Records from 2016 to 2026. Most recent: inspection, 30 June 2026.
Inspection history · 25
30 June 2026
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8418625
14 May 2026
Administrative Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8418505
24 March 2026
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8330224
4 August 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8202857
11 October 2024
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8025938
31 January 2024
Drydock Exam · In-Service Inspection · Examination of Repairs · Damage Survey · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7858897
31 January 2024
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7861471
21 November 2023
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7828718
17 October 2023
Deficiency Check · Annual Inspection · Drydock Extension
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7809899
3 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7803754
16 August 2022
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7534960
22 July 2022
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7504544
23 June 2022
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7485146
15 September 2021
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7829726
1 April 2021
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7165068
30 January 2020
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6914700
22 October 2019
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6843323
2 November 2018
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6573105
29 December 2017
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6330291
27 October 2017
Drydock Extension · Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6296336
25 October 2017
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6293824
3 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6298784
2 November 2016
COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6033685
2 March 2016
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5825226
21 January 2016
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5801060
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 June 2026
Resolved
At each subsequent inspection for certification of a vessel, the managing operator shall be prepared to conduct tests and ready for inspections of machinery, fuel, and piping systems, including the following: Operational test of the means provided for pumping bilges. Port main engine PTO bilge pump had suction and discharge hoses connected backwards. Make repairs and demonstrate proper operation of bilge suction.
46 CGR 176.804(h) Prior to issuance of COI
Action required: 705 - Other - as specified
Resolved 30 June 2026
Resolution: Verified proper installation of port main engine bilge pump hoses. Observed satisfactory suction and discharge.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 June 2026
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (2 1/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. Vessel missing 2 fire buckets. 46 CFR 181.610
Action required: 705 - Other - as specified
Resolved 30 June 2026
Resolution: Verified all 3 fire buckets on board.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 30 June 2026
Resolved
Limited coastwise routes: A vessel on a limited coastwise route must carry — (1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter; Six hand orange smoke distress signals. 6 of 12 flares onboard are expired.
46 CFR 180.68
Action required: 705 - Other - as specified
Resolved 30 June 2026
Resolution: Verified 12 non-expired signal flares on board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 March 2026
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Repairs or alterations that affect the safety of the vessel include, steering, propulsion and power supply systems; alterations affecting stability; and repair or alteration of lifesaving, fire detecting, or fire extinguishing equipment. The owner or managing operator shall submit drawings, sketches, or written specifications describing the details of any proposed alterations to the cognizant [name withheld] alterations must be approved by the OCMI before work is started.
Company reported the vessel suffered machinery failures including transmissions. Due to financial constraints,
the company cannot make repairs at this time and will also miss the drydock deadline. COI deactivated. Vessel
must complete credit drydock prior to requesting a new COI inspection.
46 CFR 176.700
Action required: 705 - Other - as specified
Resolved 30 June 2026
Resolution: Vessel received drydock credit and obtained a COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 4 August 2025
Resolved
Gauges to indicate RPM, jacket water temp and oil pressure must be readily visible at the operating station.
Port and starboard YANMAR gauge panels are opaque and cracked. Replace gauges/panels.
46 CFR 182.410
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 August 2025
Resolved 30 June 2026
Resolution: Verified satisfactory operation of new Yanmar display units at the operating station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 January 2024
Resolved
46 CFR 176.700(a)
46 CFR 176.700(d)
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. The OCMI may require an inspection and testing whenever a repair or alteration is undertaken.
CASTAWAY 3 suffered a mechanical loss of propulsion control of the port engine. Determine the cause of the mechanical failure, complete all necessary repairs, provide a report addressing the scope of work completed and provide any associated invoices/ receipts. Upon receipt of these documents, marine inspectors will schedule a follow-up exam to conduct sea trials on the CASTAWAY 3.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2024
Resolution: Chainplate replaced and forestay chainplate inspected satisfactory and NDT tested satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 31 January 2024
Resolved
46 CFR 176.802 (a)(1)
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following:
(1) Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks
CASTAWAY 3 reported that during the return voyage mooring evolution, the Captain lost ability to control the port engine and the vessel subsequently allided with the pier. MI's observed full thickness FRP hull cracking above the waterline on the starboard stem approximately 5' vertical and 3" wide with daylight shining through. Provide repair plan to USCG and make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2024
Resolution: Verified satisfactory repairs completed back to original FRP layup schedule
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 October 2023
Resolved
46 CFR 176.802(a)(3)
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following:
Inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails.
Provide third party rigging survey in accordance with Preventative Maintenance Plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2023
Resolved 27 November 2023
Resolution: O/O provided 3rd party rigging survey to USCG on 27Nov2023. Survey was conducted on 24Nov2023.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 October 2023
Resolved
46 CFR 176.802(a)(3)
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails.
All inspected sailing vessel owner/operators should have a written Preventive Maintenance Plan (PMP) that specifically addresses their vessel’s sail rigging equipment and components. PMP not on board vsl.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2023
Resolved 13 November 2023
Resolution: PMP provided and satisfactorily reviewed against NVIC 02-16
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 17 October 2023
Resolved
46 CFR 176.814
At each subsequent inspection for certification the owner or managing operator shall be prepared to test the steering systems of the vessel and make them available for inspection to the extent necessary to determine that they are in suitable condition and fit for the service intended. **Port/Stbd steering flex hoses not suitable for service due to bulging/corrosion. Replace hoses.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 November 2023
Resolved 3 November 2023
Resolution: Verified steering hoses were satisfactorily replaced with SAE J-1942 spec.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 October 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to: protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. **Port side battery terminals corroded and rusted. Clean corrosion from battery terminals and remove standing water from tray.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 November 2023
Resolved 3 November 2023
Resolution: Verified battery terminals were cleaned of rust and corrosion.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 October 2023
Resolved
46 CFR 180.70
Ring life buoy not in serviceable condition due to ultraviolet sun damage. Replace life buoy.
Action required: 10 - Deficiency Rectified
Due 17 October 2023
Resolved 17 October 2023
Resolution: Lifebuoy replaced with new life buoy marked and mounted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 October 2023
Resolved
46 CFR 180.70(d)(1)
Ring life buoy light found with battery not authorized by manufacturer. Replace battery or with new light.
Action required: 10 - Deficiency Rectified
Due 17 October 2023
Resolved 17 October 2023
Resolution: Lifebuoy light new replacement.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 17 October 2023
Resolved
46 CFR 185.728
The master of the vessel shall ensure that: The EPIRB's battery is replaced after it is used, or before the date required by FCC regulations in 47 CFR part 80, whichever comes sooner. **EPRIB battery life expired.
Action required: 10 - Deficiency Rectified
Due 17 October 2023
Resolved 17 October 2023
Resolution: EPIRB battery replaced during inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 July 2022
Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers.
The fixed bilge pump system is inoperable. The vessel has submersible electric bilge pumps. Until the fixed bilge system is repaired the number of allowed passengers is reduced from 80 to 49.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 August 2022
Resolved 25 July 2022
Resolution: MSD MI's attended the vessel located in Frenchtown to verify the port installed bilge pump was working satisfactorly. All SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 22 July 2022
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot) applied to the top rail in any direction. The point and uniform loads do not need to be applied simultaneously.
The bottom of the railing support bar/rail mount have fractured welds just forward of the stairs on the port and starboard side. Total of 4 areas that need to be re-welded.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 August 2022
Resolved 16 August 2022
Resolution: Called out fractured welds have been satisfactorily repaired.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 22 July 2022
Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space being protected.
The portable extinguisher signage installed on the port and starboard main deck console is worn and unreadable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 August 2022
Resolved 16 August 2022
Resolution: Portable extinguisher signage has been replaced with new signage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 June 2022
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. Lazarette, machinery space, main deck non watertight hatch. MSD St. Thomas received notification of bilge alarms that are inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2022
Resolution: Attended vessel and verified proper operation of the bilge alarms.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 June 2022
Resolved
A self priming, power driven fire pump must be installed on each vessel that carries more than 49 passengers with the minimum capacity of 50 gallons per minute and not less than 60 PSI. MSD St. Thomas received notification of inoperable fire pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2022
Resolution: Attended vessel and verified proper operation of the fire pump.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 23 June 2022
Resolved
The master of the vessel shall ensure that (b) The EPRIB'S Battery is replaced after its used, or before the date required by the FCC reguaitons in 47, CFR part 80, whichever comes sooner. Attending MI's noted that the hydrostatic release expired 1 January 2022, and the EPRIB batteries expired 19 Feburary 2022.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 June 2022
Resolved 22 July 2022
Resolution: A new EPIRB hydrostatic release and new EPIRB batteries were installed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 November 2018
Resolved
Make permanent repairs to un secured structural fire protection in starboard engine room overhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 November 2018
Resolution: SFP proper pinned in place.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 November 2018
Resolved
Make permanent repairs to 12v socket in electrical panel.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 November 2018
Resolution: Outlet properly secured.
Communications › Radio Communications › VHF Radiotelephone
Issued 21 January 2016
Resolved
Prove proper VHF FM DSC operations.
Action required: 705 - Other - as specified
Due 4 February 2016
Resolved 2 March 2016
Resolution: Vessel installed working DSC-VHF Radio.