Records from 1997 to 2011. Most recent: inspection, 11 June 2011.
Documentation record
Registered dimensions (L × B × D)52.5 ft × 19.0 ft × 7.4 ft
Registered tonnagegross 56 / net 38
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPARKER BRO. CO., INC. · HOUSTON, TX, UNITED STATES · built 1972
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHUNT, TX
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itTowing Vessel
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it38 - Regulatory (Subpart C or D), Net Ton
56 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 14
11 June 2011
Type not recorded
No type recorded · Station Galveston · USCG Heartland District (CGD-H) · Activity 4042252
8 August 2008
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3292716
30 June 2005
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2408895
2 June 2005
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2383033
26 June 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 180275
23 May 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 290434
28 January 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 102588
27 July 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 770730
22 July 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 209240
5 May 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 415645
5 May 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 514561
26 April 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 136593
26 April 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 508208
24 October 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 450588
Construction/Loadline › Hull › Hull Plating
Issued 7 June 2005
Resolved
Repair all holes in ssideshell and deck plating.
Condition: Improper/Lack of Maintenance
Due 2 July 2005
Resolved 8 June 2005
Personnel › Certificates/Documents/Licenses › License, Master
Issued 2 June 2005
Resolved
Vessel could not demonstrate that it was being operated by a properly licensed Master.
Condition: Unknown
Due 2 July 2005
Resolved 8 June 2005
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 2 June 2005
Resolved
Repair shaft packing to minimize water ingress
Condition: Improper/Lack of Maintenance
Due 2 July 2005
Resolved 7 June 2005
Engineering › Fuel Oil Service System › Piping
Issued 2 June 2005
Resolved
Renew worn rubber fuel hose from filter to pipe on port engine.
Condition: Improper/Lack of Maintenance
Due 2 July 2005
Resolved 7 June 2005
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 2 June 2005
Resolved
Install required remote fuel shutoff valves outside of the engine room
Condition: Unknown
Due 2 July 2005
Resolved 7 June 2005
Engineering › Bilge Water Management System › Pump
Issued 2 June 2005
Resolved
Provide proper operation of the bilge pump.
Condition: Improper/Lack of Maintenance
Due 2 July 2005
Resolved 8 June 2005
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 2 June 2005
No resolution recorded
Provide an echo depth finder onboard vessel.
Condition: Unknown
Due 2 July 2005 — due date passed with no resolution recorded
Documentation › Markings/Placards › Oil Discharge Placard
Issued 2 June 2005
No resolution recorded
Provide and post a oil discharge warning placard
Condition: Unknown
Due 2 July 2005 — due date passed with no resolution recorded
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Location
Issued 2 June 2005
No resolution recorded
Provide an approved B-V semi portable fire fighting extinguisher satisfying requirements of a required fire suppresion system onboard towing vessels.
Condition: Unknown
Due 8 September 2005 — due date passed with no resolution recorded
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 2 June 2005
Resolved
Remove excessive oil from bilge
Condition: Improper/Lack of Maintenance
Due 2 July 2005
Resolved 8 June 2005
Lifesaving › Buoyant Apparatus › Serviceable
Issued 23 May 2001
Resolved
RING BUOY TORN. 46 CFR 25.25-5(b)
Condition: Unknown
Due 30 May 2001
Resolved 14 November 2006
Documentation
Issued 23 May 2001
Resolved
VESSEL LOG OF TEST AND INSPECTONS WAS MISSING. 33CFR 164.78(b).
Condition: Unknown
Due 23 May 2001
Resolved 25 May 2001
Navigation
Issued 23 May 2001
Resolved
TOWING LIGHTS BURNED OUT. 33USC 2024(1).
Condition: Unknown
Due 23 May 2001
Resolved 25 May 2001
Documentation › Markings/Placards › Garbage Placard
Issued 23 May 2001
Resolved
PROHIBITED DISCHARGE PLACARDS MISSING.33CFR 155.450
Condition: Unknown
Due 23 June 2001
Resolved 14 November 2006
Documentation › Markings/Placards › Oil Discharge Placard
Issued 23 May 2001
Resolved
MARPOL PLACARD MISSING. 33CFR 151.59
Condition: Unknown
Due 23 June 2001
Resolved 14 November 2006