← All vessels
HAATO
HAATO is a 2011 freight ship. The Coast Guard has recorded 8 inspections since 2016, most recently in March 2026, along with 7 deficiencies and 2 operational controls.
Records from 2016 to 2026. Most recent: inspection, 31 March 2026.
- Built
- 2011
- Last inspected
- 31 March 2026
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 7 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9589786
V7A6298
1138493
Flag
MARSHALL ISLANDS
Maury page id
psix-1138493
Inspections, by type
…with no type recorded1
Years with a record
5 calendar years (2016–2026)
The 8 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it61472 - Dead Weight, Metric Ton
34778 - Convention (Subpart B), Gross Ton
72322 - Displacement, Metric Ton
20209 - Convention (Subpart B), Net Ton
34778 - Simplified, Gross Ton
20209 - Simplified, Net Ton
34778 - Convention (Subpart B), Gross Ton
72322 - Displacement, Metric Ton
20209 - Convention (Subpart B), Net Ton
34778 - Simplified, Gross Ton
20209 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 8
31 March 2026
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8329532
13 August 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7532243
29 March 2022
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7420939
6 February 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7391485
24 September 2021
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7314490
12 June 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6702067
21 November 2016
Deficiency Check · Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6042597
29 July 2016
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5942553
Deficiency record · 7
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 31 March 2026
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO identified inoperable water mist system. System valves to protected machinery not functioning properly. 74SOLAS(cons.)II-2/14.2.1.2 10c
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 June 2019
Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. Observed 12 of 24 high expansion foam nozzles in the engine room and engine control room clogged, corroded or leaking. 74SOLAS(09) II-2/14.2.1.2 30ac
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 June 2019
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Found temporary repairs on the fire main piping in engine room sea water cooling piping and the bilge and ballast pump piping. 74SOLAS(14)II-I/26.1 17ac
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 12 June 2019
Resolved
The machinery, boilers and other pressure vessels associated piping systems and fittings shall be of a design and construction adequate for which are intended. Port side mooring winch on bow has excessive hydraulic leak. 74SOLAS(14) II-I/26.1 17ac
Operations/Management › Pollution › Control of Garbage
Issued 21 November 2016
Resolved
Every ships 100 gross tonnage and above, shall carry a garbage management plan which the crew shall follow. This plan shall provide written procedures for minimizing, collecting, storing, processing and disposing of garbage. The vessel's designated garbage areas are full and garbage is being stored outside those spaces. provisions shall be taken to compact or dispose of garbage to comply with the
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 21 November 2016
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured. Vessel has installed an electrical connection in deck stores #4 that is improperly wired and is not protected by over current protection.
Lifesaving › Rescue Boat Equipment › Buoyant Line
Issued 21 November 2016
Resolved
Cargo ships shall carry at least one rescue boat complying with requirements of section 5.1 of the code. The normal equipment of every rescue boat shall consist of one buoyant line, not less than 50m in length. Rescue boat was not equipped with the buoyant line.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.