YANGTZE FOUNTAIN is a tank ship. The Coast Guard has recorded 3 inspections since 2011, most recently in May 2014, along with 2 deficiencies and 1 operational control.
Records from 2011 to 2014. Most recent: inspection, 3 May 2014.
The 3 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 12 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Share this recordDownload vessel cardDownload QRMaury, US Coast Guard vessel record for YANGTZE FOUNTAIN, retrieved 18 September 2026. mauryrecords.com/v/psix-1138046.html
Documentation record
Tonnage as PSIX records it156702 - Convention (Subpart B), Gross Ton 98937 - Convention (Subpart B), Net Ton 338766 - Displacement, Ton 297195 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 3
3 May 2014COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4848107
30 August 2011ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4115208
29 August 2011Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4115217
Deck/Cargo › Inert Gas System › Gas Regulating Valve
Issued 30 August 2011Resolved
1840 - Instrumentation - Automatic shutdown of the IG blowers and gas regulating valve shall be arranged when high gas temp limits are reached. Crew was unable to demonstrate the high temp alarm and subsequent system shutdown. Repairs required prior to cargo operations and to the satisfaction of the U.S. Coast Guard or Class. FSS Code Ch. 15.2.3.1.5.1.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 August 2011
Resolved 31 August 2011
Resolution: Deficiency cleared, see attached ABS report.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 30 August 2011Resolved
1840 - Instrumentation - Means shall be provided for continuously indicating the temp and pressure of the IG at the discharge side of the gas blowers whenever the gas blowers are operating. Temp indicator in the CCR is inoperable and does not indicate the correct IG temp. Repaires required prior to cargo operations and to the satisfaction of the U.S. Coast Guard or Class. FSS Code Ch. 15.2.4.1.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 August 2011
Resolved 31 August 2011
Resolution: Deficiency cleared, see attached ABS report.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.