← All vessels
HURON
HURON is a 2010 tank ship. The Coast Guard has recorded 7 inspections since 2022, most recently in July 2026, along with 12 deficiencies and 1 operational control.
Records from 2022 to 2026. Most recent: inspection, 28 July 2026.
- Built
- 2010
- Last inspected
- 28 July 2026
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 12 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9457878
9HA2520
1119998
Flag
MARSHALL ISLANDS
Maury page id
psix-1119998
Inspections, by type
The 7 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it12890 - Simplified, Gross Ton
12890 - Convention (Subpart B), Gross Ton
12890 - Displacement, Ton
6669 - Convention (Subpart B), Net Ton
21224 - Dead Weight, Ton
12890 - Convention (Subpart B), Gross Ton
12890 - Displacement, Ton
6669 - Convention (Subpart B), Net Ton
21224 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 7
28 July 2026
COC-CHEM & TVE Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8448576
9 August 2025
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8197920
27 November 2022
In-Service Inspection · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7599930
10 November 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7592591
4 September 2022
PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7549555
6 June 2022
COC-CHEM & TVE Renew · Deficiency Check · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7464079
12 May 2022
Administrative Inspection
Administrative · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 7449086
Deficiency record · 12
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 4 September 2022
Resolved
SHIPS SHALL BE DESIGNED, CONSTRUCTED, AND MAINTAINED IN COMPLIANCE WITH THE STRUCTURAL MECHANICAL + ELECTRICAL REQUIREMENTS OF A CLASSIFICATION SOCIETY. FIXED GAS DETECTION SYSTEM WAS FOUND INOPERABLE.
74 SOLAS (20) II-1/3-1
14 - Pollution Prevention › 148 - Ballast Water › Ballast water report
Issued 4 September 2022
Resolved
FOR ANY VESSEL THAT IS EQUIPPED WITH BALLAST WATER TANKS AND BOUND FOR PORTS OR PLACES IN THE UNITED STATES: SUBMIT THE BALLAST WATER REPORT NO LATER THAN 6 HOURS AFTER ARRIVAL AT THE PORT OR PLACE OF DESTINATION. PSCO DISCOVERED VESSEL HAS NOT SUBMITTED BALLAST WATER REPORT TO NATIONAL BALLAST WATER INFORMATION CLEARINGHOUSE AFTER BERTHING 24 HOURS PRIOR TO EXAM.
33 CFR 151.2060(b)(3)
14 - Pollution Prevention › N/A - No Subsystem › VGP: Notice of Intent (NOI)
Issued 4 September 2022
Resolved
IF YOUR VESSEL IS GREATER THAN OR EQUAL TO 300 GROSS TONS OR THE VESSEL HAS THE CAPACITY TO HOLD OR DISCHARGE MORE THAN 8 CUBIC METERS (2,113 GALLONS) OF BALLAST WATER, YOU MUST SUBMIT A SIGNED AND CERTIFIED, COMPLETE + ACCURATE NOI IN ACCORDANCE WITH THE REQUIREMENTS OF APPENDIX E. VESSEL DID NOT HAVE A VGP AND DID NOT SUBMIT A NOTICE OF INTENT (NOI). OBTAIN VGP PRIOR TO DISCHARGE TO INCLUDE BALLAST WATER
2013 VGP 1.5.1.1
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 6 June 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured. Port State Control examiners identified severely corroded electrical piping for deck lighting on the cargo deck, materiel condition of the cables could not be verified.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 6 June 2022
Resolved
The Inert Gas System shall be capable of inerting, purging, and gas-freeing empty tanks and maintaining the atmosphere in cargo tanks with the required oxygen content. Port State Control examiners attempted to test the Inert Gas Generator system and found it to be inoperable. Ship's Maintenance log indicates system was found in good condition, however, vessel's crew stated system has be down for two months. Multiple issues were found with the system, scrubber overboard discharge valve siezed in the closed position, broken sea water valve handle requiring use of wrench to open/close, and actuator for the burner unit was broken off mount.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 6 June 2022
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical, and electrical requirements of a classification society. Port State Control examiners identified the Fixed Gas Detection panel door located in Cargo Control Room had been modified with no evidence of Classification Society or Flag State approval. Examiners observed that the panel door had a 4" x 4" cutout with a fan installed to pull air into the gas panel.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 6 June 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Port State Control examiners identified 5 additional panel modifications made to electrical panels in Engine Control Room with no evidence of Classification Society/Flag State approval. Panels had cut out and fan installed.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 6 June 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured. Port State Control examiners identified the mounting bracket to the starboard manifold Emergency Shutdown Device to be heavily corroded and broken off from mount.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 6 June 2022
Resolved
Each operation described in paragraph 2 shall be fully recorded without delay in the Oil Record Book Part I, so that all entries are logged within the book. Each page shall be signed by the officer or officers in charge of the operation and shall be signed by the master of the ship. Reviewing the Oil Record Book, Part 1, Port State Control Officers observed the last 6 pages had not been signed by the Master of the ship.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 June 2022
Resolved
Ships shall be designed, constructed, and maintained in compliance with the structural, mechanical, and electrical requirements of a Classification Society which is recognized by the Administration in acceptance with the provisions of regulation X1-1/1. Port State Control Examiners observed pin-hole leak on the main #1 Sea water pump in the engine room.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 June 2022
Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be - 1) Painted in the sequence of re/yellow/red. The width of the red bands must be 0.l meter (0.33 foot) and the width of the middle yellow band must be 0.8 meter (2.64); and labeled with thew word VAPOR painted in black letter at least 50.8 millimeter (2 inches) high. Port State Control examiners observed the required painted dimensions of red/yellow/red did not meet the required widths, approximately a foot shorter than what is required.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 June 2022
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. Based on the overall materiel condition of the vessel as substantiated by the objective evidence cited above, an additional external verification is required.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.