Records from 2016 to 2025. Most recent: inspection, 25 September 2025.
Documentation record
Registered dimensions (L × B × D)156.4 ft × 31.0 ft × 13.4 ft
Registered tonnagegross 96 / net 66
ITC dimensions (L × B × D)156.4 ft × 31.0 ft × 13.4 ft
ITC tonnagegross 409 / net 122
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE, LA, UNITED STATES · built 2012
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCHALMETTE, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 4 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it409 - Convention (Subpart B), Gross Ton
96 - Regulatory (Subpart C or D), Gross Ton
122 - Convention (Subpart B), Net Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 14
25 September 2025
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8238742
16 January 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8063939
10 June 2024
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7929263
17 November 2023
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7818792
25 April 2023
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7675138
10 January 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7619638
29 June 2022
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7490348
3 November 2021
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7344060
1 February 2021
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7133922
8 December 2020
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7107792
18 February 2020
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6911122
26 November 2018
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6586420
14 November 2018
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6580299
22 June 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6134803
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 25 September 2025
Resolved
An interconnected detection and alarm system must be installed so that the actuation of the alarm in one area results in both audible and visual alarms in all areas required to be protected by the interconnected detection and alarm system. Sound fire alarm works well within crew berthing but a visual alarm isn't triggered.
46 CFR 181.450(a)(2)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2025
Resolved 5 November 2025
Resolution: Interconnected fire detection installed in all required areas.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 September 2025
Resolved
Paint and flammable liquid lockers must be constructed of steel or equivalent material, or wholly lined with steel or equivalent material. Paint locker on deck was constructed of aluminum.
46 CFR 177.405(d)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2025
Resolved 5 November 2025
Resolution: All paint removed from locker. Vsl rep to either line with steel or replace.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 25 September 2025
Resolved
The ring, lines, and letters of the load line markings assigned shall be painted in white or yellow on a dark background and permanently marked. Vessel did not have letters on load line permanently marked.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2025
Resolved 29 September 2025
Resolution: ABS cleard deficiency.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 September 2025
Resolved
Emergency egress training for each member of the crew should be done monthly and when new crew member joins and be logged. Vessel has not been consistent with frequency of egress drills, being done every two months, because it was not included in the drills schedule.
46 CFR 185.420(b)(3)
Action required: 10 - Deficiency Rectified
Resolved 25 September 2025
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 25 September 2025
Resolved
A penetration in a watertight bulkhead must be watertight. A cable is penetrating through the bulkhead between machinery room and rudder room without watertight/fire resistance insulation.
46 CFR 179.320(c)
Action required: 10 - Deficiency Rectified
Resolved 25 September 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 September 2025
Resolved
The construction of a vessel must allow the safe operation of the vessel giving consideration to provisions for a seaworthy hull. Weld connecting starboard inboard MDE exhaust piping to the side shell was cracked.
46 CFR 116.610(d)
Action required: 10 - Deficiency Rectified
Resolved 25 September 2025
Resolution: Vessel rewelded prior to conclusion of inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 17 November 2023
Resolved
Vessel shall remain watertight and maintain damage stability. Multiple WTD in the ER spaces were found with loose dogs and/or allowed air to flow between watertight boundaries.
46 CFR 179.330(b)
Action required: 10 - Deficiency Rectified
Resolved 17 November 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 November 2023
Resolved
All machinery and equipment must be installed to provide protection from causing a fire, explosion, machinery failure, and personnel injury. MDE #3 reduction gear cooler inlet has a slow leak of oil at the inlet fitting.
46 CFR 181.200
Action required: 10 - Deficiency Rectified
Resolved 17 November 2023
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 1 February 2021
Resolved
Required to be able to recover a helpless person from the water. Rescue platform onboard had wasted cables, preventing a helpless person to be safely recovered.
46 CFR 180.210
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 February 2021
Resolved 1 February 2021
Resolution: Cables replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 February 2021
Resolved
Steering gear must be of adequate strength and capable of steering the vessel at all service speeds. Port Rudder ram has a pin that is not in proper position to ensure that it will not fall out.
46 CFR 182.610(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 February 2021
Resolved 1 February 2021
Resolution: Rudder Pin removed and new pin with locking device installed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 1 February 2021
Resolved
Each control valve shall be marked to indicate the space served. The remote engine room fixed CO2 station on the bridge is not marked.
46 CFR 185.612(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 February 2021
Resolved 10 February 2021
Resolution: Received Photos of placard
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 February 2021
Resolved
Spaced protected by fixed CO2 shall be marked with CO2 warning signs 185.612(g)(2).Spaces storing CO2 shall be marked 185.612 (g)(1). Generator and engine rooms not marked with protected verbiage and rudder room not marked with storage verbiage.
46 CFR 185.612(g)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 February 2021
Resolved 2 February 2021
Resolution: Required markings in place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 February 2020
Resolved
Wet Exhaust System for #1 & #4 should not have leaks nor temporary repairs. Vessel was found to have a leak on the #4 Wet Exhaust System and temporary repairs on #1 Wet exhaust system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2020
Resolved 27 February 2020
Resolution: Vessel rep emailed pictures showing welding repairs of the wet exhaust system for the main engines to the satifaction of the Marine Inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 19 February 2020
Resolved
Vessel shall have the full markings for load lines. Vessel did not have the deck line marked on the starboard side.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2020
Resolved 27 February 2020
Resolution: Vessel rep emailed pictures of the both port and starboard deckline above the Pimsol mark to the satisfaction of the USCG Marine Inspector.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 19 February 2020
Resolved
Vessel shall maintain up to date charts. Vessel did not have up to date charts. Charts were printed in Jan 2020.
Action required: 10 - Deficiency Rectified
Due 3 March 2020
Resolved 19 February 2020
Resolution: Discussed with captain and vessel rep about making chart corrections.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 February 2020
Resolved
Engine Room and Generator Room Watertight doors are required to be watertight. Watertight doors were observed to allow airflow through.
Action required: 10 - Deficiency Rectified
Due 19 February 2020
Resolved 19 February 2020
Resolution: Vessel Crew adjusted watertight doors to be watertight to the satisfaction of the Marine Inspector.