13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 July 2026
No resolution recorded
Hydraulic power-operated steering gear shall be provided with the following: a fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir, where the main steering gear is required to be power-operated. The storage tank shall be permanently connected by piping in such a manner that the hydraulic systems can be readily recharged from a position within the steering gear compartment and shall be provided with a contents gauge. MI found contents gauge on hydraulic steering storage tank damaged. 74 SOLAS (2020) II-1 / 29.12.3
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 July 2026
No resolution recorded
Electrical equipment and wiring shall not be fitted in enclosed cargo spaces or vehicle spaces unless it is essential for operational purposes in the opinion of the Administration. However, if electrical equipment is fitted in such spaces, it shall be of a certified safe type***** for use in the dangerous environments to which it may be exposed. The electrical wiring, junction boxes, and explosion-proof lighting fixtures located throughout the port and starboard cargo discharge tunnels are severely degraded, broken, or missing, compromising the explosion-proof rating of these spaces and creating an active ignition source in a hazardous atmosphere.
74 SOLAS (2020) II-2 / 19.3.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 July 2026
No resolution recorded
Pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. MI found Potable Water Hydrophore to appear to have multiple areas leaking on pressure vessel.
74 SOLAS (2020) II-1 / 26.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 27 July 2026
No resolution recorded
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the spaces being ventilated. The means of closing shall be easily accessible as well as prominently and permanently marked and shall indicate whether the shut-off is open or closed. The permanent, approved weathertight and fire-closing cover for the portside aft superstructure HVAC supply intake has been removed to facilitate the routing of temporary flexible ventilation ducting. The temporary closure installed around the ducting (consisting of thin sheetmetal) does not meet the structural strength or fire-rating requirements of closure.
74 SOLAS (2020) II-2 / 13.1.2
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Shore - Ship
Issued 27 July 2026
No resolution recorded
For all ships the means of embarkation and disembarkation shall be inspected and maintained** in suitable condition for their intended purpose, taking into account any restrictions related to safe loading. The steel deck-mounting structures and securing brackets for the port and starboard embarkation ladders show signs of severe corrosion.
74 SOLAS (2020) II-1 / 3-9.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 27 July 2026
No resolution recorded
Manholes and flush scuttles in position 1 or 2 or within superstructures other than enclosed superstructures shall be closed by substantial covers capable of being made watertight. Unless secured by closely spaced bolts, the covers shall be permanently attached. The main deck watertight manhole covers for BWT's were observed to be missing multiple securing studs and bolts. BWT sounding tubes could no longer be secured.
ICLL 1966 Annex I / II.18.1
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 27 July 2026
Resolved
Efficient guard rails or bulwarks shall be fitted on all exposed parts of the freeboard and superstructure decks. The height of the bulwarks or guard rails shall be at least 1 metre (39½ inches) from the deck, provided that where this height would interfere with the normal operation of the ship, a lesser height may be approved if the Administration is satisfied that adequate protection is provided. The portside weather deck guard railing is missing a section.
ICLL 1966 Annex I / II.25.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026
Resolved 14 August 2026
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 27 July 2026
No resolution recorded
The purpose of this regulation is to provide means of escape so that persons on board can safely and swiftly escape to the lifeboat and liferaft embarkation deck. For this purpose, the following functional requirements shall be met:escape routes shall be maintained in a safe condition, clear of obstacles.
Temporary flexible HVAC ventilation ducting was observed running through the aft exterior ladder well. This obstruction prevents rapid evacuation during an emergency.
74 SOLAS (2020) II-2 / 13.1.2
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 July 2026
No resolution recorded
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured. The electrical installations on the main weather deck are degraded and present active shock and fire hazards to the crew. The cable sheathing in numerous areas is frayed and cracked, exposing the inner insulated conductors.
74 SOLAS (2020) II-1/40.1.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2026 — due date passed with no resolution recorded
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 June 2025
Resolved
The company should ensure that inspections are held at appropriate intervals (10.2.1) and records of these activites are maintained (10.2.4). As noted on deficiencies numbered 2, 3, and 11, the vessel shows evidence of a systematic failure of their Safety Management System (SMS), specifically regarding maintenance and operational procedures. The vessel is required to conduct an external ISM aduit.
Cite: SOLAS 74(20) IX/3.1, ISM 10.2
Action taken: 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 30 June 2025
Resolution: Received email from [name withheld], company's Marine Superintendent, with LR's report 2302451. Deficiency has been closed as per report.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 June 2025
Resolved
The following functional requirements shall be met: Fire-Extinguishing appliances shall be readily available. Fir detection systems are serviced annually, but the crew does not have means to conduct functional tests onboard between services. SMS states that the fire detection systems shall be functionally tested regularly.
Cite: SOLAS 74 (04) II-2/10.1.2
Action taken: 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 4 August 2025
Resolution: Received pictures showing evidence that the company but a new tester to conduct regular fire detection tests.
10 - Safety of Navigation › N/A - No Subsystem › Navigation records
Issued 17 June 2025
Resolved
A record shall be kept to the satisfaction of the Administration and as required by the Radio Regulations of all incidents connected with radiocommunication service, which appear to be of importance to Safety to life at sea. Ships radio logbook did not contain any records of daily, weekly, or monthly checks as stated in their SMS procedures.
Cite: SOLAS74(20) IV/17
Action Taken: 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 30 June 2025
Resolution: Class sent in Statement of Fact documentation attesting to rectification of deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2025
Resolved
Cables shall be installed and supported in such a manner as to avoid chafing or other damage. The electrical cables for sensing devices in the fuel oil purifier room are melting due to contact with hot surfaces.
Cite: SOLAS74(04) II-1/5.5
Action Taken: 17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2025
Resolution: Received CE statement and Class report stating cable had been properly re-positioned and insulated wihtin space to prevent any further damages.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 17 June 2025
Resolved
The condiction of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. The air compressor is blocking the escape route access.
Cite: SOLAS74(04) I/11(a)
Action Taken: 16ac
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 4 August 2025
Resolution: Received pictures showing evidence that air compressor was no longer blocking the exit.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 17 June 2025
Resolved
The machinery and associated piping systems and fittings shall be of a design and construction adqeuate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons onboard, due regard being paid to moving parts, hot surfaces and other hazards. The rotating gear was missing guards on the stripping pumps. The port side main shaft is missing a handrail.
Cite: SOLAS74(04) II-1/26.1
Action taken: 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 30 June 2025
Resolution: Received email from [name withheld], company's Marine Superintendent, with LR's report 2302451. Deficiency has been closed as per report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 17 June 2025
Resolved
The following functional requirments shall be met: the ignitablity of combustible materials shall be restricted. The port side engine room tank top deck overhead pipe has a drip of bunkering fuel, which is imprequating its insulation.
Cite: SOLAS74(04) II-2/4.1.3
Action taken: 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 30 June 2025
Resolution: Class sent in Statement of Fact documentation attesting to rectification of deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2025
Resolved
The Administration shall take approriate steps to ensure uniformity in the implementation and application of the provisions of this part in respect of electrical installations. The junction box for speed pickup is not permanently attached on the port shaft guard.
Cite: SOLAS74(04) II-1/40.2
Action Taken: 16ac
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 30 June 2025
Resolution: Class sent in Statement of Fact documentation attesting to rectification of deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2025
Resolved
The Administration shall take approriate steps to ensure uniformity in the implementation and application of the provisions of this part in respect of electrical installations. Found a 575VAC ground on the main switch board.
Cite: SOLAS74(04) II-1/40.2
Action Taken: 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 18 August 2025
Resolution: Received class report(LR) attesting to corrective action closed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 June 2025
Resolved
The condiction of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or presons onboard. The heat trace panel in the fuel oil purifier room is intermittently blinking and appears not to be working correctly.
Cite: SOLAS74(04) I/11(a)
Action Taken: 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2025
Resolved 18 August 2025
Resolution: Received class report(LR) attesting to corrective action closed.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 17 June 2025
Resolved
Shipboard incineration of polyvinyl chlorides (PVCs) shall be prohibited, expect in shipboard incinerators for which IMO Type approved certifications have been issued. The current incierator was built in 2005. However, the vessel's SMS section 08.01.08 "Garbage Incineration" states the following items are prohibited at anytime: polyvinyl chloride plastics (PVCs) and is only allowed in new incinerators that meet the requirments of regulation 16.6.1 of MARPOL Annex VI. The vessels incinerator was built before that regulation came into effect.
Cite: MARPOL Annex VI/16.3
Action Taken: 16ac
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 30 June 2025
Resolution: Class sent in Statement of Fact documentation attesting to rectification of deficiency.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 17 June 2025
Resolved
Fire-Fighting systems and appliances shall be kept in good working order and readily available for immediate use. Emergency fire pump was not immediately available for use and took over 45 minutes to start the emergency fire pump.
Cite: SOLAS74(04) II-2/14.2.1.2
Action Taken: 60ac/10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 17 June 2025
Resolution: Prior to departing the vessel, crew was able to start and use the emergency fire pump.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 June 2025
Resolved
The following functional requirements shall be met: Ignition sources shall be seperated from combustale materials and flammable liquids. There were combustable materials stored behind the emergency generator switchboard.
Cite: SOLAS74(04) II-2/4.1.5
Action taken: 10c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 17 June 2025
Resolution: Vessel's crew moved the combustible materials prior to PSC Team departing vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 14 July 2023
Resolved
01-11199-Life saving appliances shall be stowed ready for immediate use. The port quarter life ring was blocked by on deck consumables for ballast system. SOLAS 74/14 CON Chp. III Reg. 20.2 - 10C
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 14 July 2023
Resolved 14 July 2023
Resolution: Deck consumables were moved.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 July 2023
Resolved
02=08199-An audible and visual alarm for high water must be fitted in the FPT of a bulk carrier. The FPT alarm is not operational. SOLAS 74/14 CON Chp. XII Reg. 12.1.3 - 40AC
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 July 2023
Resolved 18 July 2023
Resolution: Float was found to be jammed, vessel cleared float. tested and found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 July 2023
Resolved
03-07113-Fire fighting systems shall be kept in good working order. Main fire piping STB between frame 170-165 and 90-95 both are leaking. SOLAS 74/14 CON Chp. II-2 Reg, 14.2.1.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2023
Resolved 18 July 2023
Resolution: Three expansion joints in the fire line renewed. Fire line tested at 6.5 bar pressure using Main fire pump and no leakage evidenced.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 July 2023
Resolved
04-07106-Fire detection shall be provided suitable for the nature of the space. Fire detection in the purifier room has exposed wires. SOLAS 74/14 CON Chp. II-2 Reg 7.1.1
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 14 July 2023
Resolved 14 July 2023
Resolution: Fire detection was properly installed.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 July 2023
Resolved
05-08199-Bulk carriers shall be fitted with audio and visual alarms in each cargo hold for water ingress. Cargo hold #1,2,5,and 6 alarms are not operational. SOLAS 74/14 CON Chp. XII Reg. 12.1.1
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 July 2023
Resolved 18 July 2023
Resolution: Class required parts to be ordered. Parts arriving 25JUL23 with a required due date of 13AUG23 for repairs to be made.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Approved method
Issued 23 December 2021
Resolved
The equipment shall be maintained to conform with the provisions of this annex and no changes shall be made in the equipment, systems, fittings, arrangements or material covered by the survey, without the express approval of the Administration. The direct replacement of such equipment and fittings that conform with provisionsof this annex is permitted, PSCO noted exhause scrubber and new fuel on board is not compliant with IAPP supplement.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 December 2021
Resolved 23 December 2021
Resolution: New IAPP certificate supplement issued, see narrative.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Sulphur oxides
Issued 22 December 2021
Resolved
The sulfur content of any fuel oil used on board ships shall not exceed the following limits: 0.50% m/m on and after January 1, 2020. Vessel reported that their scrubber system for their exhaust malfunctioned while in transit to Thunder Bay. They had to switch over to non-compliant IFO380 fuel for the remainder of their transit. (MARPOL 73/78 (2011) ANNEX VI Reg 14.1.3)
Action required: 15 - Rectify deficiencies by next port
Resolved 22 December 2021
Resolution: Vessel is operating on compliant fuel and is bunkering compliant fuel in Duluth, MN.