piping transfer system. Last Hydrostatic test conducted APR2010.
Action required: 705 - Other - as specified
Due 21 July 2011
Resolved 15 July 2011
Resolution: Vessel hydrostatically tested entire piping transfer system on 6JUL2011. Documents scanned into MISLE.
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1-Routine Visual Inspections
Issued 20 June 2011
Resolved
EPA Vessel General Permit missing. Vessel required to obtain and have onboard vessel.
Action required: 705 - Other - as specified
Due 21 July 2011
Resolved 19 July 2011
Resolution: Tnkb has EPA VGP onboard. Verified by [name withheld], US Army Corp. of Engineers.
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2009
Resolved
Crop & renew Four foot by one foot fracture located in the port stern corner (box end) between the 8 and 12 foot draft mark.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2009
Resolution: Witnessed air test and Inspected reapairs to the satifaction of the attending marine inspector.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 9 May 2006
Resolved
No test records for cargo pressure gauge and pressure relief valve.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2006
Resolution: Pressure gauge replaced on 10MAY2006. Also, documentation provided to OCMI to prove maximum pump pressure (52 psi) is well below MAWP (75 psi).
Stability › Watertight Integrity › Weathertight Enclosure
Issued 9 May 2006
Resolved
Two void space hatch cover gaskets severely worn.
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 June 2006
Resolved 22 May 2006
Resolution: New gaskets purchased and installed.
Deck/Cargo › Cargo Stowage › General
Issued 9 May 2006
Resolved
An unathorized additional 4000 gallon slop oil tank was placed on the forward part of the barge.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 16 May 2006
Resolved 9 May 2006
Resolution: Unathorized 4000 gallon tank removed from vessel.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 9 May 2006
Resolved
Cargo piping improperly marked with test pressure and not with MAWP.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 June 2006
Resolved 22 May 2006
Resolution: Test pressure removed and MAWP stinciled on cargo piping.
Deck/Cargo › Cargo Stowage › General
Issued 9 May 2006
Resolved
55 gallon drums improperly stored on open deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 June 2006
Resolved 10 May 2006
Resolution: Drums properly stored and/or removed from deck of barge.
Fire Fighting › Portable CO2 Fire Extinguisher › Approval
Issued 9 March 2005
Resolved
Vessel has 2 CO2 fire extinguishers on board, but only one is CG approved. Vessel is required by the COI to have 2 approved extinguishers on board.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 May 2006
Resolution: Proved corrected during annual inspection.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 6 March 2003
Resolved
Provide proof of Fire Extinguisher annual servicing.
LEGACY COMPONENT DESC: Condition
Condition: Unknown
Due 6 April 2003
Resolved 2 April 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 6 March 2003
Resolved
Renew Damaged transfer hose on fuel transfer hose reel. LEGACY COMPONENT DESC: Transfer Hose
Condition: Damaged By Earlier Event
Due 6 April 2003
Resolved 2 April 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 5 December 2002
Resolved
Prior to loading or off loading cargo, barge must have a periodic inspection as required by 46 CFR 31.17(b).
As of 20SEP2002, certificate of inspection for this barge is invalid due to the 90 day grace period for inspections expiring.
Due 6 January 2003
Resolved 2 April 2003
Deck/Cargo
Issued 11 July 2001
Resolved
PRIOR TO TRANSFERRING CARGO, ENSURE CARGO HEADER HAS A RELIEF VALVE AND THAT IT IS PROPERLY SET.
Condition: Unknown
Due 16 July 2001
Resolved 16 July 2001
Deck/Cargo
Issued 11 July 2001
Resolved
PRIOR TO TRANSFERRING CARGO, ENSURE CARGO HEADER AND HOSES (4) ARE HYDROSTATICALLY TESTED AS PER 33 CFR 156.170.
Condition: Unknown
Due 28 August 2001
Resolved 19 April 2002
Resolution: Cargo header and all transfer hoses have been tested.
Lifesaving
Issued 11 July 2001
Resolved
ENSURE VESSEL HAS MATERIAL SAFETY DATA SHEETS FOR ALL CARGOES CARRIED, INCLUDING THE PRODUCT STORED IN THE 55-GALLON DECK DRUMS.
Condition: Unknown
Due 28 August 2001
Resolved 19 April 2002
Resolution: All applicable MSDS'' are located on the vessel.
Deck/Cargo
Issued 11 July 2001
Resolved
PRIOR TO TRANSFERRING CARGO, ENSURE VESSEL HAS A SET OF TRANSFER PROCEDURESTHAT MEETS THE REQUIREMENTS OF 33 CFR 155.750.
Condition: Unknown
Due 28 August 2001
Resolved 19 April 2002
Resolution: Reviewed cargo transfer procedures and found them accurate.